Multi-Party Authorization of Maintenance Prescriptions on a Permissioned Blockchain

Abstract

In industrial prescriptive maintenance, an equipment supplier's model may recommend an intervention that a plant schedules, a contractor executes, and a quality or safety function approves. A shared ledger records who submitted the prescription, yet cannot check whether the agreed model and decision rule produced it. We require permissioned-blockchain endorsers to verify a succinct proof of that calculation before releasing a work order. On a four-organization Hyperledger Fabric testbed using a public engine benchmark, this stopped all nine contested or mis-operated prescriptions, whereas hash checks accepted four that either raised simulated maintenance cost or reintroduced late failures.

Introduction

Prescriptive maintenance (PsM) turns a condition estimate into a concrete intervention within resource, risk, and timing constraints [12, 16]. On industrial assets maintained under service contracts, that decision crosses company boundaries: an equipment supplier runs its prognostic model to propose an action, the plant operator owns the machine and sensor data and decides whether to stop production and open a work order, a maintenance contractor carries out the job, and a quality or safety function signs off on the decision rules and compliance records. Digital twins can give these partners a shared view of asset state [7] (Chen 2025), yet system integration, data quality, and inter-organizational trust continue to limit industrial adoption of artificial intelligence (AI)-based maintenance [5].

Problems arise when a supplier’s recommendation is turned into a binding work order. A submitted prescription may rest on an outdated condition snapshot, an unapproved model update, a relaxed risk limit, or a manual edit made after computation. Once released, any of those errors commits the plant to downtime, spare parts, contractor hours, or unmitigated failure risk. Even so, the receiving organizations rarely have the means to rerun the calculation, since the supplier’s model weights and the plant’s operating data are confidential.

Permissioned blockchains such as Hyperledger Fabric address part of this coordination problem through identified membership, endorsement policies, and an ordered ledger [2], and prior studies have used them to share rolling-stock maintenance records [1], coordinate multi-factory maintenance [17], and synchronize distributed manufacturing state (Zhang et al., 2024). Yet standard endorsement and hash commitments only bind who submitted a record and which asset snapshot, model, or policy identifier was referenced. Whenever an action is edited in a planning tool, a costlier overhaul is substituted for convenience, or a risk threshold is relaxed while keeping those references intact, a hash-based audit trail still accepts the proposal and exposes the plant to unnecessary shutdowns or missed interventions.

To close this gap, we propose VeriPsM, a multi-party authorization workflow in which endorsing organizations verify a succinct cryptographic proof that the registered model and decision rule produced the submitted prescription, alongside identity, asset-state, and freshness checks, before a work order is released. Two questions guide the study: RQ1: Can multi-party endorsement block altered or unapproved prescriptions before work-order release without exposing the supplier’s model or the plant’s data? RQ2: How does verifying the prescription calculation affect maintenance cost, late-event risk, and transaction latency compared with record-only checks?

We implement and test the workflow on the public PHM North America 2025 aircraft-engine dataset [14], which supplies multi-sensor histories and three maintenance event horizons for reproducible evaluation; the same contractual structure applies wherever an external supplier prescribes interventions on plant equipment under agreed cost and risk rules. The contributions are (i) a role-based authorization workflow and deployment boundary for operator, supplier, contractor, and quality/safety organizations; (ii) a four-organization Fabric implementation with on-chain kernel parameter checks; and (iii) an experimental comparison of proof-based, recomputation, hash-based, and endorsement-only modes across nine prescription alterations and their simulated maintenance consequences.

Related Work

From prognosis to prescription. Prognostics and health management (PHM) can estimate degradation and time to maintenance, but reviews report a persistent gap between model evaluation and maintenance deployment [13, 15]. Prescriptive studies make the decision explicit: Matyas et al. [12] combine production data and simulation to plan maintenance in manufacturing, van Staden et al. [16] learn a predict-then-optimize policy from intervention data, and Mao et al. [11] add production-planning and resource constraints in a digital twin. These studies define how an intervention is selected when one organization holds both the model and the maintenance schedule, leaving open how external partners can verify that a proposed action came from the agreed calculation.

