Abstract

Data centers requiring continuous operation rely on onsite generation and battery storage during blackouts. Their return to grid supply must be coordinated with the restoration of other loads because demand fluctuations can affect system frequency. This paper adds constraints to a restoration optimization problem that coordinates load pickup, grid supply to data centers, onsite generation, and battery operation. These constraints reserve battery power and energy to accommodate bounded demand changes while maintaining approved grid supply to data centers. The method accounts for processing delays and checks resource limits using updated operating states before applying commands. Phasor-domain simulations of a low-inertia restoration scenario show that the method serves 760 MW of load outside the data centers and satisfies all tested operating limits. Nominal and frequency-aware benchmarks serve 840 MW and 800 MW, respectively, but violate operating limits.

Introduction

Data centers requiring continuous operation rely on onsite generation and storage during blackouts [1]. Returning to grid supply transfers their demand to a partially restored system alongside native load pickup, defined here as the restoration of loads outside the data centers. AI training and checkpoint cycles produce rapid demand changes [2]. Coordinated onsite resources can contain these fluctuations [3], but limited power and energy reserves can expose the recovering grid to frequency excursions, rate-of-change-of-frequency (RoCoF) violations, and voltage deviations.

Prior work addresses parts of this problem. Frequency-constrained restoration embeds nadir bounds in sequential mixed-integer linear programs (MILPs) [4] and coordinates renewables and grid-forming (GFM) loads under nadir, RoCoF, and storage limits [5]. Data-center studies coordinate workloads and emergency supplies [1], calibrate dynamic load models [6], and assess reconnection timing and ramping from grid-side trajectories [7]. On the storage side, our earlier GFM battery energy storage system (BESS) study [8] demonstrated power tracking, voltage support, and islanding. Azizi et al. [9] demonstrated GFM-BESS load smoothing and supply continuity, assuming sufficient state-of-charge (SOC) headroom for short-duration studies and assigning sustained energy management to a higher-level controller. These studies do not explicitly address reserving bidirectional BESS power and energy to sustain approved grid supply to data centers under bounded, unannounced demand changes during native load restoration.

Maintaining approved grid supply to a data center requires onsite flexibility in both directions. When facility demand rises, onsite resources must increase net supply; when it falls, they must reduce supply or absorb surplus power. A BESS near its lower energy limit has limited discharge duration, while one near its upper limit has little room to absorb additional energy.

The problem addressed here is sustaining approved point-of-common-coupling (PCC) supply despite bounded, unannounced demand changes while restoring native loads. Processing delays complicate this decision because resource states continue to evolve before an approved command is applied. This paper (i) schedules native load pickup and grid supply to data centers through sequential MILPs, reserving bidirectional onsite power and energy flexibility; (ii) incorporates processing delays and rechecks continuous-time BESS power and energy feasibility using updated states before command application; and (iii) demonstrates, through independent phasor-domain simulations of a low-inertia restoration scenario, that frequency-aware load pickup can still violate operating limits when onsite resources cannot sustain approved grid supply to data centers.

Figure 1 shows the overall organization of the paper.

Figure 1. Overall organization of the paper.

Data Center-Aware Restoration Method

Load Pickup and Power Scheduling

Indices jj, ii, gg denote native load tasks, data-center facilities, and grid sources. Native demand is PN=Pbase+∑j(nj+cj)P_N = P_{\mathrm{base}} + \sum_j(n_j + c_j), where njn_j is additional restored service and cjc_j is cold-load excess. Reactive demand follows each bus’s nominal Q/PQ/P ratio. Facility power balance is

qia+Di+Bi+Fi=di−Ui,Li=qia−qi,(1)q_i^{a} + D_i + B_i + F_i = d_i - U_i, \qquad L_i = q_i^{a} - q_i, \tag*{(1)}

where qiaq_i^{a}, qiq_i are actual and approved grid supply at the PCC; DiD_i, BiB_i, FiF_i are diesel, BESS, and fast-buffer powers; and did_i is demand. Positive storage power denotes discharge; Ui>0U_i > 0 denotes unmet demand and Ui<0U_i < 0 unabsorbed excess. Exporting power from facility to the grid is prohibited in this work, and reactive import follows cos⁡φi\cos\varphi_i. Local dynamics include

