A Hybrid Systems Approach to Parameterizing the PERC1 Model for Data Centers Using Synchrophasor Measurements
Abstract
The Power Electronic Reconnecting and Ceasing (PERC1) load model represents the timed ceasing and reconnection of large power-electronic loads, including data centers. Voltage thresholds and timers govern its response, with a ramp on reconnection, making it a hybrid dynamical system. This paper formulates PERC1 as a hybrid automaton and uses that structure to identify its parameters from synchrophasor records of grid disturbances. We propose a four-stage identification procedure: mode-sequence identification, estimation of logic parameters from event-time constraints, and joint Gauss-Newton refinement using hybrid trajectory sensitivities and saltation matrices. The resulting salted Fisher information is then used to analyze parameter identifiability. Two structural results are established. The detection and actuation delays are identifiable only through their sum unless a second dip interrupts the reconnection ramp, and a single disturbance leaves one unidentifiable direction in each threshold-delay pair, which two disturbances with different voltage slopes resolve. A case study using synthetic 60 frames/s synchrophasor records demonstrates recovery of the ceasing and reconnection dynamics and identifies poorly observable parameters.
Introduction
Data centers used 4.4% of United States electricity in 2023, and projections for 2028 range from 6.7% to 12% [1]. On July 10, 2024, a permanent 230 kV fault and three reclosing attempts sent about 1,500 MW of data center load to on-site backup supply. Most of it did not return for hours [2]. On July 22, 2026, a single 230 kV line fault in the Dominion zone of PJM removed about 3,800 MW in two waves one minute apart [3]. In both events, the customers’ own protection and controls initiated the disconnection. NERC’s incident review therefore recommends that interconnection requirements include dynamic response models of large loads [2].
The Power Electronic Reconnecting and Ceasing (PERC1) model was introduced in late 2025 to address this modeling gap [4], [5], and NERC recommends its use for representing the ceasing and reconnection of any type of data center [6]. Derived from the EPRI aggregated electric-vehicle charger model [7], it includes voltage-dependent load characteristics, current limits, washout and lead–lag blocks, and logic governing load ceasing and reconnection. The model reduces the connected load fraction when voltage remains below a specified threshold for a prescribed duration and ramps up following voltage recovery.
The PERC1 parameters are generally unknown to system planners. Although uninterruptible power supply (UPS) vendors provide parameter ranges [6], these may not represent the response of individual facilities. To the best of our knowledge, no method has been proposed for jointly estimating PERC1’s continuous and logic parameters from synchrophasor records while also analyzing their identifiability. Phasor measurement units (PMUs) at the point of interconnection provide disturbance records that could support such estimation. The challenge is to estimate the model parameters from these records and determine which parameters can be uniquely identified.
Measurement-based approaches have been widely studied for load model parameter estimation [8], [9], including PMU-based estimation [10]. Gradient-based methods rely on smooth dependence of model outputs on the parameters. In PERC1, however, changes in the logic parameters alter when the load ceases and reconnection begins. Consequently, a least-squares objective evaluated using fixed-step simulations can be piecewise constant with respect to these parameters, limiting the effectiveness of gradient-based optimization. For the WECC composite load model, which also includes load tripping and reconnection, derivative-free optimization has been used with replayed or closed-loop simulations [11]. However, such approaches do not establish which parameters can be identified from the available measurements, as illustrated by the difficulties in estimating trip thresholds reported in [11].
Hybrid dynamical systems offer a natural framework for addressing this problem [12]. Hiskens and Pai Hiskens and Pai [13] showed that the trajectory sensitivities of such systems jump at every transition and used them to fit models to disturbance recordings [8]. The saltation matrix describes the jump [14], and the salted Fisher information framework of [15] uses hybrid trajectory sensitivities to analyze parameter identifiability and establishes a hybrid persistence-of-excitation condition for local identifiability.
This paper develops a hybrid dynamical systems approach for estimating PERC1 parameters from synchrophasor measurements. We formulate PERC1 as a hybrid automaton and propose a four-stage identification procedure based on event-time constraints and hybrid trajectory sensitivities. Using salted Fisher information [15], we establish conditions for parameter identifiability and show how multiple disturbances can resolve ambiguities between voltage thresholds and timing parameters.
This paper proceeds as follows. Section II writes PERC1 as a hybrid automaton, and Section III builds the identification on it. Section IV tests the procedure on synthetic PMU records of a data center.
