betaFeedback

WorksComputer Science

Configuration Migration Planning through Decoupled Modeling and Searching

Abstract

Executing large network configuration changes, called migrations, is slow and error-prone today; operators must manually devise a safe order for updating devices that does not disrupt traffic and meets operational intents (e.g., low total time). We develop Smoothie, a versatile migration planning framework that, unlike existing tools, can support diverse operational intents. Inspired by automated planning, it achieves versatility by decoupling the encoding of network safety and intents from the search for a viable plan. Smoothie uses symbolic simulation for general and scalable safety encoding, after which it can use a range of planners, including existing off-the-shelf planners and a new one we developed for optimized parallel plans. We demonstrate Smoothie's versatility and benchmark its performance using diverse migration scenarios on many topologies. It finds both sequential plans and parallel plans, and the parallel ones compress up to thousands of configuration updates into no more than 3 steps. Its versatility does not come at the expense of performance: finishing most planning tasks in less than 1 hour.

Introduction

Modern networks are constantly evolving with large-scale configuration change [30, 46, 56, 58], e.g., moving from iBGP full mesh to route reflection, merging two networks, and changing the routing protocol from OSPF to BGP. Planning such large-scale changes, termed migrations, is highly demanding [30].

First, safety is the top concern: since a migrations can be highly risky, e.g., affecting hundreds and even thousands of devices, the order of updates must ensure that the network is always in a safe state. For example, before turning down a link, operators need to ensure the traffic has been shifted to another path, in order to not disrupt the live traffic. For another example, changing BGP configurations requires extreme carefulness to not introduce transient or persistent property violations, e.g., forwarding loops, blackholes (see § 2).

Beyond safety, operators may have diverse intent when planning a migration. For most of cases, they may just want to find a safe sequence as soon as possible, and therefore a sequential plan is enough. Besides this, operators may require or prefer one update should take place before or after another. In such cases, a sequential plan should not only be safe, but also satisfy some hard constraints and as many soft constraints as possible; we term such a plan as an optimal plan. Finally, operators of large-scale networks may desire a faster migration process, and therefore a parallel plan, where a set of updates can be executed in parallel [36], is more preferred.

Despite the dual requirements on safety and diversity, today’s configuration migration planning (CMP) is still mostly a manual effort. This is not only time-consuming but also error-prone. For one example, a content service provider § 2 reported that manual planning typically took a month or even longer. Even after careful planning, a plan may still contain errors, which, after deployment, take down a production network. For another, 56% of the disruptive customer-impacting incidents in Alibaba during 2016-2017 are due to configuration migration [31].

Recently, several tools have been proposed to automate the planning of configuration migration [9, 10, 43]. At a high level, these tools use specific search strategies and customized network simulators to find a feasible sequence of updates. For example, Snowcap [43] chooses one update each round, incrementally simulates the update, and validate the safety of the resultant state, until all updates have been applied. Different from Snowcap which validates the safety on the fly, SafeMigration [10] and Cursor [9] use symbolic simulation to pre-identify all safe or unsafe intermediate states, and then either invoke SMT solvers or analyze the partial orders of updates to search for a plan. These planners target at finding sequential plans, but fall short for finding optimal plans and parallel plans. Also, they are faced with efficiency issues [10], do not scale to large number of states [43], or are incomplete [9].

In this paper, we seek a principled treatment of migration planning. Specifically, we draw inspiration from the mature research direction of automated planning (AI planning), a subfield of artificial intelligence on automated synthesis of action sequences (i.e., plans). In automated planning, a planning task [32, 51] [45] is executed in two phases: (1) a domain-specific problem modeling phase which models the problem in a standardized language, e.g., Planning Domain Description Language (PDDL) [20], and (2) a domain-independent plan searching, which finds a plan satisfying the model. Such a decoupled workflow offers great flexibility, e.g., they can mix-n-match options that work best for their situation, add new preferences without needing to change the search strategy, or pick a different search strategy without needing to change the problem model.

