Dynamic and Risk-Aware Procurement of Fast Frequency Response from Electric Vehicles and Heat Pumps

Abstract

Low-inertia power systems increasingly rely on Fast Frequency Response (FFR) to keep the frequency nadir above under-frequency load-shedding thresholds without oversized Frequency Containment Reserve or synchronous inertia. This paper proposes two complementary methodologies that interface with an existing day-ahead FFR capacity market. On the Transmission System Operator (TSO) side, a dynamic procurement rule maps forecasted kinetic energy and contingency magnitude onto an offline neighborhood-need surface, yielding interval-wise FFR capacity requests rather than constant seasonal or annual volumes. On the aggregator side, a risk-aware, TSO-certifiable bidding strategy quantifies reliable FFR capacity from fleets of electric vehicles (EVs) and heat pumps (HPs) by offering lower conditional quantiles of day-ahead headroom at a prescribed delivery reliability. The resulting requests and offers are cleared through a pay-as-bid capacity auction. A Cyprus 2025 case study shows that dynamic neighborhood-based procurement yields an annual clearing cost of about EUR 476,000, which is 30%-33% lower than the seasonal and annual static rules and also below the UFLS VoLL of EUR 637,500 estimated from the fifteen real 2025 events with fmin <= 49 Hz. EV and HP offers meet their target delivery reliabilities, and RMS validation finds 46 of 50 operating points above 49 Hz at both full and 85% FFR delivery.

Paper details

vlnc:W_2g97cg23
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC-BY-NC-ND-4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…