Flexible interconnections allow data centers to connect to the grid sooner without upgrading the grid infrastructure, if they accept limits on their grid power during periods of grid stress. When a limit is reached, the data center must slow some of its computing jobs. This choice sets the cost of flexibility, because the work done by a job is worth far more than the energy it uses. This paper models how jobs respond when their power is reduced, and proposes a real-time method that shares the available power among jobs according to their value. It also gives grid planners a simple measure of how much power a data center can reduce, and for how long. A one-year case study of a 100-MW data center shows that the proposed method lowers the cost of meeting grid limits, and that on-site generation and storage lower it further.

Paper details

vlnc:W_2cswj6dg
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
arXiv nonexclusive license
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…