PERC1 as a Hybrid Automaton
In what follows, parameter and variable notation follows the vendor documentation [4]. Quantities are in per unit on the model base , where and are the pre-disturbance active and reactive power and is a loading factor [4]. The inputs are the terminal voltage magnitude and the frequency deviation . The block diagram in [4] has eight states: the filtered voltage and frequency , the washout outputs and , the lead–lag outputs and , and the currents and . We represent the washout and lead–lag blocks with the states , , , . Each washout is written in the partial-fraction form , so the measured voltage is never differentiated, and each lead–lag as a feedthrough plus a low-pass state, . The corresponding continuous dynamics are
with outputs
and lead–lag inputs and , where is the deadband and the gate in (1) is 1 while pu and 0 otherwise. A voltage step thus produces a request pulse in (4). The requests are converted to currents with the filtered voltage, limited, scaled by the connected fraction , and delayed:
where and are and on the base [4].
Ceasing and reconnection logic
The PERC1 logic is represented as a finite-state machine with modes Monitor, Cease, and Ramp [4]. In Monitor or Ramp, if stays below for seconds, a delay timer starts, and a recovery of does not cancel it; after seconds, drops to and the mode becomes Cease. In Cease mode, once has stayed above for seconds, the time is recorded and ramps linearly over seconds to . The mode then returns to Monitor. Subsequent ceasing events drop to the same , so the share leaves at the first cease and stays off, while cycles with every event. A
dip during the ramp goes through the same detector: keeps ramping during the dwell and freezes while the delay timer runs, then drops to .
We encode this as two timed automata [16] that share the event cease (Figure 1). The cease detector has clock and arms only while is in Monitor or Ramp. The mode automaton has clock and operates over Monitor, Cease, and Ramp. The transition from timing to armed resets . Entry to Cease and every crossing of reset , so with indicates that the voltage has remained above the threshold for the required duration.

Figure 1. Timed automata of the PERC1 logic. The arrows represent edges , their transition conditions define guards , and the arrowheads at update states define resets . reads from the plant (1)–(9) and emits cease, which resets on both edges into Cease; the edge RampMonitor resets . In Ramp, while is not in delay, and is constant otherwise. Clocks are reset to zero on entry to timing, delay, Cease, and Ramp, and is also reset by the self-loop of Cease.
The hybrid automaton
Let and . The PERC1 model is the hybrid automaton in the sense of [12]. In mode , the state flows according to , given by (1)–(9) with
The edges , guards , and resets are shown in Figure 1. The parameter vector is divided into . The continuous parameters include gains, time constants, exponents, and current limits that govern the system dynamics. The logic parameters (, , , , , , , ) appear only in the guards, resets, and ramp rate. Thus, the output depends on through the transition times and the values of .
For a data center, represents the load that rides through the disturbance (cooling, auxiliaries, and servers on static UPS units), is the share transferred to backup supply, is the share that automatically returns to grid supply, and is the share that requires manual reconnection [2].
Identification from Synchrophasor Data
Problem statement
A PMU at the point of interconnection reports the positive-sequence voltage magnitude, frequency, active and reactive power at times , with frames/s [17]: the inputs , and the outputs of the model. We drive the model with the measured inputs, interpolated between frames, so the grid beyond the point of interconnection need not be modeled, as in the play-in approach of [5], [8]. A phasor estimate is a windowed average of the underlying signal. We therefore apply the same window to the model outputs before comparing them with the records , and we discard samples within one window of a voltage step. The estimate minimizes, over all available records,
where , weights by the inverse noise variances, and the second term is a weak prior centered at the initialization of Stages 1–2 below. It moves the estimate only along directions the data do not inform.
Hybrid trajectory sensitivities
Between transitions the sensitivity satisfies the variational equation . At a transition at time defined by with reset , the event time depends on the parameters through [15 Prop. 3.4]
and the sensitivity jumps as [13], [15 Prop. 3.2]
where are the vector fields before and after the transition and is the saltation matrix [14]. The last term of (12) is the explicit dependence of the guard on the parameters, carried by in (11). For PERC1, it and are the only ways enters the output sensitivity. For a clock guard , . For a voltage guard , where , . Thus, the slope of the filtered voltage at the threshold crossing determines how threshold changes affect the transition time. At a cease from Monitor, the only nonzero rows of are those of and , with values and respectively. Consequently, each timing parameter produces a pulse in of area that decays with (Figure 2(a)). We integrate along with the state and apply (12) at each crossing, which we locate by interpolation within the step.