Blockchain for maintenance collaboration. Permissioned ledgers provide membership, endorsement, and shared state [2]. Abbas et al. [1] use a ledger so that railway stakeholders can trust how rolling stock was maintained, Wang et al. [17] coordinate multi-factory production and collaborative maintenance over a blockchain, and Zhang et al. (2024) couple a digital twin with a blockchain for synchronized control among distributed manufacturing parties. These approaches improve confidence in shared records or state updates, while taking the correctness of any off-chain decision logic on trust.

Verifiable computation in industrial settings. Verifiable computation lets a party check work delegated to an untrusted one [8]; succinct proofs [9] have been applied to neural predictions [10] and, with smart contracts, to model procurement for industrial cyber-physical systems [3]. Maintenance authorization needs more: the evidence must name the asset, its current state, and the approved policy, and must show that the selected action beats every declared alternative.

Multi-Party Authorization Workflow

Roles and workflow

Figure 1 shows the four organizations, which share one Fabric channel and appear in the testbed as Operator, original equipment manufacturer (OEM), maintenance, repair, and overhaul (MRO), and Auditor. The plant operator (asset owner) commits the current asset state. The equipment supplier (OEM) registers its frozen prognostic model and the decision policy and submits prescriptions. The quality/safety function (auditor) approves the policy, its risk limit and optimality tolerance, and the verification key before any prescription can be accepted. The maintenance contractor (MRO) receives authorized work orders and records execution receipts. Each step is a separate ledger transaction, so responsibility for every hand-over is attributable.

Multi-party authorization workflow

Figure 1. Multi-party authorization of a maintenance prescription. The supplier runs the model privately, and endorsing peers verify the proof and public bindings without accessing model weights or sensor data.

A submitted prescription is accepted only if its public fields match the active registration and current asset state, its nonce is unused, and its proof verifies on every endorsing peer. Cryptographic verification thus operates alongside channel identity, kernel approval, and contract-execution receipts.

Prescription statement and decision rule

Each prescription carries a public statement

S=(a,e,cs,m,p,u,τ,r,ε,n,q),(1)S = (a,e,c_s,m,p,u,\tau,r,\varepsilon,n,q), \tag*{(1)}

naming the asset, state epoch, state commitment, model, policy, action, action time, risk limit, tolerance, nonce, and proof type. The private part holds 29 integer model inputs, resource capacity, a commitment salt, and the selected candidate. The proof shows that the registered model, applied to the committed inputs, yields median event horizons (q50) for three targets (water wash, compressor shop visit, turbine shop visit), and that the selected action is cost-optimal among the declared candidates.

The registered policy declares four candidates representing generic industrial interventions: defer by 500 cycles (routine deferral), water wash now (online servicing), compressor shop visit now (subsystem overhaul), or turbine shop visit now (major overhaul). For each target, acting no later than q50 carries 50,000 parts per million (ppm) risk and acting later 900,000 ppm; candidate risk is the maximum over targets, weighted by 25 cost units per 1,000 ppm. A candidate is admissible if its resource demand fits plant capacity and its risk does not exceed the auditor-approved limit rr (550,000 ppm). Each integer objective JkJ_k combines direct and downtime cost with early-maintenance and risk terms, and an admissible selected candidate k∗k^* must satisfy

Jk∗≤Jk+εfor every admissible k(2)J_{k^*} \le J_k + \varepsilon\quad\text{for every admissible } k \tag*{(2)}

(with ε=0\varepsilon= 0). Predicted horizons outside [0,32767][0,32767] cycles fail range verification without clamping.

One decision cycle

After a production shift, the plant operator commits the latest condition snapshot of a machine, advancing its state epoch. The supplier’s model, running in the supplier’s or the plant’s environment, estimates the remaining horizons and the planner compares the four candidates; the supplier then submits the selected action with its proof. Endorsing peers from the four organizations check that the statement names the current epoch and the approved model, policy, and risk parameters, and that the proof verifies. When those checks pass, the ledger records an authorized work order for the contractor, who writes back an execution receipt upon completion; the next state commitment opens the following epoch. Deferrals pass through the same endorsement path as interventions, leaving an auditable record when production continues without a stop.

Deployment boundary

Governance and membership are fixed before routine operation. The action set, cost weights, risk limit, capacity bounds, and frozen model manifest are registered on-chain and approved by the quality/safety organization; changing model weights or cost parameters requires registering and approving a new kernel identifier and verification key. Each organization operates its own peer and certificate authority, and endorsement requires the verifying peers to concur.

