WorksComputer Science
Graph learning-assisted logic-based Benders decomposition for distributionally robust in-station train rescheduling under disruptions
Abstract
Resource closures, arrival delays, and processing-time extensions jointly alter station operations during disruptions. Uncertain reopening times further complicate decisions about holding trains and selecting alternative routes. We use observations of disruption-resolution stages to update conditional predictions of the remaining closure duration. A distributionally robust model accounts for errors in scenario probability estimates and jointly optimizes train routes, sequences, and timings. Logic-based Benders decomposition coordinates routing and resource scheduling. Conditional cuts exploit resource-use patterns, and a graph neural network guides the solution order of resource relaxations. Together, these components form the GNN-LBBD algorithm. Across 28 test instances for a five-track station, GNN-LBBD achieved a mean total completion delay of 61.13 train-min. This was 16.63% lower than tabu search and 20.06% lower than variable neighborhood search. Its mean total computation time was close to that of tabu search. On six representative instances, using stage observations reduced mean total completion delay by approximately 21.7%. Continued updating of reopening-time predictions allows route and entry-time adjustments during closures, reducing delays caused by waiting for reopening.
Introduction
Train operations within a station require coordinated use of platform tracks and station throats [1]. Resource closures restrict capacity, arrival delays alter operation timing, and processing-time extensions increase resource occupancy. Together, these disturbances may intensify resource conflicts and cause subsequent trains to wait and incur delays [2]. Field observations obtained during a closure also change dispatchers’ estimates of the reopening time. This study examines how these observations can inform train holding, route choice, and sequencing to reduce total completion delay.
Joint routing and timing optimization integrates resource selection and occupancy timing into a unified schedule. Carey and Carlville [3] studied train scheduling and platform assignment at busy stations. Pellegrini et al. [4] jointly optimized disrupted train routes and schedules using a detailed infrastructure representation. However, when the reopening time is specified as an input, schedule evaluation depends on the assumed resource-availability intervals. New observations may revise reopening-time estimates and change the expected losses and ranking of candidate schedules. This connects prediction updates with subsequent scheduling adjustments.
Uncertainty in reopening times makes schedule comparisons depend on both possible resource-availability times and their probabilities. Corman and Kecman [5] used Bayesian networks to update train delay distributions as new information became available. Ben-Tal et al. [6] used probability uncertainty sets to account for errors in estimated probabilities. Yang et al. [7] developed a distributionally robust model for joint timetable and maintenance-window rescheduling under uncertain disruption duration. Within a station, different routes and operation sequences yield different completion delays across scenarios. Changes in probability estimates may therefore alter the loss ranking of candidate schedules. Routing, sequencing, and timing optimization should account for both conditional predictions from field observations and errors in probability estimates.
Discrete route choices and multiresource occupancy constraints couple scheduling decisions across reopening scenarios. Elçi and Hooker [8] used logic-based Benders decomposition to coordinate discrete decisions and scenario losses through master and scheduling subproblems. Varga et al. [9] used graph neural networks to assist cut strengthening and reduce the required number of subproblem solves. Cuts conditioned on complete route combinations restrict scheduling lower bounds to the corresponding combinations. Different combinations may nevertheless share train–resource use patterns. These shared patterns provide a basis for extending the applicability of scheduling lower bounds. Resource relaxations also differ in their lower-bound gains and solution times. Their solution order therefore affects lower-bound strengthening within a limited computation budget.
We develop a distributionally robust in-station train rescheduling model that updates reopening-time predictions with field observations. GNN-LBBD solves the model using graph learning-assisted logic-based Benders decomposition. The main contributions are as follows:
We integrate conditional predictions of the remaining closure duration with train routing, sequencing, and timing. A scenario probability ambiguity set accounts for probability estimation errors. Decisions remain consistent across scenarios with identical observation histories.
We construct conditional cuts from train–resource use patterns. Single-resource scheduling lower bounds remain applicable to different route combinations satisfying these conditions. A graph neural network learns lower-bound gains per unit of solution time to guide the solution order of resource relaxations.
Prediction comparisons distinguish the effects of using observations from those of the prediction representation. Execution records link revised reopening-time estimates to route choices, entry times, and subsequent delays. Further experiments examine scheduling performance under closure-duration prediction errors.
Related work
In-station train routing and timing optimization
In-station train scheduling models differ in how closely they integrate track assignment, route choice, and timing. Zwanenveld et al. [10] formulated in-station routing as a node-packing problem. Billionnet [11] used integer programming to assign trains to available tracks. Caprara et al. [12] incorporated route and timing adjustments into track assignment. Caimi et al. [13] integrated conflict-free routing and timing in a resource-constrained multicommodity flow model. Scheduling adjustments therefore concern both resource selection and the timing of resource occupancy.
The granularity of the resource representation further determines which conflicts a model can identify. Rodriguez [14] used constraint programming for real-time train scheduling at a railway junction. Kumar et al. [15] applied constraint programming to scheduling at large terminal stations. Cardellini et al. [16] described in-station train operations using automated planning. Schutt et al. [17] represented train movements and stops through section-occupancy constraints and compared constraint models and search strategies. Section-level representations capture shared resources and their release order along arrival and departure routes. Train entry times are consequently constrained by both platform-track and throat resources.
Train rescheduling under uncertainty
Uncertainty in disruption duration, running times, and dwell times affects both feasible train schedules and their associated losses. Zhan et al. [18] systematically reviewed uncertainty in train timetable rescheduling and the methods used to address it. Zhu and Goverde [19] considered uncertain disruption duration in a rolling horizon. They updated scenarios using predictions of the disruption end time and adjusted timetables through two-stage stochastic programming.
Changes in future resource availability can thus inform subsequent schedules, rather than leaving the initial duration prediction unchanged.
Scenario probabilities, as well as scenario values, affect schedule evaluation. Yang et al. studied the joint rescheduling of train timetables and maintenance windows under uncertain disruption duration. They developed a rolling-horizon distributionally robust model and solved it with a generalized branch-and-Benders-cut algorithm. Their decisions cover train operations and maintenance arrangements. The uncertainty treatment concerns both disruption duration and scenario distributions. Conditional prediction updates revise future resource availability, whereas a probability ambiguity set accounts for distribution estimation errors. The two components address prediction information and scheduling loss evaluation, respectively.