Figure 2. (a) Normalized sensitivities in event A to , , and , from (12). The timing parameters act through a pulse that decays with ; the fraction acts through a level change. (b) Level sets of the cease time in the plane for the two events.
Four-stage procedure
Stage 1: Mode sequence. Following [18], we first identify the mode sequence. For a single sag, the mode sequence is MonitorCeaseRampMonitor. The connected fraction FracOn follows the template : 1 before , until , linear until , and afterwards. The template is fitted to the ratio of the measured active power to the active power predicted by the model with FracOn (Algorithm 1, lines 1–3). The levels give and , while the times give , with corresponding to the vendor’s .
| Algorithm 1 Four-stage identification of PERC1 |
| Require: Records of , , ; vendor , initial , prior |
| 1: Stage 1, each record : |
| 2: Fit to on the frame grid by least squares, linear in , to obtain |
| 3: , , (means over ) |
| 4: Stage 2: , (after ) of filtered with |
| 5: over with nonnegative delays (vendor default if ); mean of ; |
| 6: estimate from ; |
| Stage 3 () |
| 7: repeat |
| 8: for each , integrate , , applying (11)–(12) at each guard crossing (located by interpolation) |
| 9: , ; , |
| 10: solve ; if in (10): , ; else and re-solve |
| 11: until the relative decrease of is below or no step is accepted |
| 12: Stage 4: at ; rank and null directions from the singular value decomposition of ; if , |
Table 1.
Stage 2: guard parameters from event-time constraints. Let be the first time the filtered voltage of a record drops below and the first time after the cease that it rises above . A cease observed at and a ramp start observed at impose
together with the dwell conditions that stays below on and above on . Each record contributes one equation per observed transition and an inequality for each dip below a candidate without a cease. With two or more records, we select the threshold for which the delays implied by (13) are consistent across the records.
Stage 3: joint refinement. Starting from the estimates obtained in Stages 1–2, we use a Levenberg–Marquardt iteration to minimize (10) over , with the Jacobian computed using (12) (Algorithm 1, lines 7–11).
Stage 4: identifiability. The Gauss–Newton matrix is the salted Fisher information of [15] for sampled outputs. Its rank and small singular values indicate which parameters can be identified from the records. When is positive definite, the square root of the Cramér–Rao bound, , provides a lower bound on the standard deviation of unbiased estimates of .
Two structural results
Proposition 1. For a record in which every cease is detected while is in Monitor, the output of depends on only through . A cease detected while is in Ramp separates the two.
Proof. In Monitor, FracOn whatever the mode of , so the detector affects the plant only through the event cease, emitted at . The delay mode has no exit guard on , so two parameter vectors with equal sum generate identical executions. In Ramp, while is timing and 0 while it is in delay, so the level at which FracOn freezes, , depends on alone.
For initialization, we set and assign the total delay to ; a second dip during ramp permits separate identification.
Proposition 2. For a record with a single cease at and a single ramp start at , the Fisher information restricted to has rank one with null direction , and restricted to has rank one with null direction . Records of two disturbances whose filtered voltages cross the thresholds with different slopes make both blocks full rank.
Proof. By (13), the output depends on only through (the re-arm edges are unobservable without a second cease), so by (11) the Jacobian columns satisfy whenever ; likewise for through . Two records give two null directions that are independent when the slopes differ, so their intersection is trivial.
In the language of [15], one record fails hybrid persistence of excitation along these directions, and a second record with a different crossing slope restores it.
Case Study
We consider a data center represented by PERC1 with the true parameters listed in Table I. Following a sustained voltage sag below 0.70 pu for 50 ms, 60% of the load transfers to backup. Of the disconnected load, 75% reconnects after the filtered voltage remains above 0.88 pu for 0.5 s, with a 2 s ramp. The active power is nearly constant-power (), with a current limit . The frequency path is disabled ().
Two disturbances are considered. Event A represents a nearby fault, with voltage dropping to 0.45 pu for nine cycles, recovering to 0.85 pu at clearing, and returning to 1 pu with a 0.3 s time constant. Event B represents a remote disturbance, with voltage falling to 0.60 pu in 150 ms, holding for 60 ms, rising to 0.90 pu in 250 ms, and returning to 1 pu with a 0.5 s time constant. The model is simulated with a 1 ms step. Voltage and power are averaged over two cycles and sampled at 60 frames/s, with noise standard deviations of 0.002 and 0.003 pu, respectively.