Raw sensor histories, model weights, and private feature vectors remain at the plant or supplier, while the ledger stores only commitments, identifiers, the selected action, and the 164-byte proof. When a proposal fails a binding or proof check, endorsement aborts before ordering, leaving the asset record unchanged and returning the rejection reason to the submitter; urgent safety stops continue to use the plant’s normal manual work-order procedure.

In a plant deployment, an authorized-prescription event on the ledger would trigger work-order creation in the computerized maintenance management system (CMMS), with the execution receipt written back at order closure; our testbed implements only the ledger side of that interface. Correctness still depends on trustworthy sensor measurements, an appropriate registered model and policy, and sound key and proof-setup management, and public asset tags or action codes on the channel can reveal maintenance cadence to channel members.

Benchmark Case and Implementation

Data and prognostic model. The public PHM North America 2025 engine data [14] contain 59,702 labelled records from four engines; testing and validation files for eight further engines lack local outcome labels and are excluded from fitting and accuracy reporting. The model uses 14 shared sensor fields with leave-one-engine-out folds. A current-sensor LightGBM teacher predicts the three maintenance horizons, and a one-hidden-layer integer student reproduces the decision-relevant forecasts with frozen weights, scales, and ranges. Because only four engines carry ground-truth labels, the prognostic fit serves solely to supply realistic inputs for testing the authorization workflow.

Proof and network. The proof uses gnark v0.12.0 [6] with Groth16 [9]; it evaluates the student, converts its outputs exactly to q50 values, and recomputes all four candidate objectives. Setup keys are local test material, and endorsing chaincode containers cache the approved verification key by digest. The Hyperledger Fabric 2.5.16 testbed has four peer organizations, one peer each, three Raft orderers, and one channel. Four authorization modes share the same chaincode interface: proof-based (proof plus governance checks), recompute (endorsers rerun the model and rule on disclosed inputs), hash-only (commitment hashes and freshness), and endorsement-only (signatures only). Each mode receives one valid prescription and nine altered ones, and the asset record is queried after every rejection.

Maintenance consequences. A semi-synthetic simulator compares deferral, a median-threshold heuristic, and the proved rule under common random numbers, crossing intervention cost, reset effectiveness, and risk cost at three levels (27 settings, 100 paired seeds, 20 decisions per seed). It reports cost in normalized units and late maintenance events, and projects accepted alterations under three tampering regimes: action inflation (10% of deferrals replaced by major overhauls), intervention suppression (80% of prescribed interventions deferred), and bidirectional flips (10%).

Results

Rejection of altered prescriptions

Table 1 lists the nine altered prescriptions as the maintenance situations they represent. All modes accepted the valid prescription. Proof-based authorization rejected every alteration, and rejected proposals left the asset record unchanged; in particular, an unregistered risk limit was blocked by checking the auditor-approved kernel parameters on-chain even before pairing verification. Hash checks stopped the five situations that change which asset, state, model, or policy is referenced, but accepted the four that change the decision itself while the references stay intact. Endorsement alone accepted everything. Recomputation on disclosed inputs rejected the same decision changes and accepted only a corrupted proof attached to the correct action.

AlterationPlant-level situationProofRecomputeHashEndorse
State substitutionPrescription computed on an edited or outdated asset condition×××✓
Model substitutionSupplier deploys an unapproved model update×××✓
Policy substitutionCosts or action set changed without quality/safety approval×××✓
Stale epochOld prescription resubmitted after the asset state changed×××✓
Cross-asset reusePrescription for one machine reused for another×××✓
Action tamperingAction edited after computation (e.g., in a planning tool)××✓✓
Forged evidenceSupporting evidence fabricated or corrupted×✓✓✓
Non-optimal action swapA costlier or more convenient action chosen instead of the optimum××✓✓
Unregistered risk limitRisk threshold relaxed or tightened outside the approved policy××✓✓
Altered prescriptions released as work orders0/91/94/99/9

Table 1. Acceptance of nine contested or mis-operated prescriptions on the four-organization Fabric testbed (× = rejected, ✓ = accepted and released as a work order). All modes accepted the valid control.

