Unlocking Heterogeneous Accelerator Flexibility in AI Data Centers: Sizing and Workload Allocation

Abstract

AI data centers are an emerging electricity demand, but limited local grid capacity could delay their connection and expansion. While existing operational strategies consider spatio-temporal workload flexibility, few studies address the strategic sizing and allocation of diverse accelerator archetypes with different capital and energy-efficiency trade-offs. This paper unlocks the flexibility potential of heterogeneous accelerators by jointly sizing and allocating different AI workloads (training, delay-tolerant batch work, and online inference requests) across sites and hours to meet the time-varying grid constraint at minimum cost. Workload-specific throughput and energy coefficients link these decisions to facility power. In a representative two-site case, heterogeneous sizing reduces daily cost by 6.5% relative to spatio-temporal scheduling with fixed capacity. When evaluated using workload-specific performance, a capacity design based on workload-averaged hardware coefficients costs 7.7% more than the proposed design. The proposed design also eliminates the envelope violations of an unconstrained design at a 0.25% daily cost increase. These results show how hardware heterogeneity and workload flexibility jointly shape economical, grid-compliant capacity plans.

Paper details

vlnc:W_9gg63z7h
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
arXiv nonexclusive license
Usage

views · 9

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…