D˙i=clip⁡((ui−Di)/TD,i;−rD,i,rD,i),(2)\dot{D}_i = \operatorname{clip}\left((u_i - D_i)/T_{D,i}; -r_{D,i}, r_{D,i}\right), \tag*{(2)}
E˙i=−Ψη,Bi(Bi)/κt,e˙i=−Ψη,Fi(Fi),(3)\dot{E}_i = -\Psi_{\eta,B_i}(B_i)/\kappa_t, \qquad\dot{e}_i = -\Psi_{\eta,F_i}(F_i), \tag*{(3)}

Here uiu_i, TD,iT_{D,i}, rD,ir_{D,i} are diesel command, lag, and slew, and Ψη(p)=max⁡{p/η,ηp}\Psi_\eta(p) = \max\{p/\eta,\eta p\} for efficiency 0<η≤10 < \eta\le1. Time is in seconds, EiE_i in MWh, eie_i in MJ, and κt=3600\kappa_t = 3600 s/h. Resources have finite response and power/energy limits.

Requests at tmt_m, spaced by Δ\Delta, use observed states, remaining ramps, topology, commitments, and demand reference diref(tm)d_i^{\mathrm{ref}}(t_m) from current/past measurements. Operators declare bounds dilo≤di(t)≤dihid_i^{\mathrm{lo}} \le d_i(t) \le d_i^{\mathrm{hi}} from workload knowledge; these remain fixed in this study. For each candidate action set satisfying all prerequisites μ∈Mm\mu\in\mathcal{M}_m, including the empty batch, solve

Jm∗(μ)=min⁡z^∈F^m(μ){Δh∑ℓ=1NpLℓ+κs∑jξj+κμν(μ)}(4)J_m^*(\mu)=\min_{\hat{z}\in\hat{\mathcal{F}}_m(\mu)}\left\{\Delta_h\sum_{\ell=1}^{N_p}\mathcal{L}_{\ell}+\kappa_s\sum_j\xi_j+\kappa_\mu\nu(\mu)\right\} \tag*{(4)}

Here z^\hat{z} collects predicted decisions, F^m\hat{\mathcal{F}}_m is their feasible set, ℓ\ell indexes intervals, and Δh=Δ/κt\Delta_h=\Delta/\kappa_t. Priority πj\pi_j rewards service; ξj\xi_j denotes deadline shortfall and ν(μ)\nu(\mu) counts actions. The running cost is

Lℓ=−cN∑jπjn^ℓj−cq∑iq^ℓi+Cℓ.(5)\mathcal{L}_{\ell}=-c_N\sum_j\pi_j\hat{n}_{\ell j}-c_q\sum_i\hat{q}_{\ell i}+C_{\ell}. \tag*{(5)}

Cost CℓC_{\ell} weights BESS discharge/charge, diesel commands, and source output by cdis,cch,cD,cgc_{\mathrm{dis}},c_{\mathrm{ch}},c_D,c_g.

The MILP includes standard constraints used in power system optimization; only selected equations are presented here for brevity. The MILP enforces nondecreasing load pickup blocks n^ℓj=njpklxℓj\hat{n}_{\ell j}=n_j^{\mathrm{pkl}}x_{\ell j}, xℓj∈Z≥0x_{\ell j}\in\mathbb{Z}_{\ge0}; release/connectivity rules; cold-load pickup; resource limits, slews, and energy; diesel lag; branch-flow limits; and heuristic frequency/RoCoF screens. Each stage TstT_{\mathrm{st}} permits one positive pickup commitment up to Nˉst\bar{N}_{\mathrm{st}}. The buffer has no sustained schedule. Nominal generation covers native demand, grid supply at the PCC, and a loss allowance ϵloss\epsilon_{\mathrm{loss}}. Facility balance is q^ℓi+D^ℓi+b^ℓi+−b^ℓi−=diref(tm)\hat{q}_{\ell i}+\hat{D}_{\ell i}+\hat{b}^{+}_{\ell i}-\hat{b}^{-}_{\ell i}=d_i^{\mathrm{ref}}(t_m); nonnegative BESS discharge/charge powers update energy by

ΔE^ℓi=−Δh(b^ℓi+ηB,i−ηB,ib^ℓi−).\Delta\hat{E}_{\ell i}=-\Delta_h\left(\frac{\hat{b}^{+}_{\ell i}}{\eta_{B,i}}-\eta_{B,i}\hat{b}^{-}_{\ell i}\right).