Stage 1 identifies the cease times within approximately one PMU frame and estimates , , and s. Stage 2 estimates the threshold–delay pairs from the observed transition times. As shown in Figure 2(b), the intersection of the two level sets gives , compared with the true values . The reconnection parameters are estimated as .
Stage 3 reduces the cost (10) from 4369 at initialization to 736 after three iterations and 725 after forty, compared with 751 at the true parameters and a noise floor of 710. The identified model (Figure 3) reproduces the cease times within 0.4 ms and the ramp start and end within 3 ms, below one PMU frame. Table I reports the parameter estimates and Crámer–Rao standard deviations from the two-event Fisher information evaluated at the true parameters.

Figure 3. Synthetic PMU records of (a) a nearby fault, (b) a remote slow sag, and (c) the cessation of event A. Top: voltage and active power, measured and modeled at the Stage 1–2 initialization and after Stage 3; crosses mark masked samples within one phasor window of a voltage step. Bottom: FracOn, initial, true, and identified; dotted lines mark the true transitions.
The logic parameters are recovered within two standard deviations, except , whose 64 ms error is seven times its bound. Over 20 noise realizations, the root-mean-square errors are 0.006 pu and 4 ms for , 0.042 pu and 70 ms for , 8 ms for , and 0.003 and 0.001 for and . The spread of exceeds the bound because input noise shifts the voltage threshold crossings, whereas the bound assumes exact voltage measurements. For , , , and , the spread is within 10% of the bound, consistent with [15].
The current limit and voltage exponents are recovered, while , , and remain poorly identifiable. During deep voltage sags, current limiting masks their effects, while phasor-window averaging smooths the short-duration responses needed to identify these time constants.
The single-event results in Table I confirm Proposition 2. For Event A alone, the Fisher information has rank 15 of
| Parameter | True | Stages 1–2 | Stage 3, A+B | CRB | Stage 3, A only |
| 0.020 | 0.010 | 0.017 | 0.015 | 0.027 | |
| 0.100 | 0.100 | 0.115 | 0.44 | 0.107 | |
| 0.010 | 0.005 | 0.011 | 0.0018 | 0.012 | |
| 0.100 | 0.100 | 0.122 | 0.025 | 0.127 | |
| 0.050 | 0.050 | 0.000 | 0.26 | 0.000 | |
| 0.200 | 0.100 | 0.115 | 0.44 | 0.107 | |
| 0.100 | 0.000 | 0.096 | 0.029 | 0.146 | |
| 1.000 | 1.000 | 0.991 | 0.035 | 1.067 | |
| 1.000 | 1.000 | 1.002 | 0.0030 | 1.002 | |
| 0.020 | 0.020 | 0.021 | 0.0076 | 0.023 | |
| 0.700 | 0.690 | 0.694 | 0.0083 | 0.520 | |
| 0.050 | 0.064 | 0.047 | 0.0045 | 0.017 | |
| 0.880 | 0.918 | 0.905 | 0.013 | 0.599 | |
| 0.500 | 0.431 | 0.436 | 0.0088 | 0.578 | |
| 2.000 | 1.975 | 2.002 | 0.0069 | 2.007 | |
| 0.600 | 0.595 | 0.601 | 0.0014 | 0.603 | |
| 0.750 | 0.748 | 0.750 | 0.00069 | 0.751 |
Table 1 (PDF p. 4). Identification results (per unit, seconds)
17, with null directions and , consistent with the crossing slopes of and pu/s, respectively. Starting from the vendor default thresholds of and pu, the single-event estimates converge to and . These estimates fit Event A as well as the true model but may predict incorrect transition times under other disturbances. Combining both events resolves the ambiguity, increasing the Jacobian’s smallest singular value from to .
Proposition 1 is also verified by setting ms. For Event A, the Jacobian columns corresponding to and are identical, so the delays cannot be identified separately. Introducing a second voltage dip to pu during the ramp makes the corresponding Jacobian block full rank, with singular values of 1662 and 27. The bound on is 31 ms, approximately two PMU frames. The 60 frames/s reporting rate limits the information available for estimating short detection delays, so the millisecond-scale detection delays reported by several vendors call for a PMU or fault recorder streaming at a higher rate.
Conclusion
PERC1 is a hybrid system. Treating it as one turns its parameterization from curve fitting with a nonsmooth cost into a structured problem involving mode sequence identification, estimation of logic parameters from transition times, joint parameter estimation using hybrid trajectory sensitivities, and analysis of which parameters can be uniquely identified from the measurements using the Fisher information matrix. The hybrid formulation also makes explicit two facts that the block diagram hides. The detection and actuation delays cannot be identified separately unless a dip interrupts the reconnection ramp, while a single disturbance cannot uniquely identify the threshold-delay pairs. Two synchrophasor records of different voltage profiles recover the logic parameters of a data center load within the PMU frame resolution. The washout and lead–lag time constants remain poorly identifiable because their effects are largely masked by current limiting during deep voltage sags.