Logic-based Benders decomposition and learning-assisted optimization
The coupling of routing and resource scheduling has motivated several solution approaches. Corman et al. [20] combined rerouting neighborhoods and a scheduling algorithm within a tabu search framework. Samà et al. [21] used variable neighborhood search to coordinate routes and timings for disrupted trains. Pellegrini et al. [22] developed RECIFE-MILP, a mixed-integer programming heuristic for real-time railway traffic management under detailed infrastructure constraints. These methods organize joint routing and scheduling adjustments through neighborhood search or mathematical programming.
Decomposition methods coordinate discrete choices and resource scheduling through feedback between a master problem and subproblems. Hooker [23] established a logic-based Benders framework that combines mixed-integer programming and constraint programming. Lamorgese and Mannino [24] exploited railway problem structure to develop an exact decomposition method for real-time dispatching. Han et al. [25] combined mixed-integer programming and constraint programming within logic-based Benders decomposition for integrated train formation and resource scheduling in marshalling yards. To reduce repeated solution effort, Leutwiler et al. [26] selected precomputed cut pools using delay similarity. Their method reuses solution information from similar instances while balancing the number of cuts against model size.
Graph learning can also directly generate scheduling decisions. Zhang et al. [27] modeled train platforming and rescheduling as a Markov decision process and used a graph neural network policy to select scheduling actions. Their learning target is a scheduling policy. In contrast, learning-assisted cut strengthening predicts task subsets for constructing decomposition cuts. The two approaches act on scheduling decisions and the optimization process, respectively.
Rescheduling model and solution method
Problem description and notation
The station layout is taken from the public benchmark of Schutt et al., as shown in Figure 1. It comprises two station throats and five platform tracks. Trains enter and leave the platform tracks through the throats. The station has 45 controlled resources: four boundary sections, 26 internal sections, and 15 platform sections. Each platform track contains three platform sections.

Figure 1. Station layout
Figure 2 illustrates four operational stages: entry waiting, arrival and dwell, departure waiting, and departure with resource release. Trains occupy and release sections sequentially along their selected routes. Waiting occurs at the entry or on a platform track. Routes and movement sequences must be coordinated when trains share throat or platform-track resources. Following a disruption, rescheduling adjusts routes, sequences, and timings.
Figure 2. In-station train operations. (a) Entry waiting; (b) Arrival and dwell; (c) Departure waiting; (d) Departure and release. A Incoming train; B Preceding train; C Originating train. Movement route; Pending route; Occupied shared section; Released section.
Let denote the set of trains, the set of feasible routes for train , and the set of controlled resources. The planned completion time of train in the reference schedule is . Table 1 lists the main notation. All time quantities in the model are expressed in seconds.
| Symbol | Definition |
| , | Set of all trains; set of trains not yet started at update |
| , | Feasible routes for train ; ordered sections of route |
| , | Set of controlled resources and resource index |
| , | Time of update and information history available at that time |
| Remaining closure duration at update | |
| , | Conditional scenario set and nominal probability of scenario |
| Completion time of train in the reference schedule | |
| , | Exogenous arrival delay and additional required processing time |
| , | Binary variables for starting at node on route , and for starting at node |
| , | Start and release times of train on section in scenario |
| Dwell and waiting duration of train in scenario | |
| , | Completion time and completion delay of train in scenario |
| , | Scheduling policy and its total completion delay in scenario |
| , | Scenario probability deviation radius and probability ambiguity set |
Table 1. Main notation
Distributionally robust train rescheduling model
Uncertainty and information structure
The waiting time for the original route remains uncertain during a closure. Rerouting may increase competition for other resources. Dispatchers update remaining closure-duration estimates using actual train states, observed disturbances, and the disruption-resolution stage. Observations of this stage are subject to delivery delays and misclassification. Bayesian updating combines stage-transition and observation models.
Let denote the information available at time and the remaining closure duration. Its conditional distribution is:
The conditional scenario set and nominal probabilities are constructed from . Let be the remaining closure duration in scenario . The reopening time of a currently closed resource is . Train routes, sequences, and timings are jointly optimized under these resource-availability conditions.
Each scenario also contains subsequent stage observations. Scenarios with identical observation histories share an information node . Node corresponds to the interval , and denotes the nodes visited by scenario .
Decisions can depend only on the information available at the time. Let be the first time at which observations distinguish scenarios and . Set if they remain indistinguishable. Let be the train start time, indicate the use of route , and be the departure start time on that route. Nonanticipativity requires:
A scheduling policy satisfying these nonanticipativity constraints is denoted by .
Objective and constraints
Reopening-time predictions specify possible resource-availability times and their nominal probabilities. Errors in probability estimates alter the evaluation of candidate schedules. To account for probability estimation errors, we construct an ambiguity set around the nominal probabilities :
Train completion delay and scenario loss are defined as:
Routes and operation sequences yield different completion delays across reopening scenarios. Each candidate policy is evaluated by its worst-case expected total completion delay over the probability ambiguity set. We select the policy that minimizes this loss:
The feasible policy set is defined by train-operation constraints, resource-use constraints, and the nonanticipativity constraints in Eq. (2).
Route and start-node selection. For each train that has not yet started, the route and start-node variables satisfy:
Operation timing and section continuity. The original earliest ready time of train is . Its disrupted ready time is . Let denote the minimum dwell time on route under normal conditions. The disrupted minimum processing time satisfies:
For the selected route , let be its first section and the successor of section . Parameters and denote the required section time and transition offset, respectively. The indicator identifies the dwell section, and is the fixed running time of the route. Section occupancy and train completion times satisfy:
The departure start time is the start time of the first departure section after the dwell section. Time variables take integer-second values. Section times lie within the planning interval , where is the batch start time and is the planning horizon.