Maintenance consequences of accepted alterations

In the paired simulation (central setting), the industrial consequence of the four alterations accepted by hash checks depended on the tampering direction. Under action inflation, unscheduled major overhauls raised mean paired cost by 44,960 to 55,066 normalized units over the clean policy’s 31,845 (all 95% bootstrap intervals above +36,458). Under intervention suppression, delaying prescribed maintenance lowered apparent short-term expenditure by 19,651 to 21,528 units while raising mean late maintenance events from 0.00 to between 0.70 and 0.83 per seed, affecting 65 to 75 of the 100 seeds. Bidirectional flips raised mean paired cost by 43,490 to 51,697 units. Endorsement-only authorization released all nine alterations with comparable cost surges (44,960 to 55,066) or late-event exposure (0.70 to 0.83 across 65 to 77 seeds), whereas proof-based and recomputation modes kept action flips and paired cost and risk deltas at zero.

Policy cost and late-event comparison

Across all 2,700 scenario-seed runs (54,000 decisions), the proved rule produced zero horizon-domain rejections and zero late maintenance events, selecting 34,155 deferrals, 18,828 online washes, and 1,017 major overhauls. In the central setting (100 paired seeds), always deferring incurred 7,650 mean cost and 7.65 downtime cycles but suffered 1.53 mean late events (all 100 seeds affected). The unproved median-threshold heuristic eliminated late events at a mean cost of 45,105 and 28.29 downtime cycles. The proved rule also eliminated all late events (0.00) while lowering mean cost by 29% to 31,845 (95% interval [28,396, 35,457]) and downtime to 21.63 cycles (63.5% deferrals, 34.7% water washes, 1.9% turbine visits), because its integer objective balances early-maintenance waste against threshold risk.

Proof and ledger performance

Independent Python, Go, and circuit implementations produced identical integer accumulators, and exact q50 conversion agreed on all 179,106 labelled comparisons across 59,702 records with zero domain rejections (maximum q50: 15,287 cycles). Across the benchmark snapshots, the proved rule selects all four candidates (19,913 deferrals, 36,607 washes, 2 compressor visits, 3,180 turbine visits), and valid Groth16 proofs verified for real snapshots of every action and domain boundary while rejecting all 15 mutation classes (Table 2).

MeasureResult
Constraints (total / planner)29,048 / 11,010
Proof / key size164 B / 780 B
Proof / verify time52.71 ms / 0.381 ms
Conversion mismatches0 / 179,106
Domain rejections0 / 59,702
Proved actions / mutations4 of 4 / 15 of 15
Constant ref. / integer student136.93 / 85.29

Table 2. Integrated proof (medians of five local runs; verification averaged over 100 calls per run) and grouped prognosis score (macro score over four held-out engines; lower is better).

Across three fresh ledgers all 1,620 measured transactions committed. At one transaction per second the median round trip was 1,344 ms for proof-based, 1,343 ms for hash-only, and 1,343 ms for endorsement-only authorization; verification inside the endorsing peers took a median of 0.703 ms (peer-restart medians 0.608–0.782 ms), about 0.05% of the round trip (Figure 2). With verification-key caching, across-restart median committed throughput at 256 offered transactions per second reached 69.5, 65.0, and 69.7 transactions per second for proof-based, hash-only, and endorsement-only modes (median round trips 341, 344, and 334 ms), and the peer-restart throughput ranges overlapped across all three modes.

Figure 2. Committed versus offered throughput in short bursts. Solid lines are medians over three fresh ledgers; the dashed line marks equality up to 64 transactions per second.

Discussion

Comparison with prior studies

Table 1 clarifies how calculation verification extends prior blockchain applications in maintenance and manufacturing. Platforms for rolling-stock maintenance records [1], multi-factory collaborative maintenance [17], and digital-twin state synchronization (Zhang et al., 2024) use permissioned ledgers to authenticate participants and anchor shared state hashes, while treating off-chain optimization outputs as given. That boundary protects provenance of the inputs yet leaves the decision step itself exposed during work-order hand-overs, where manual action edits, convenient overhaul substitutions, or relaxed risk limits can pass hash checks under valid signatures. Regarding RQ1 and RQ2, enforcing proof verification at endorsement closes this hand-over gap without disclosing model weights or plant sensor histories, protecting both the operator against inflated overhaul spend and the safety function against deferred interventions whose short-term cost savings mask rising failure risk. Because pairing verification is orders of magnitude shorter than Fabric endorsement and ordering, adding calculation checks strengthens work-order governance without degrading consensus latency or burst throughput.

