betaFeedback

WorksEngineering

Stochastic Crew Placement for Winter Storm Restoration of Rural Distribution Feeders Considering Building Cooling Deadlines

Abstract

Winter storm outages on rural distribution feeders may leave electrically heated houses cooling below acceptable indoor temperatures. This paper proposes a two-stage stochastic mixed-integer linear program for pre-storm crew placement that considers the building cooling deadline. Crews are placed before the storm, and repairs and reconnection are scheduled in each damage scenario to minimize the expected cost. Specifically, outage house-hours beyond the deadline are penalized, and feeder voltage and loading constraints account for cold load pickup at each reconnection. A case study on a synthetic rural feeder shows that the penalty shifts one of two crews toward a remote village, reducing expected house-hours beyond the deadline by 39 percent for 5.3 percent more outage house-hours. With three crews, the penalty does not change crew placement. Immediate reconnection would violate the voltage limit in four of six scenarios.

Paper details

vlnc:W_36v67kr8
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
arXiv nonexclusive license
Usage

views · 11

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Claude (Anthropic), ChatGPT (OpenAI)

View statement
Looking for related papers…