Resource occupancy and closures. Let denote the resource associated with section . The reservation endpoints for a section on the selected route are and . They normally equal and . For platform occupancy, the left endpoint is for originating trains, and the right endpoint is for terminating trains. Resource reservations and mutual exclusion satisfy:
If resource is closed over , entry to the resource is restricted by:
Closure constraints apply to sections entering closed resources along the selected route. Platform occupancy that has already begun for originating trains is retained. Let and denote the resources entered during the continuous arrival and departure movements, respectively. For a closure with , the corresponding movements that have not yet started satisfy:
Consecutive trains at the same entry retain their prescribed order:
Executed operations. Let be the set of trains that have started. Sets and contain completed and ongoing section operations, respectively. The superscript act denotes actual routes, start times, and section times. Confirmed routes remain unchanged. All scenarios retain:
Graph learning-assisted logic-based Benders decomposition
Master problem and joint scheduling subproblem
Logic-based Benders decomposition coordinates routing and resource scheduling. Resource lower bounds and conditional cuts strengthen the master problem, while graph learning guides resource ordering. The algorithm is denoted by GNN-LBBD, and its framework is shown in Figure 3.
Figure 3. GNN-LBBD framework
Let . The earliest completion times , obtained without resource competition, give the initial scenario lower bound:
The set retains necessary conditions on route choice, start-time windows, and entry order. The calculation of retains ready times, minimum processing times, and route closure conditions. Choices with no feasible start-time window are removed from . Let be the corresponding earliest start time. A necessary condition for the prescribed order at the same entry is:
For trains that have started, the corresponding start-time endpoints take their actual values.
Let and be lower-bound variables for scenario loss and the robust objective, respectively. Given a set of probability vectors and a set of Benders cuts , the master problem is:
Initially, . After obtaining a candidate solution, we solve:
If , we add to and resolve the master problem.
Let denote the candidate routes. The joint subproblem fixes the route in each scenario and optimizes start intervals, resource-use sequences, and operation times:
The joint subproblem is solved with CP-SAT and iterative separation of worst-case probabilities.
Let be a valid master lower bound and the worst-case expected loss of the incumbent feasible policy . Then:
Resource lower bounds and conditional cuts
Conditioning on train–resource use extends single-resource scheduling lower bounds to different route combinations.
Let be the candidate route. Deviation from the candidate route combination is measured by:
A valid subproblem lower bound or a proof of route-combination infeasibility yields the following cuts, respectively:
The train-use pattern of resource in the candidate route combination is:
Here, is the resource set of route . In the single-resource relaxation, these trains may choose any feasible route using . All other trains without fixed routes retain their full route sets:
The relaxation retains ready times and required processing times for all trains. Inter-train mutual exclusion is retained only on resource , and each scenario is solved separately. Let denote local route choices and mark other local variables with . The single-resource model is:
Local section times and reservation intervals follow Eqs. (8) and (9). Section constraints apply only to selected routes. Actual train start times and section times already realized on resource are retained as in Eq. (13). Inter-train mutual exclusion on other resources, start-node time windows, and nonanticipativity across scenarios are relaxed.
The resource-use condition is expressed as:
The route-choice constraints imply . If all resource-use relations in the candidate combination hold, ; otherwise, . Let be a valid lower bound obtained from Eq. (24). We add the conditional cuts:
When , any feasible schedule of the full problem satisfies the constraints retained in the single-resource model. Hence:
Nonnegative probabilities allow maximization over to yield a robust lower bound. When , the right-hand sides of the cuts are nonpositive. Their validity then follows from .
Graph learning-assisted resource ordering
The lower-bound gain and solution time of a resource relaxation vary across resources. We construct a train–route–resource graph and learn the lower-bound gain per unit of solution time. Trains connect to their feasible routes, and routes connect to the resources they use.
Let be the node feature matrix. It encodes node types, ready and processing times, route choices, resource loads, and closure conditions. Let be the adjacency matrix with self-loops and its degree matrix. With weights , and biases , , the network computes:
The output for resource node is denoted by .
For training sample , the resource relaxation yields a robust lower bound and solution time . Let be the nominal expected loss obtained from independent earliest train completions, and let be a lower threshold on solution time. The normalized supervision label is:
For training samples with valid resource label sets , the training objective is:
During rescheduling, if and the incumbent feasible policy yields worst-case probabilities , we calculate the resource risk load:
Resources are ordered by decreasing , with graph-predicted scores breaking ties. In other cases, resources are ordered by their graph-predicted scores.
Algorithm 1 GNN-LBBD solution algorithm
Step 1: Input the current information , actual operational state, reference schedule , graph model, and computation budget. Construct conditional scenarios and information nodes. Generate an initial feasible policy using the scheduling heuristic. If the reopening time is known and the initial loss is positive, improve timings and sequences for the current routes. Compute and set .
Step 2: Build the master problem and retain previous cuts that remain valid for the current scenarios and operational state.
Step 3: Solve the master problem and update . Separate worst-case probabilities using Eq. (17). If a probability constraint is violated, add it to the master problem and return to Step 3.
Step 4: Fix the candidate scenario routes and solve the joint scheduling subproblem. Update using a feasible policy. Generate a route-combination cut from a valid lower bound or proven infeasibility.
Step 5: Solve selected single-resource relaxations in resource-priority order within the remaining budget. Store scenario lower bounds and add resource conditional cuts.
Step 6: Repeat Steps 3–5 until the computation budget is exhausted or .
Step 7: Return the incumbent best feasible policy and .
Numerical experiments and results
Experimental design
Test instances and settings
The experiments use the public CP2025 in-station train dispatching benchmark of Schutt et al. The dataset contains 141 instances with 1–50 trains each. All instances use the same station with five platform tracks and 45 controlled sections. The inputs include train types, earliest ready times, feasible routes, section-occupancy sequences, and minimum running and dwell times.
The instances are divided into 85 training, 28 validation, and 28 test instances. Only the training instances are used for label generation and graph model training. The test set contains one instance for each train count from 1 to 22, and one each for 25, 30, 35, 40, 45, and 50 trains. The reference schedule is generated by a first-come, first-served rule. All algorithms start rescheduling from the same pre-disruption operational state.