Simultaneous flows are relaxed and penalized.

Battery Power and Energy Reserves

With BESS tracking reserve ϵP,i\epsilon_{P,i}, usable power is Ri=Bˉi−ϵP,iR_i=\bar{B}_i-\epsilon_{P,i}. For any declared demand, grid–diesel supply must lie between silo=dihi−Ris_i^{\mathrm{lo}}=d_i^{\mathrm{hi}}-R_i and sihi=dilo+Ris_i^{\mathrm{hi}}=d_i^{\mathrm{lo}}+R_i, requiring dihi−dilo≤2Rid_i^{\mathrm{hi}}-d_i^{\mathrm{lo}}\le2R_i. Within battery reserve horizon TreadyT_{\mathrm{ready}}, predicted supply at endpoints ℓΔ\ell\Delta and the steady-state supply under the first control setpoints satisfy

silo≤q^ℓi+D^ℓi≤sihi,silo≤q^1i+u^1i≤sihi.(6)\begin{aligned} s_i^{\mathrm{lo}} &\le\hat{q}_{\ell i}+\hat{D}_{\ell i}\le s_i^{\mathrm{hi}},\\ s_i^{\mathrm{lo}} &\le\hat{q}_{1i}+\hat{u}_{1i}\le s_i^{\mathrm{hi}}. \tag*{(6)} \end{aligned}

Both supplies are also constrained to the demand interval [dilo,dihi][d_i^{\mathrm{lo}},d_i^{\mathrm{hi}}].

To ensure feasibility between endpoints, the grid–diesel supply during the first ramp 0≤σ≤Tr=Δ0\le\sigma\le T_r=\Delta is modeled as

si(1)(σ)=(1−α)q0i+ϕiD0i+(1−ϕi−ωi)u0i+αq1i+ωiu1i,α=σ/Tr,ϕi=e−σ/TD,i,ωi=[σ−TD,i(1−ϕi)]/Tr.(7)\begin{aligned} s_i^{(1)}(\sigma)&=(1-\alpha)q_{0i}+\phi_iD_{0i}+(1-\phi_i-\omega_i)u_{0i}\\ &\quad+\alpha q_{1i}+\omega_i u_{1i},\qquad\alpha=\sigma/T_r,\\ \phi_i&=e^{-\sigma/T_{D,i}},\qquad\omega_i=[\sigma-T_{D,i}(1-\phi_i)]/T_r. \tag*{(7)} \end{aligned}

Here (q0i,u0i,D0i)=(qi,ui,Di)(tm)(q_{0i},u_{0i},D_{0i})=(q_i,u_i,D_i)(t_m) are the states at the current request time. At samples σk=kTs\sigma_k=kT_s, k=1,…,Tr/Tsk=1,\ldots,T_r/T_s, impose

silo+ϵisamp≤si(1)(σk)≤sihi−ϵisamp,(8)s_i^{\mathrm{lo}}+\epsilon_i^{\mathrm{samp}}\le s_i^{(1)}(\sigma_k)\le s_i^{\mathrm{hi}}-\epsilon_i^{\mathrm{samp}}, \tag*{(8)}

Here ϵisamp=ΓiTs2/8+ϵnum,i\epsilon_i^{\mathrm{samp}}=\Gamma_iT_s^2/8+\epsilon_{\mathrm{num},i} bounds interpolation and numerical errors. For the unclipped diesel model, ∣s¨i(1)∣≤Γi|\ddot{s}_i^{(1)}|\le\Gamma_i (MW/s2^2), with

Γi=∣D0i−u0i∣TD,i2+max⁡{u0i,uˉi−u0i}TrTD,i,(9)\Gamma_i=\frac{|D_{0i}-u_{0i}|}{T_{D,i}^2}+\frac{\max\{u_{0i},\bar{u}_i-u_{0i}\}}{T_rT_{D,i}}, \tag*{(9)}