The workflow also connects single-enterprise prescriptive maintenance with verifiable machine learning. Existing prescriptive methods couple prognosis with cost- and resource-aware action selection [12, 16, 11] under the assumption that one organization controls both model inference and work execution; in cross-company service contracts, confidentiality and misaligned incentives slow practical adoption [15, 5]. Meanwhile, succinct proofs have been demonstrated for standalone neural predictions [10] and model-procurement benchmarks [3], without binding asset-epoch freshness, auditor-approved risk bounds, and candidate optimality inside multi-party endorsement [2]. Where partners can share weights and sensor snapshots inside one corporate boundary, on-chain recomputation provides the same protection against decision tampering more simply; cryptographic proofs become worthwhile when supplier models or plant data are proprietary, and additionally prevent corrupted evidence from entering the audit archive.

Operationally, requiring a proof at endorsement moves policy alignment into contract setup: operator, OEM, contractor, and auditor agree up front on candidate actions, cost weights, and risk limits, settling rule compliance before work-order release. Subsequent disagreements over a maintenance outcome then center on whether the agreed parameters reflect plant economics and risk appetite, since adherence to the registered rule is established at endorsement. Because the chaincode and circuit depend only on a committed feature vector, a frozen integer horizon model, and priced candidates, the same structure transfers to machine-tool spindles, process compressors, and robotic cells maintained under OEM service agreements [7, 5], where larger models or action sets increase off-chain proving effort while proof size and peer verification cost remain constant on-chain.

Limitations and future work

First, the public engine benchmark includes ground-truth labels for only a small cohort [14], making the prognostic fit exploratory, and the maintenance consequences are derived from a stylized renewal simulator under three tampering regimes. Second, although cost-and-risk calibration enabled the proved policy to balance online servicing, overhauls, and deferrals without late failures, the circuit still evaluates an isolated asset at a single decision epoch under a binary risk step, whereas plant maintenance planning couples multiple machines through shared crews, spare-part inventories, and opportunistic shutdown windows [11, 17]. Future work will extend (2) to multi-asset window scheduling with piecewise-linear hazard approximations and validate both the prognostic and cost parameters on industrial plant datasets.

Third, the testbed runs one peer per organization on a single host, uses local test certificates and Groth16 setup keys [9], evaluates short transaction bursts instead of sustained multi-host traffic, and stops at the ledger boundary without a live CMMS connector, while covering a finite set of contract-boundary faults. Corresponding future work will test multi-host endorsement under sustained plant workloads, replace local setup keys with ceremony-managed or transparent proof backends, and close the loop from ledger work-order events and contractor receipts back to plant CMMS records and digital-twin state commitments (Errandonea et al., 2020; Chen, 2025).

Conclusion

Permissioned blockchains can coordinate equipment suppliers, plant operators, contractors, and quality/safety functions in prescriptive maintenance, yet standard endorsement checks only signatures and record hashes. VeriPsM requires endorsing peers to verify a succinct proof of the prescription calculation alongside approved policy bounds before releasing a work order. On a four-organization Fabric testbed with a public engine benchmark, a calibrated proved policy eliminated simulated late events at 29% lower cost than a threshold heuristic. and rejected all nine contested or mis-operated prescriptions, compared with four accepted under hash checks and nine under endorsement alone, at 0.703 ms median peer verification time and with matching short-burst throughput across modes.

Acknowledgements

The work was carried out within Chalmers’ Area of Advanced Production whose support is greatly acknowledged. The computation was enabled by resources provided by the National Academic Infrastructure for Supercomputing in Sweden (NAISS), partially funded by the Swedish Research Council through grant agreement no. 2022-06725.