Tabu search (TS) and variable neighborhood search (VNS) serve as the comparison algorithms. TS constructs neighborhoods through feasible rerouting, resource-order adjustments, and joint changes to small task subsets. It uses tabu memory and an aspiration criterion. VNS combines perturbation, local improvement, and neighborhood changes. Both algorithms use the same initial scheduling heuristic, permitted scheduling actions, and conditional predictions. Candidate solutions are evaluated with Eq. (5).
Table 2 summarizes the experiment groups and comparisons. The representative instances cover fixed routes, alternative routes, and concentrated near-term operations. Each group considers platform-track and throat closures separately. Algorithm comparisons use the same computation budget for rescheduling.
| Experiment | Instances | Comparison | Event seeds |
| Algorithm comparison | All 28 test instances | GNN-LBBD, TS, and VNS | 2001–2005 |
| Disturbance combinations | t005-06, t006-06 t013-06, t019-06 t040-03, t045-03 | 8 presence/absence combinations of closures, arrival delays, and processing-time extensions | 2001–2005 |
| Value of information | t005-06, t006-06 t013-06, t019-06 t040-03, t045-03 | With stage observations: scenario-based and conditional-mean predictions; with closure-status observations only: scenario-based prediction | 2001–2005 |
| Component ablation | t005-06, t019-06 t040-03, t045-03 | LBBD with resource lower bounds and cut strengthening, followed by GNN-assisted resource ordering | 2001–2005 |
| Sensitivity analysis | t005-06, t019-06 t040-03, t045-03 | Closure-duration scale: 0.5, 1, 2; direct-increment scale: 0.5, 1.5 | 2001–2005 |
| Distribution shift | t005-06, t019-06 t040-03, t045-03 | Actual closure-duration scale: 0.5, 1, 2; predicted scale: 1; , 0.2 | 3001–3005 |
Table 2. Experimental groups and comparison settings
Let be the actual completion time of train . Rescheduling outcomes are evaluated by total completion delay , maximum train delay , on-time completion rate , final completion extension , and delayed-train backlog :
The unit of is train-min. Both and are measured in minutes, and is measured in trains. A train is on time if it completes no later than in . The external entry queue contains trains that are ready to enter but have not entered the station. Scheduling waiting time counts only waiting beyond required processing within the observation window.
Table 3 lists the rescheduling and graph neural network training parameters.
| Parameter | Value | Parameter | Value |
| Budget per rescheduling call (s) | 5 | Training scenarios | 510 |
| Periodic check interval (s) | 120 | Supervision labels | 20880 |
| Post-disruption observation window (s) | 7200 | Training epochs | 200 |
| Maximum rescheduling rounds | 160 | Learning rate | 0.001 |
| Prediction and search budget share (%) | 95 | Algorithm seeds | 101, 211 |
| Conditional stratified scenarios | 6 | Probability radius | 0.2 |
| Input feature dimension | 8 | Hidden dimension | 12 |
| Resources checked per round | 2 | Label time threshold (s) | 0.01 |
| Single-resource time limit (s) | 1 | Termination tolerance (s) |
Table 3. Rescheduling and graph neural network training parameters
The experiments were run on Windows 11 with an Intel64 Family 6 Model 183 processor (32 logical processors), CPython 3.12.14, and OR-Tools 9.15.6755. Each run used one thread, with at most four runs in parallel. Inference during rescheduling was included in the computation budget.
Disturbance design
We introduce resource closures , arrival delays , and required processing-time extensions into to examine resource restrictions and changes in train operating conditions jointly. Each event closes one platform track or one throat resource. The designed number of affected trains ranges from 20% to 60% of the eligible trains for arrival delays and processing-time extensions. The corresponding per-train increments range from 0 to 300 s and from 0 to 200 s. Nominal closure-duration scales are 300, 600, and 1200 s for low, medium, and high disturbance intensities, respectively.
A Bayesian network links the three disturbances through a common latent intensity as the parent node. Let and contain the affected train sets and their direct increments, and let be the closure duration. Their joint distribution is:
Here, .
The event time is selected using the number of planned operation starts in the following 600 s. Let and be the planned start time and route of train . The eligible sets for arrival delays and processing-time extensions are:
The closed resource is selected using its planned usage in the 600 s after the event. A platform-track closure covers its three platform sections. Conditional on , the affected sets and are sampled uniformly without replacement from and , respectively. The designed numbers of affected trains and their increments are:
The notation denotes a truncated normal distribution, where and are the mean and standard deviation before truncation. Increments are sampled independently across trains and rounded to seconds. Table 4 lists the intensity parameters.
| Intensity | Probability | Increment factor | Closure-duration scale (s) | Affected proportion |
| Low | 0.25 | 0.5 | 300 | 0.20 |
| Medium | 0.50 | 1.0 | 600 | 0.40 |
| High | 0.25 | 2.0 | 1200 | 0.60 |
Table 4. Disturbance intensity and distribution parameters
Disruption resolution is represented by an absorbing Markov chain. The state comprises three sequential transient states and an absorbing state for resource reopening. The initial state is 1. With a time step of 1 s and intensity , the process satisfies:
The nominal closure-duration scale is given in Table 4. Since takes positive integer values, .
Stage observations identify the disruption-resolution stage at the collection time. Matrix describes their misclassification. Observation is collected at and received at after a delay . Observations are collected every 120 s. The delay follows a discrete uniform distribution over 0–60 s:
Let be the probability of observing stage when the true stage is . The stage misclassification matrix is:
Initial arrival delays and processing-time increments provide evidence about disturbance intensity. Stage observations further update the predicted remaining closure duration. Let be the initial evidence and its likelihood under intensity .
Let be stage observation . The observations available by are . While the resource remains closed, the joint posterior of intensity and current stage is:
Bayesian filtering combines and to update the state distribution at observation collection times and propagate it to the current decision time. The initial evidence likelihood is computed from the number of affected trains and the rounded increments.