Here uˉi\bar{u}_i is the diesel-command limit and ϵnum,i=10−4\epsilon_{\mathrm{num},i}=10^{-4} MW. During processing delay δ∈[0,Td]\delta\in[0,T_{d}], previous ramps continue and hold, yielding retained states qir(δ),uir(δ),Dir(δ)q_i^r(\delta),u_i^r(\delta),D_i^r(\delta). These replace the initial states in (7); linear cuts enforce (8) across the resulting delay-dependent envelopes, including diesel prediction error. Let s~i(σ;δ)\tilde{s}_i(\sigma;\delta) denote the delayed first ramp followed by fixed q^1i,u^1i\hat{q}_{1i},\hat{u}_{1i} and diesel lag. Its cumulative supply energy is Wi(T;δ)=κt−1∫0Ts~i(σ;δ) dσW_i(T;\delta)=\kappa_t^{-1}\int_0^T\tilde{s}_i(\sigma;\delta)\,d\sigma. To prevent BESS depletion or overcharging under extreme demand, at T=ℓΔ≤TreadyT=\ell\Delta\le T_{\mathrm{ready}} impose, with energy margin ϵEplan\epsilon_E^{\mathrm{plan}},

Wi(T;δ)≥dihiT+Bˉiδκt−ηB,i[Ei(tm)−Eimin⁡−ϵEplan],W_i(T;\delta)\ge\frac{d_i^{\mathrm{hi}}T+\bar{B}_i\delta}{\kappa_t}-\eta_{B,i}[E_i(t_m)-E_i^{\min}-\epsilon_E^{\mathrm{plan}}],
Wi(T;δ)≤diloT−Bˉiδκt+Eimax⁡−Ei(tm)−ϵEplanηB,i.(10)W_i(T;\delta)\le\frac{d_i^{\mathrm{lo}}T-\bar{B}_i\delta}{\kappa_t}+\frac{E_i^{\max}-E_i(t_m)-\epsilon_E^{\mathrm{plan}}}{\eta_{B,i}}. \tag*{(10)}

The Bˉiδ\bar{B}_i\delta terms reserve processing-time energy movement. Retained-segment extrema give finite linear constraints. With consistent states/margins and supply within demand bounds, these test endpoint energy, not intermediate-time feasibility.

Resource Checks and Control Actions

At application tat_a, use fresh states and supply si(σ)=qi(ta+σ)+Di(ta+σ)s_i(\sigma)=q_i(t_a+\sigma)+D_i(t_a+\sigma). For d∈{dilo,dihi}d\in\{d_i^{\mathrm{lo}},d_i^{\mathrm{hi}}\}, ideal BESS continuation is

Ei(d)(tp)=Ei(ta)−1κt∫0tpΨB,i(d−si(σ)) dσ.(11)E_i^{(d)}(t_p)=E_i(t_a)-\frac{1}{\kappa_t}\int_0^{t_p}\Psi_{B,i}(d-s_i(\sigma))\,d\sigma. \tag*{(11)}

For every 0≤tp≤Tres=min⁡{Tready,Tobs−ta}0 \le t_p \le T_{\mathrm{res}}=\min\{T_{\mathrm{ready}},T_{\mathrm{obs}}-t_a\}, require

silo≤si(tp)≤sihi,∣D˙i(ta+tp)∣≤rD,i,s_i^{\mathrm{lo}} \le s_i(t_p) \le s_i^{\mathrm{hi}}, \qquad\left|\dot{D}_i(t_a+t_p)\right| \le r_{D,i},
Eimin⁡+ϵE≤Ei(dihi)(tp),Ei(dilo)(tp)≤Eimax⁡−ϵE,E_i^{\min}+\epsilon_E \le E_i^{(d_i^{\mathrm{hi}})}(t_p), \qquad E_i^{(d_i^{\mathrm{lo}})}(t_p) \le E_i^{\max}-\epsilon_E,
eimin⁡+ϵF≤ei(ta)≤eimax⁡−ϵF.(12)e_i^{\min}+\epsilon_F \le e_i(t_a) \le e_i^{\max}-\epsilon_F. \tag*{(12)}

Extrema occur at segment boundaries, supply stationary points, and crossings si=ds_i=d. Monotonicity of Ψη\Psi_\eta bounds ideal energy for every demand trajectory within the declared bounds; the diesel-rate test verifies the predicted diesel response without active ramp limiting. The continuous-time BESS power and energy checks are conditional on fresh states, declared bounds, and fixed controls. The buffer row checks initial energy only. Its 0.5 MJ provides just 10 ms at 50 MW, or 5 ms from the initial midpoint, neglecting losses; sustained buffer feasibility is not verified.