References

  1. [1]Yawar Abbas, Alberto Martinetti, Jan-Jaap Moerman, Ton Hamberg, and Leo A. M. van Dongen. Do you have confidence in how your rolling stock has been maintained? A blockchain-led knowledge-sharing platform for building trust between stakeholders. International Journal of Information Management, 55:102228, 2020. doi: 10.1016/j.ijinfomgt.2020.102228.DOI
  2. [2]Elli Androulaki, Artem Barger, Vita Bortnikov, et al. Hyperledger Fabric: A distributed operating system for permissioned blockchains. In Proceedings of the Thirteenth EuroSys Conference, 2018. doi: 10.1145/3190508.3190538.DOI
  3. [3]Jay Bojič Burgos, Urban Sedlar, and Matevž Pustišek. Model procurement for industrial cyber-physical systems using cryptographic performance attestation. Future Internet, 18(3):146, 2026. doi: 10.3390/fi18030146.
  4. [5]Siyuan Chen, Ebru Turanoglu Bekar, Jon Bokrantz, and Anders Skoogh. AI-enhanced digital twins in maintenance: Systematic review, industrial challenges, and bridging research-practice gaps. Journal of Manufacturing Systems, 82:678–699, 2025. doi: 10.1016/j.jmsy.2025.07.006.DOI
  5. [6]ConsenSys. gnark: A zk-SNARK library for Go. Software documentation, 2026. URL https://docs.gnark.consensys.io/. Version 0.12.0 used in this work; accessed 2026-08-18.
  6. [7]Itxaro Errandonea, Sergio Beltrán, and Saioa Arrizabalaga. Digital twin for maintenance: A literature review. Computers in Industry, 123:103316, 2020. doi: 10.1016/j.compind.2020.103316.DOI
  7. [8]Rosario Gennaro, Craig Gentry, and Bryan Parno. Non-interactive verifiable computing: Outsourcing computation to untrusted workers. In Advances in Cryptology – CRYPTOLOGY 2010, pages 465–482, 2010. doi: 10.1007/978-3-642-14623-7_25.DOI
  8. [9]Jens Groth. On the size of pairing-based non-interactive arguments. In Advances in Cryptology – EUROCRYPT 2016, pages 305–326, 2016. doi: 10.1007/978-3-662-49896-5_11.DOI
  9. [10]Tianyi Liu, Xiang Xie, and Yupeng Zhang. zkCNN: Zero knowledge proofs for convolutional neural network predictions and accuracy. In Proceedings of the 2021 ACM SIGSAC Conference on Computer and Communications Security, pages 2968–2985, 2021. doi: 10.1145/3460120.3485379.DOI
  10. [11]Haoyang Mao, Zhenyu Liu, Chan Qiu, Yu Huang, and Jianrong Tan. Prescriptive maintenance for complex products with digital twin considering production planning and resource constraints. Measurement Science and Technology, 34(12):125903, 2023. doi: 10.1088/1361-6501/aced5f.DOI
  11. [12]Kurt Matyas, Tanja Nemeth, Klaudia Kovacs, and Robert Glawar. A procedural approach for realizing prescriptive maintenance planning in manufacturing industries. CIRP Annals, 66(1):461–464, 2017. doi: 10.1016/j.cirp.2017.04.007.DOI
  12. [13]Van Duc Nguyen, Marios Kefalas, Kaifeng Yang, Asteris Apostolidis, Markus Olhofer, Steffen Limmer, and Thomas Bäck. A review: Prognostics and health management in automotive and aerospace. International Journal of Prognostics and Health Management, 10(2), 2019. doi: 10.36001/ijphm.2019.v10i2.2730.DOI
  13. [14]Prognostics and Health Management Society. PHM North America 2025 Conference Data Challenge. PHM Society Data Repository, 2025. URL https://data.phmsociety.org/phm-north-america-2025-conference-data-challenge/. Accessed 2026-08-18.
  14. [15]J. P. Sprong, X. Jiang, and H. Polinder. A deployment of prognostics to optimize aircraft maintenance: A literature review. Annual Conference of the PHM Society, 11(1), 2019. doi: 10.36001/phmconf.2019.v11i1.776.DOI
  15. [16]Heletjė E. van Staden, Laurens Deprez, and Robert N. Boute. A dynamic “predict, then optimize” preventive maintenance approach using operational intervention data. European Journal of Operational Research, 302(3):1079–1096, 2022. doi: 10.1016/j.ejor.2022.01.037.DOI
  16. [17]Hongfeng Wang, Qi Yan, and Junwei Wang. Blockchain-secured multi-factor production with collaborative maintenance using Q learning-based optimisation approach. International Journal of Production Research, 61(11):3685–3702, 2023. doi: 10.1080/00207543.2021.2002968.

Paper details

vlnc:W_atxe69xm
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC BY 4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Computer Science

Not recorded for this paper

View statement
Looking for related papers…
Contents