Let be the transient submatrix of , , and the identity matrix of order three. The conditional distribution and mean of the remaining closure duration satisfy:
Scenario-based prediction uses stratified sampling over conditional quantile intervals to generate reopening times and subsequent observation sequences. Each scenario has nominal probability . Conditional-mean prediction represents the reopening time using the mean in Eq. (40).
Algorithm comparison and ablation analysis
Rescheduling performance and computation time
We compare GNN-LBBD, TS, and VNS under identical reference schedules, disturbances, and computation budgets to assess their delay-reduction performance. Table 5 and Figure 4–6 summarize scheduling and computational results. Figure 7 compares platform-track occupation under the same closure event.
| Metric | GNN-LBBD | TS | VNS |
| Total completion delay (train-min) | 61.13 | 73.33 | 76.47 |
| Maximum train delay (min) | 10.31 | 10.53 | 10.70 |
| Delayed trains (trains) | 7.30 | 7.79 | 7.86 |
| On-time completion rate (%) | 50.30 | 47.96 | 47.46 |
| Final completion extension (min) | 5.79 | 6.42 | 6.65 |
| Total scheduling waiting time (train-min) | 83.47 | 95.83 | 98.97 |
| Maximum delayed-train backlog (trains) | 4.25 | 4.82 | 4.93 |
| Mean entry delay (min) | 3.63 | 4.21 | 4.31 |
| Total rescheduling computation time (s) | 46.15 | 46.42 | 59.91 |
Table 5. Rescheduling performance of the algorithms
(a)
(b)
Figure 4. Total completion delay by algorithm

Figure 7. Platform-track occupation under different algorithms
GNN-LBBD primarily reduced total completion delay and scheduling waiting time. In Table 5, its mean total completion delay was 61.13 train-min, 16.63% below TS and 20.06% below VNS. Its total scheduling waiting time was 83.47 train-min, compared with 95.83 and 98.97 train-min for the two comparison algorithms. The on-time completion rate increased to 50.30%, from 47.96% for TS and 47.46% for VNS. The final completion extension decreased to 5.79 min, from 6.42 and 6.65 min, respectively.
(a)
(b)
(c)
(d) On-time completion rates and maximum external entry queues
(f)
(g) Total rescheduling computation time by algorithm
GNN-LBBD improved schedule quality with a total computation time close to that of TS. In Table 5, mean total computation times were 46.15 s for GNN-LBBD, 46.42 s for TS, and 59.91 s for VNS. At similar total computation times, GNN-LBBD reduced total completion delay by 16.63% relative to TS. This indicates better schedule quality within a limited computation budget.
(e)
Figure 5.
Track reassignment and coordination between successive trains allowed some operations to finish before reopening. Consider the platform-track closure in t018-06 (Figure 7). GNN-LBBD reassigned T15, T5, and T18 from the closed track IV to tracks III, I, and II, respectively. It also moved T10 from track II to track III. On track I, T8 departed before T5 passed through and T11 entered. On track V, T6 followed T1. Under TS and VNS, T8 and T1 each incurred about 30 min of additional on-track waiting. T11 and T6 entered their tracks only after reopening. GNN-LBBD completed these operations during the closure by coordinating resource release, rerouted train movements, and subsequent arrivals. The benefits extended to T11 and T6, which did not originally use the closed track. This reduced the propagation of closure-induced delays through successive track occupations.
Component ablation experiments
We compare configurations that progressively add resource lower bounds with cut strengthening and graph learning-assisted resource ordering. This isolates their contributions within a limited computation budget. Table 6 summarizes scheduling metrics and paired event comparisons. Figure 8 shows changes in the on-time completion rate and maximum backlog.
| Resource lower bounds and cut strengthening | GNN-assisted resource ordering | Total completion delay (train-min) | Maximum train delay (min) | Maximum backlog (trains) | Lower/unchanged/higher delay vs. previous configuration (events) |
| Disabled | Disabled | 98.88 | 12.47 | 6.58 | — |
| Enabled | Disabled | 85.15 | 12.16 | 6.24 | 19/19/2 |
| Enabled | Enabled | 60.90 | 9.98 | 4.83 | 20/20/0 |
Table 6. LBBD component ablation results
Figure 8. Effects of algorithm components on on-time completion and maximum backlog
Resource lower bounds with cut strengthening reduced total completion delay, and graph learning-assisted ordering provided a further improvement. In Table 6, enabling resource lower bounds and cut strengthening reduced mean total completion delay from 98.88 to 85.15 train-min, or 13.88%. Adding graph learning-assisted ordering further reduced it to 60.90 train-min, 28.48% below the configuration without graph learning. Across 40 paired events, resource lower bounds with cut strengthening reduced delay in 19 events. Adding graph learning-assisted ordering reduced delay in 20 events. Its incremental benefit was therefore supported across multiple events.
Graph learning-assisted ordering also reduced peak backlog and individual train delay. In Table 6, the mean maximum backlog decreased from 6.24 to 4.83 trains, and the mean maximum train delay decreased from 12.16 to 9.98 min. Under platform-track closures, maximum backlogs in the 19- and 40-train instances decreased by 1.90 and 4.80 trains (Fig. 8). Graph learning-assisted ordering further reduced total completion delay after resource lower bounds and cut strengthening had been enabled. The solution order of resource relaxations is thus an effective component for improving schedule quality within a limited computation budget.
Combined disturbances and information updates
Effects of disturbance combinations
We compare eight combinations of three disturbances to examine whether resource closures change the delay effects of arrival delays and processing-time extensions. Table 7 summarizes mean total completion delay. Figure 9 shows delay distributions across instances and closure locations.
| Disturbance combination | Total completion delay (train-min) | Disturbance combination | Total completion delay (train-min) |
| No disturbance | 0.00 | Closure and arrival delays | 57.64 |
| Resource closure | 54.46 | Closure and processing-time extensions | 60.20 |
| Arrival delays | 4.04 | Arrival delays and processing-time extensions | 7.76 |
| Processing-time extensions | 3.83 | All three disturbances | 45.41 |
Table 7. Total completion delay under disturbance combinations

Figure 9. Total completion delay distributions under disturbance combinations
Resource closures changed the relative effects of arrival delays and processing-time extensions on total completion delay. Without closures, arrival delays and processing-time extensions alone produced mean total completion delays of 4.04 and 3.83 train-min, respectively. Their combined loss was 7.76 train-min, close to the sum of the individual losses. Under closures, mean total completion delay increased from 54.46 train-min to 57.64 with arrival delays and 60.20 with processing-time extensions. The two disturbances caused similar losses without closures, but processing-time extensions produced a larger mean additional delay when combined with closures. Their relative effects under closures should therefore not be inferred directly from their individual losses without closures.