In Algorithm 1, quasi-steady-state (QSS) checks solve droop-distributed alternating-current (AC) balances at 7.5-s ramp samples and pickup breakpoints, testing voltage, current, branch loading, and synchronous-generator (SG) reactive power. B/C also require frequency deviation within 0.45 Hz. An aggregate swing observer, separate from phasor replay, uses summed inertia, source droop/lag/limits, actual, and a fixed initial loss fraction; B/C require its frequency within 0.08 Hz of 60 Hz at acceptance. Application at ta=tm+τmt_a=t_m+\tau_m requires τm≤Td\tau_m \le T_d, final verification within TcT_c, and a passing post-delay audit. Commands ramp over TrT_r; pickup starts after TNT_N at rate rNr_N. Changed controls/bounds end the previous verified battery operating interval; rejection grants no extension. Retained ramps require fresh checks.

Figure 2. Restoration island and prepared extensions. Dashed elements are initially de-energized; branch 3–4 remains open.

Test System and Results

IEEE 39-bus System and Simulation Settings

The modified IEEE 39-bus system starts with a 13-bus island, data centers at buses 14 and 24, and 200 MW of restored native load (Fig. 2). Table I lists an additional 640 MW of native load and its release times. SG34 becomes available at 2820 s. GFM33/GFM35/GFM36 initially have ratings of 200 MVA each. Rating upgrades to 300/300/250, 400/450/350, and 500/550/400 MVA become available at 2820, 3000, and 3600 s, respectively. Each action requires its prerequisites to be met and must pass checks using updated operating states.

Case A uses nominal planning, 20-MW/s pickup, GFM ceiling 0.90SgS_g, and SG ceiling 508 MW. B adds conservative dispatch, stage caps, frequency/RoCoF screens, and tighter checks. C adds battery reserve scheduling, power and energy checks, and repeated checks for unchanged controls. B/C share grid margins and pickup rules, isolating the additional battery reserve constraints and checks; A also differs in ramp/dispatch limits. Hardware, initial states, objectives, workloads, and delays are common.

Demand is reconstructed from published profiles [2], [10]. Added 30-s events drive bus 14 to 20 MW at 1800 s and bus 24 to 35 MW at 2700 s, with 0.1-s rise and fall times. The controller knows bounds, not future events. Table II gives C settings. B/C need at least seven 600-s stages to add 640 MW under the 100-MW cap, precluding completion before 3600 s even without delays/ramps. Unused allowance cannot

ParameterValue
Request/ramp, Δ\Delta, TrT_r; stage/reserve60 s; 600 s
Horizons, NpΔ/TobsN_p\Delta/T_{\mathrm{obs}}1800/4800 s
Total/closing deadline, TdT_d, TcT_c10/0.15 s
Pickup rate/onset, rNr_N, TNT_N2 MW/s; 3 s
pickup block size/stage limit; cold-load fraction/decay10/100 MW; 0.15/120 s
Demand bounds, [dilo,dihi][d_i^{\mathrm{lo}},d_i^{\mathrm{hi}}][20, 35]/[5, 35] MW[?, ?]
Available BESS power, Bˉi\bar{B}_i15/18 MW
Installed BESS rating/energy50 MVA/10 MWh
Initial BESS energy; bounds5.5 MWh; [2, 9] MWh
Initial diesel; limit uˉi\bar{u}_i30/20 MW; 35 MW
Diesel lag/slew10 s/1 MW/s
PCC cap/slew; power factor36.47952 MW/0.3 MW/s; 0.98
Buffer power/capacity/initial energy50 MW/0.5 MJ/0.25 MJ
BESS/buffer efficiency0.97/0.99
BESS nominal delay/lag2/1 ms
BESS energy margins, ϵEplan/ϵE\epsilon_E^{\mathrm{plan}}/\epsilon_E0.04/0.03 MWh
Buffer guard, ϵF\epsilon_F; sample period TsT_s0.12 MJ; 1 s
GFM/SG droop4/5%
GFM/SG response lag; dispatch ceiling0.08/0.6 s; 0.85Sg0.85S_g/450 MW
Grid-storage energy per rating; initial SOC2 MWh/MVA; 80%
Planning loss/energy factor1%/1.25

Table II. Principal Case C parameters and initial conditions.

Figure 2 (PDF p. 3). Restoration island and prepared extensions. Dashed elements are initially de-energized; branch 3–4 remains open.