References
- [1]A. Shehabi et al., “2024 United States data center energy usage report,” Lawrence Berkeley Nat. Lab., Tech. Rep. LBNL-2001637, Dec. 2024.
- [2]NERC, “Incident review: Considering simultaneous voltage-sensitive load reductions,” NERC, Atlanta, GA, USA, Tech. Rep., Jan. 2025.
- [3]M. Wharton, “Dominium load transfer event,” Presented at the PJM Operating Committee, Audubon, PA, USA, Aug. 6, 2026.
- [4]PowerWorld Corporation, “Load characteristic model: PERC1, Simulator 24 documentation,” Chappaquoin, IL, USA, 2026. [Online]. Available: https://www.powerworld.com/WebHelp/Content/TransientModels_HTML/Load%20Characteristic%20PERC1.htm
- [5]J. Weber, “Power electronic reconnecting and load model,” Presented at the NERC Load Modeling Task Force webinar, Nov. 18, 2025. [Online]. Available: https://www.powerworld.com/files/Power-Electronic-Reconnecting-and-Ceasing-PERC1-Load-Model.pdf
- [6]NERC, “Data center load modeling technical reference,” NERC, Atlanta, GA, USA, Tech. Rep., Jul. 30, 2026.
- [7]L. Sundares h and P. Mitra, “A positive sequence model for aggregated representation of electric vehicle chargers: EPCL model description,” EPRI, Palo Alto, CA, USA, Tech. Rep. Project 1-116982, Nov. 2022.
- [8]I. A. Hiskens, “Nonlinear dynamic model evaluation from disturbance measurements,” IEEE Trans. Power Syst., vol. 16, no. 4, pp. 702–710, Nov. 2001.
- [9]B.-K. Choi et al., “Measurement-based dynamic load models: Derivation, comparison, and validation,” IEEE Trans. Power Syst., vol. 21, no. 3, pp. 1276–1283, Aug. 2006.DOI
- [10]A. Rouhani and A. Abur, “Real-time dynamic parameter estimation for an exponential dynamic load model,” IEEE Trans. Smart Grid, vol. 7, no. 3, pp. 1530–1536, May 2016.DOI
- [11]J. H. Woo, V. D. Paduani, Z. Yang, Y. Ma, Q. Xiao, and N. Lu, “Reinsertion-aware parameter estimation of the WECC composite load model via closed-loop equivalent-network co-estimation,” preprint, arXiv:2610.34497, 2026.arxiv.org/abs/2610.34497
- [12]J. Lygeros, K. H. Johansson, S. N. Simić, J. Zhang, and S. S. Sastry, “Dynamical properties of hybrid automata,” IEEE Trans. Autom. Control, vol. 48, no. 1, pp. 2–17, Jan. 2003.DOI
- [13]I. A. Hiskens and M. A. Pai, “Trajectory sensitivity analysis of hybrid systems,” IEEE Trans. Circuits Syst. I, Fundam. Theory Appl., vol. 47, no. 2, pp. 204–220, Feb. 2000.DOI
- [14]N. J. Kong, J. J. Payne, J. Zhu, and A. M. Johnson, “Saltation matrices: The essential tool for linearizing hybrid dynamical systems,” Proc. IEEE, vol. 112, no. 6, pp. 585–608, Jun. 2024.DOI
- [15]B. G. Odunlami, M. Netto, and H. Lin, “Salted Fisher information for hybrid systems,” preprint, arXiv:2603.29862, 2026.arxiv.org/abs/2603.29862
- [16]R. Alur and D. L. Dill, “A theory of timed automata,” Theor. Comput. Sci., vol. 126, no. 2, pp. 183–235, 1994.
- [17]IEC/IEEE, “Measuring relays and protection equipment—Part 118-1: Synchrophasor for power systems—Measurements,” IEC/IEEE 60255-118-1:2018, 2018.DOI
- [18]S. Paoletti, A. L. Juloski, G. Ferrari-Trecate, and R. Vidal, “Identification of hybrid systems: A tutorial,” Eur. J. Control, vol. 13, no. 2–3, pp. 242–260, 2007.DOI