Mean total completion delay under all three disturbances was lower than that under closure alone. The combined loss was 45.41 train-min, also below those for closures combined separately with arrival delays or processing-time extensions. Without closures, the joint loss of the two time disturbances was close to the sum of their individual losses. Under closures, adding either disturbance separately increased mean delay, whereas adding both reduced it. The combined losses therefore departed from an approximately additive relationship.
Effects of reopening-time prediction on rescheduling
We compare predictions with and without stage observations, and scenario-based with conditional-mean predictions under identical observations. These comparisons assess how observations and prediction representations affect train holding and track assignments. Table 8 summarizes total completion delay, and Figure 10 shows train backlog and completion progress. Execution records from the same closure event are used to examine scheduling differences.
| Instance | Scenario-based with stage observations | Conditional mean with stage observations | Scenario-based with closure-status observations only |
| t005-06 | 23.56 | 23.56 | 23.56 |
| t006-06 | 14.66 | 14.66 | 14.66 |
| t013-06 | 14.22 | 14.22 | 14.21 |
| t019-06 | 63.93 | 64.04 | 91.66 |
| t040-03 | 65.41 | 66.75 | 102.99 |
| t045-03 | 90.71 | 89.05 | 100.77 |
| Mean | 45.41 | 45.38 | 57.97 |
Table 8. Total completion delay under different prediction schemes
Figure 10. Train backlog and completion progress under different prediction schemes
Rescheduling with stage observations achieved lower total completion delay. In Table 8, scenario-based prediction with stage observations reduced mean total completion delay from 57.97 to 45.41 train-min, or approximately 21.7%. The comparison scheme observed only the closure status. About 10 min after a platform-track closure, its mean backlog approached three trains, compared with approximately 1.5 for both schemes using stage observations (Figure 10). The latter schemes also achieved higher completion rates during the same period.
Prediction differences also changed track assignments during the closure. Consider the throat-closure event in t040-03, with time measured from closure onset. At 2.08 min, an observation indicated that the first resolution stage was not yet complete. The estimated reopening time changed from 20.09 to 21.71 min after closure onset. Later observations continued to revise this estimate. At 8.15 min, the predicted remaining closure duration was 13.23 min. Train 25 was subsequently reassigned from track IV to track V. It entered at 9.15 min and completed its operations at 11.15 min. With closure-status observations only, the train retained track IV and entered at 34.58 min, incurring 25.43 min of additional scheduling waiting. Both solver runs produced these track-assignment and entry-time differences. The resource reopened at 29.25 min. The scheme using stage observations had already completed the train’s operations, whereas the other scheme continued waiting until after reopening.
With identical stage observations, scenario-based and conditional-mean predictions yielded mean total completion delays of 45.41 and 45.38 train-min, respectively. The delay difference associated with using stage observations was larger than the mean difference between the two prediction representations. In terms of mean operational loss in these experiments, continued use of stage observations deserves priority over refining the prediction representation.
Sensitivity and distribution-shift analyses
Sensitivity to disturbance scales
We vary the closure-duration scale and the arrival-delay and processing-time increment scale separately to examine how disturbance scales relate to rescheduling losses. The same parameters are used for actual disturbance generation and prediction. Table 9 summarizes rescheduling metrics, and Figure 11 compares total completion delay distributions at half and baseline scales.
| Setting | Total completion delay (train-min) | Maximum train delay (min) | Maximum backlog (trains) |
| Baseline | 60.90 | 9.98 | 4.83 |
| Closure-duration scale 0.5 | 44.26 | 7.02 | 4.53 |
| Closure-duration scale 2 | 170.60 | 21.43 | 8.21 |
| Arrival-delay and processing-time increments 0.5 | 82.60 | 11.84 | 6.20 |
| Arrival-delay and processing-time increments 1.5 | 83.36 | 12.17 | 6.04 |
Table 9. Rescheduling performance under different disturbance scales
Figure 11. Total completion delay distributions under different disturbance scales
Longer closures were associated with a more than proportional increase in total completion delay. In Table 9, doubling the closure-duration scale increased mean total completion delay from 60.90 to 170.60 train-min, or 2.80 times the baseline. Maximum train delay increased from 9.98 to 21.43 min, and maximum backlog increased from 4.83 to 8.21 trains. Halving the duration scale reduced mean total completion delay to 44.26 train-min, 27.3% below the baseline. Longer closures increased both backlog size and individual train delay. After reopening, operational sequences remain constrained by shared-resource occupancy. Operations postponed during a closure may therefore continue to generate queues. Proportional extrapolation from baseline delay may underestimate the cumulative effects of long closures on subsequent operations.
Smaller direct time increments did not produce a corresponding reduction in total delay. At arrival-delay and processing-time increment scales of 0.5 and 1.5, mean total completion delays were 82.60 and 83.36 train-min, respectively. Both exceeded the baseline of 60.90 train-min. Direct increments change train ready times and required processing times. Rescheduling losses also depend on route choices and coordination between operations. Disturbance magnitude and actual losses therefore did not follow a simple proportional relationship under the given rescheduling strategy. Estimating operating benefits from the reduction in input increments may overstate the corresponding delay improvement.