TaskBusAdded MWRelease (s)Deadline (s)πj\pi_j
B20202006001.0
B18186060012001.2
B3390120018001.0
B44130180024001.1
B1515160030001.0
B2121180036001.2

Table 1. Native Load Restoration Tasks. Added loads exclude initial service; deadlines are soft.

be recovered within a stage.

Facility pairs denote buses 14/24; SgS_g is current GFM rating; PCC power factor is lagging.

This is a low-inertia scenario; demand bounds and margins are study choices. The 2.25-MW reserve gives usable BESS powers 12.75/15.75 MW. Objective weights (cN,cq,κs,κμ)=(10,1,1000,0.02)(c_N,c_q,\kappa_s,\kappa_\mu)=(10,1,1000,0.02) favor service/deadlines; (cdis,cch,cD)=(0.05,1.05,0.20)(c_{\mathrm{dis}},c_{\mathrm{ch}},c_D)=(0.05,1.05,0.20) and cg=0.04/0.01c_g=0.04/0.01 penalize facility and GFM/SG output.

AC acceptance uses constant active/reactive-power loads. Replay uses native constant-impedance/current/power (ZIP) fractions, normalized to initial voltage, and fixed PCC power factor. Operating limits are 59.5–60.5 Hz, backward 100-ms RoCoF of 1.5 Hz/s, and 0.94–1.06 pu voltage.

Implementation and Computation

The study uses relative gap 10−510^{-5} and a 10,000-node limit. The largest Case C problem contains 1026 decision variables and 1891 constraints. Building and solving an individual MILP in Case C took a median of 0.041 s and a maximum of 0.122 s. Across 80 requests per case, the median and maximum times for search, acceptance, and closing were 3.38 and 18.06 s for A, 1.04 and 14.80 s for B, and 0.93 and 8.97 s for C. The corresponding numbers of requests that missed a computation deadline were 1, 5, and 0. These measured times exclude simulation state propagation, warmup, saving outputs, checks after the modeled delay, and independent dynamic replay. The final check at command application was timed separately and took at most 0.087 s in Case C.

Load Restoration and Data Center Supply

Figure 3 and Table III show that Case A violates frequency and RoCoF limits and B exceeds RoCoF while meeting frequency bounds. Both briefly violate the SG reactive lower bound. C passes all tested limits, leaving 80 MW at bus 15 unrestored.

MetricABC
Final native service (MW)840800760
Native energy served (MWh)807.83695.03675.23
Peak absolute PCC error (MW)25.06421.0700.000
Minimum source frequency (Hz)58.301759.611059.9603
Peak 100-ms RoCoF (Hz/s)10.02093.90330.3484
Grid operating checksFailFailPass

Table III. Recorded outcomes over 4800 s.

A–C restoration and phasor replay

Figure 3. A–C restoration and phasor replay: native service, maximum absolute PCC error, source-frequency envelope, and maximum absolute backward 100-ms RoCoF.

C picks up 20 MW less than B before 3000 s and 10 MW less in each of the last two stages. A/B continue diagnostically after violations; their larger totals are not secure outcomes.

Native service excludes grid supply at the PCC.

Figures 4 and 5 show A/B reaching the 2-MWh BESS floor and deviating from PCC commands. All cases have zero deliberate curtailment and numerically negligible unmet facility energy; A/B rely on unplanned grid draw. In Case C, the modeled buffer compensates for power mismatches, keeping PCC power close to its commanded value while remaining within the buffer’s operating limits.

Demand Changes and Battery Limits

Actual and ideal-compensated replay simulations start at 2699 s with identical voltages, source states, energies, and RoCoF history; commands, pickup, and switching stay fixed. An ideal onsite compensation removes subsequent PCC-error variation, retaining the initial offset to avoid an artificial step. Ideal compensation reduces event-window peak RoCoF from 10.0209 to 0.6633 Hz/s in A and from 3.9033 to 0.5648 Hz/s in B; both operating-limit checks during the event window change to pass (Figure 6). C gives 0.0063 Hz/s in both branches. The comparison isolates PCC-error variation in this event window. C’s recorded BESS minima, 3.316/5.274 MWh, exceed the 2-MWh floor (Figure 7). Buffer/voltage ranges are 0.214–0.286 MJ/0.963–1.042 pu; peak current is 0.918 pu and source-MVA/branch ratios are 0.948/0.851.

Actual and ideal-compensated 2700-s event replay

Figure 6. Actual and ideal-compensated 2700-s event replay: frequency envelopes (top) and maximum absolute backward 100-ms RoCoF (bottom).

Facility BESS/buffer energies

Figure 7. Facility BESS/buffer energies.

Conclusion

The proposed restoration method satisfied all evaluated operating limits, whereas both benchmark policies violated those limits despite restoring more native load. These results indicate that secure restoration depends not only on generation availability but also on the ability of data centers to sustain approved grid supply at the PCC under changing demand. The lower pickup in Case C is associated with its additional battery-reserve constraints and resource checks under the adopted stage rules; this scenario does not establish a general restoration limit. The battery power and energy feasibility results remain conditional on declared demand bounds and assumptions of resource response. Future work should evaluate finite-bandwidth resource dynamics and broader demand and restoration scenarios to establish the approach’s applicability beyond the conditions studied.

Bus-14 demand, approved/actual grid supply at the PCC, diesel, BESS, and buffer powers for A–C

Figure 4. Bus-14 demand, approved/actual grid supply at the PCC, diesel, BESS, and buffer powers for A–C. Storage power is positive on discharge.

Bus-24 power sharing for A–C

Figure 5. Bus-24 power sharing for A–C, using the signals and sign convention of Fig. 4.

References

  1. [1]S. Wang, T. Ding, Y. Ding, and Y. Yang, “Black-Start Restoration Within the Data-Center-Integrated Power System Based on Distributed Optimization,” IEEE Trans. Ind. Appl., vol. 62, no. 5, pp. 8530–8544, Sep. 2026.DOI
  2. [2]North American Electric Reliability Corporation, “Characteristics and risks of emerging large loads,” Large Loads Task Force, White Paper, Jul. 2025.
  3. [3]M. Omri, R. Quint, R. Elliott, P. Khargonekar, M. A. Mirzaei, K. Thomas, and M. Parvania, “AI data centers and the grid: New challenges and opportunities for reliability and resilience,” IEEE Energy Sustainability Magazine, vol. 2, no. 3, pp. 28–40, Aug. 2026.DOI
  4. [4]X. Zou, I. Farhat, and J. W. Simpson-Porco, “A method for incorporating frequency nadir limits in power system restoration planning,” in Proc. IEEE Electrical Power and Energy Conf. (EPEC), 2025, pp. 254–259.
  5. [5]Y. Huang, S. Lei, Y. Wang, J. Wu, G. Huang, and A. Wang, “Integrating Renewables and Grid-Forming Loads for Optimized Parallel Black-Start Restoration,” in Proc. IEEE Power & Energy Soc. General Meeting (PESGM), Jul. 2025, pp. 1–5.DOI
  6. [6]S. Lu, C. Xiao, and Y. Weng, “Dynamic Load Model for Data Centers with Pattern-Consistent Calibration,” Feb. 2026, arXiv:2602.07859 [cs.LG].arxiv.org/abs/2602.07859
  7. [7]C. Chao, Z. Ma, and Z. Zhang, “Dynamic Resilience Assessment of Power Systems With Data Center Load Events Using Physics-Informed Neural Networks,” Jun. 2026, arXiv:2606.22590 [eess.SY].arxiv.org/abs/2606.22590
  8. [8]Y. Abyudak, M. Alzadeh, and W. Sun, “Mitigating Data Centers Load Risks and Enabling Grid Support Functions through Grid-Forming Control,” in Proc. IEEE Power & Energy Soc. General Meeting (PESGM), Jul. 2026, pp. 1–5.
  9. [9]A. Azizi, S. Morovati, A. Zamani, J. Piruzza, D. Guo, Z. Liu, and P. Taimela, “Strengthening Data Center Operations Using Grid-Forming Battery Energy Storage as a Line-Interactive Uninterruptible Power Supply,” Int. J. Electr. Power Energy Syst., vol. 175, p. 111638, Feb. 2026.DOI
  10. [10]J. Matevosyan, “Large load data centers: Interconnection with the power system,” Power in Mind, OPAL-RT Technologies, vol. 11, Fall 2025, accessed: Nov. 5, 2026. [Online]. Available: https://www.opal-rt.com/power-in-mind/volume-11/article-1/

Paper details

vlnc:W_fmfc7f6a
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC BY 4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…
Contents