Closure-duration distribution shifts
We compare the expected-loss and distributionally robust models when actual closure durations deviate from predictions. The predicted duration scale remains at its baseline value, while the actual scale is set to 0.5, 1, or 2. Table 10 summarizes rescheduling metrics. Figure 12 shows total completion delay distributions across closure locations and actual duration scales.
| Actual scale | Model | Total completion delay (train-min) | Maximum train delay (min) | Maximum backlog (trains) |
| 0.5 | Expected-loss | 97.64 | 13.97 | 7.56 |
| Distributionally robust | 100.92 | 13.92 | 7.41 | |
| 1 | Expected-loss | 132.09 | 19.69 | 6.76 |
| Distributionally robust | 127.98 | 19.28 | 6.63 | |
| 2 | Expected-loss | 255.42 | 36.88 | 6.86 |
| Distributionally robust | 284.37 | 36.88 | 7.46 |
Table 10. Model performance under closure-duration distribution shifts
Figure 12. Total completion delay distributions under closure-duration distribution shifts
Distributionally robust evaluation changes the trade-off between mean predicted delay and losses under probability deviations. Consider the throat-closure event in t040-03 at the same decision time and under identical reopening scenarios. Under nominal probabilities, policies from the expected-loss and distributionally robust models yielded predicted total completion delays of 273.29 and 275.19 train-min, respectively. Allowing scenario probabilities to vary within the same range gave worst-case expected losses of 311.79 and 310.43 train-min, respectively. The distributionally robust policy accepted a slightly higher mean predicted delay to reduce potential losses when high-delay scenario probabilities were underestimated. This trade-off concerns schedule evaluation and selection; both models used identical reopening scenarios.
The ranking of the two models by actual delay changed with the closure-duration scale. When actual and predicted scales matched, mean total completion delay was 127.98 train-min for the distributionally robust model (Table 10). This was 3.11% below the 132.09 train-min of the expected-loss model. At an actual scale of 0.5, mean total completion delays were 100.92 and 97.64 train-min, respectively. At a scale of 2, they were 284.37 and 255.42 train-min. The distributionally robust model had 3.36% and 11.34% higher mean delays at these scales. More cautious probability evaluation may therefore not offset systematic errors in closure-duration predictions. If actual durations repeatedly exceed or fall below predictions, field observations can first be used to recalibrate reopening-time scenarios. The delay reduction from protection against probability uncertainty can then be evaluated. Judging policies solely by lower worst-case predicted losses may overstate their benefits under closure-duration prediction errors.
Conclusions
We develop a distributionally robust model for in-station train rescheduling under resource closures, arrival delays, and processing-time extensions. The model updates reopening-time predictions with field observations, and GNN-LBBD coordinates routing and resource scheduling. On the test instances, GNN-LBBD reduced mean total completion delay by 16.63% relative to TS and 20.06% relative to VNS. Its mean total computation time was close to that of TS. Ablation experiments further showed that graph learning-assisted ordering reduced total delay after resource lower bounds and cut strengthening had been enabled. The solution order of resource relaxations is thus an effective component for improving schedule quality within a limited computation budget.
Field observations of the resolution stage change train holding and routing during closures by revising reopening-time estimates. In the information comparisons, using stage observations reduced mean total completion delay by approximately 21.7%. Execution records showed that track reassignments allowed trains to complete their operations on alternative routes before reopening. Earlier release of tracks also enabled subsequent arrivals and reduced on-track waiting for following trains. The benefits therefore extended beyond trains originally assigned to the closed track.
Distributionally robust evaluation balances mean predicted delay against losses under adverse probability distributions. When actual and predicted duration scales matched, it reduced mean total completion delay by 3.11% relative to the expected-loss model. Under systematic duration prediction errors, a more cautious probability evaluation may not yield lower actual delays. Scale experiments also showed that estimating benefits from reductions in disturbance inputs may overstate the corresponding delay improvement. When closure durations are consistently overestimated or underestimated, field observations can first be used to recalibrate reopening-time scenarios. The operational benefits of protection against probability uncertainty can then be evaluated. Future work could jointly calibrate reopening-time scenarios and probability ambiguity sets, then assess scheduling performance across station layouts and operating loads.
Code Availability
The source code and README files used in this study are publicly available at:https://github.com/yuncifor/RESCHEDULING-UNDER-DISRUPTIONS
References
- [1]Richard M. Lusby, Jesper Larsen, Matthias Erhgotт, and David Ryan. Railway track allocation: models and methods. OR Spectrum, 33(4):843–883, 2011. doi: 10.1007/s00291-009-0189-0.
- [2]Valentina Cacchiani, Dennis Huisman, Martin Kidd, Leo Kroon, Paolo Toth, Lucas Veelenturf, and Joris Wagenaar. An overview of recovery models and algorithms for real-time railway rescheduling. Transportation Research Part B: Methodological, 63:15–37, 2014. doi: 10.1016/j.trb.2014.01.009.
- [3]Malachy Carey and Sinead Carville. Scheduling and platforming trains at busy complex stations. Transportation Research Part A: Policy and Practice, 37(3):195–224, 2003. doi: 10.1016/s0965-8564(02)00012-5.
- [4]Paola Pellegrini, Grégory Marlière, and Joaquin Rodriguez. Optimal train routing and scheduling for managing traffic perturbations in complex junctions. Transportation Research Part B: Methodological, 59:58–80, 2014. doi: 10.1016/j.trb.2013.10.013.DOI
- [5]Francesco Corman and Pavle Keckman. Stochastic prediction of train delays in real-time using Bayesian networks. Transportation Research Part C: Emerging Technologies, 95:599–615, 2018. doi: 10.1016/j.trc.2018.08.003.DOI
- [6]Aharon Ben-Tal, Dick den Hertog, Anja De Waegenaere, Bertrand Melenberg, and Gijs Rennen. Robust solutions of optimization problems affected by uncertain probabilities. Management Science, 59(2):341–357, 2013. doi: 10.1287/mnsc.1120.1641.
- [7]Haonan Yang, Xuzе Ye, Haoyang Huo, Yuhua Yang, Shaoquan Ni, and Dingjun Chen. Robust rescheduling of train timetables and maintenance windows considering uncertain disruption duration: a generalized branch-and-Benders-cut approach. Transportation Research Part C: Emerging Technologies, 190:105781, 2026. doi: 10.1016/j.trc.2026.105781.DOI
- [8]Özgün Elçi and John N. Hooker. Stochastic planning and scheduling with logic-based Benders decomposition. INFORMS Journal on Computing, 34(5):2428–2442, 2022. doi: 10.1287/ijoc.2022.1184.
- [9]Johannes Varga, Emil Karlsson, Günther R. Raidl, Elina Rönnberg, Fredrik Lindsten, and Tobias Rodemann. Speeding up logic-based Benders decomposition by strengthening cuts with graph neural networks. In Machine Learning, Optimization, and Data Science, pages 24–38. Springer, 2024. doi: 10.1007/978-3-031-53969-5_3.DOI
- [10]Peter J. Zwaneveld, Leo G. Kroon, H. Edwin Romeijn, Marc Salomon, Stéphane Dauzère-Pérès, Stan P. M. Van Hoesel, and Harrie W. Ambergen. Routing trains through railway stations: Model formulation and algorithms. Transportation Science, 30(3):181–194, 1996. doi: 10.1287/trsc.30.3.181.
- [11]Alain Billionnet. Using integer programming to solve the train-platforming problem. Transportation Science, 37(2):213–222, 2003. doi: 10.1287/trsc.37.2.213.15250.DOI
- [12]Alberto Caprara, Laura Galli, and Paolo Toth. Solution of the train platforming problem. Transportation Science, 45(2):246–257, 2011. doi: 10.1287/trsc.1110.0366.DOI
- [13]G. Caimi, F. Chudak, M. Fuchsberger, M. Laumanns, and R. Zenklusen. A new resource-constrained multicommodity flow model for conflict-free train routing and scheduling. Transportation Science, 45(2):212–227, 2011. doi: 10.1287/trsc.1100.0349.DOI
- [14]Joaquín Rodriguez. A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B: Methodological, 41(2):231–245, 2007. doi: 10.1016/j.trb.2006.02.006.DOI
- [15]Rajnish Kumar, Goutam Sen, Samarjit Kar, and Manoj Kumar Tiwari. Station dispatching problem for a large terminal: A constraint programming approach. Interfaces, 48(6):510–528, 2018. doi: 10.1287/inte.2018.0950.DOI
- [16]Matteo Cardellini, Marco Maratea, Mauro Vallati, Gianluca Boleto, and Luca Oneto. In-station train dispatching: A PDDL+ planning approach. In Proceedings of the International Conference on Automated Planning and Scheduling, volume 31, pages 450–458, 2021. doi: 10.1609/icaps.v31i1.15991.DOI
- [17]Andreas Schutt, Matteo Cardellini, Jip J. Dekker, Daniel Harabor, Marco Maratea, and Mauro Vallati. Constraint-based in-station train dispatching. In 31st International Conference on Principles and Practice of Constraint Programming (CP 2025), volume 340 of Leibniz International Proceedings in Informatics, pages 33:1–33:24. Schloss Dagstuhl – Leibniz-Zentrum fuer Informatik, 2025. doi: 10.4230/LIPIcs.CP.2025.33.DOI
- [18]Shuguang Zhan, Jiemin Xie, S. C. Wong, Yongqiu Zhu, and Francesco Corman. Handling uncertainty in train timetable rescheduling: A review of the literature and future research directions. Transportation Research Part E: Logistics and Transportation Review, 183:103429, 2024. doi: 10.1016/j.tre.2024.103429.DOI
- [19]Yongqiu Zhu and Rob M. P. Goverde. Dynamic and robust timetable rescheduling for uncertain railway disruptions. Journal of Rail Transport Planning & Management, 15:100196, 2020. doi: 10.1016/j.jrtpm.2020.100196.DOI
- [20]Francesco Corman, Andrea D’Ariano, Dario Pacciarelli, and Marco Pranzo. A tabu search algorithm for rerouting trains during rail operations. Transportation Research Part B: Methodological, 44(1):175–192, 2010. doi: 10.1016/j.trb.2009.05.004.DOI
- [21]Marcella Samà, Andrea D’Ariano, Francesco Corman, and Dario Pacciarelli. A variable neighbourhood search for fast train scheduling and routing during disturbed railway traffic situations. Computers & Operations Research, 78:480–499, 2017. doi: 10.1016/j.cor.2016.02.008.DOI
- [22]Paola Pellegrini, Gregory Marliere, Raffaele Pesenti, and Joaquin Rodriguez. RECIFE-MILP: An effective MILP-based heuristic for the real-time railway traffic management problem. IEEE Transactions on Intelligent Transportation Systems, 16(5):2609–2619, 2015. doi: 10.1109/tits.2015.2414294.DOI
- [23]John N. Hooker. Planning and scheduling by logic-based Benders decomposition. Operations Research, 55(3):588–602, 2007. doi: 10.1287/opre.1060.0371.DOI
- [24]Leonardo Lamorgese and Carlo Mannino. An exact decomposition approach for the real-time train dispatching problem. Operations Research, 63(1):48–64, 2015. doi: 10.1287/opre.2014.1327.DOI
- [25]Peiran Han, Lingyun Meng, Xiaojie Luan, Nikola Bešinović, Jianrui Miao, Yihui Wang, and Zhengwen Liao. Integrated optimization of train makeup problem and resource scheduling in railway marshalling yards: A hybrid MILP-CP approach with logic-based Benders decomposition. Transportation Research Part B: Methodological, 200:103306, 2025. doi: 10.1016/j.trb.2025.103306.DOI
- [26]Florin Leutwiler, Guillem Bonet Feliella, and Francesco Corman. Accelerating logic-based Benders decomposition for railway rescheduling by exploiting similarities in delays. Computers & Operations Research, 150:106075, 2023. doi: 10.1016/j.cor.2022.106075.DOI
- [27]Hongxiang Zhang, Andrea D’Ariano, Yongqiu Zhu, Yaoxin Wu, Liuyang Hu, and Gongyuan Lu. Learning to reschedule platforms: A graph neural network based deep reinforcement learning method for the train platforming and rescheduling problem. Transportation Research Part C: Emerging Technologies, 183:105453, 2026. doi: 10.1016/j.trc.2025.105453.