Inspired by automated planning, we propose a framework for automated migration planning. As shown in Figure 1, the framework features the decoupling of problem modeling and plan searching. In the problem modeling phase, we identify the condition for an update to be safe, and encode the problem in the PDDL language [2]. This allows us to call different backend planners for different planning tasks.

Figure 1. A decoupled framework for automated configuration migration planning.

Realizing this framework is challenging. Particularly, supporting diverse planning tasks means that we need to identify all safe intermediate states, to ensure the searching phase can find update plans that visit only safe states; find the one with the minimum cost (for optimal plan); or identify a set of updates whose order does not matter (for parallel plan). Clearly, using a concrete simulator such as Batfish [14], is not realistic: given nn updates, we will have to simulate up to 2n2^n states 1. Making the simulation incremental, as in Snowcap [43], offer limited help, as will be shown in § 7.5.

To overcome the scalability issue, we adapt the symbolic simulation approach [29, 54, 57, 59], which leverages the equivalence among packet headers, link/node failures, or external routes to scale to a large search space. Specifically, we assign each update a Boolean variable indicating whether it is applied, and symbolically simulate the routing and forwarding behaviors of the network. The key difference is that updates

can affect the existence or value of configuration components, such as BGP sessions and IGP link costs. We generalize SRE’s way of how to initialize and transfer symbolic routes to handle symbolic configurations.

We implement a prototype of SMOOTHIE, and demonstrate its versatility with two planners, FastDownward [21] and ENHSP [41], to find sequential plans. Because a suitable parallel planner does not exist, we also develop a new SMT-based planner to find parallel plans. The prototype will be available to the community upon publication.

We evaluate SMOOTHIE in both real and synthetic migration scenarios. Results show that SMOOTHIE generates useful plans appreciated by operators (§ 2.4), finds parallel plans that compress up to thousands of configurations updates into no more than 3 steps, while being efficient to finish most planning task in less than 1 hour (§ 7).

Motivation

We use two concrete scenarios to motivate the need of an automatic planner for network configuration migration, and why the planner should be versatile.

Manual Migration Planning is Hard

Figure 2 shows a real but simplified migration scenario in a large content service provider (CSP). The CSP has multiple datacenters across the world, interconnected with a backbone WAN. As shown in the figure, A,B,C,DA,B,C,D are backbone routers connecting datacenters DC1DC_1 and DC2DC_2. Initially, the two backbone routers of DC1DC_1 (i.e., A,BA,B) and the two backbone routers of DC2DC_2 (i.e., C,DC,D) form pairwise iBGP sessions, as shown in Figure 2(a). One day, to improve control plane scalability, the operators decide to migrate to a new design with eBGP instead of iBGP, as shown in Figure 2(b). For this migration, the operators need to remove all iBGP sessions, and add two eBGP sessions.

Figure 2. A simplified version of a real migration from iBGP to eBGP, in a content service provider’s WAN.

Equation not extracted

Although it looks simple, implementing this migration without interrupting live traffic requires careful planning—it took one month for experienced operators at the CSP to make a plan! To illustrate this, we will use uxy+u_{xy}^{+}, uxy−u_{xy}^{-}, and uxymu_{xy}^{m} to denote the addition, removal, and modification of the BGP session between two switches xx and yy, respectively.

The Initial Plan (Incorrect). Since AA (resp. CC) and BB (resp. DD) are backing up each other, operators began with a straightforward plan uAC−,uAD−,uAC+,uBC−,uBD−,uBD+u_{AC}^{-},u_{AD}^{-},u_{AC}^{+},u_{BC}^{-},u_{BD}^{-},u_{BD}^{+}. That is, first remove the two iBGP sessions and add the one eBGP session for device AA (i.e., uAC−,uAD−,uAC+u_{AC}^{-},u_{AD}^{-},u_{AC}^{+}), and then perform similar steps for device BB (i.e., uBC−,uBD−,uBD+u_{BC}^{-},u_{BD}^{-},u_{BD}^{+}). However, they found that even after step uAC+u_{AC}^{+} is executed, rather than choosing the eBGP route from AA as expected, CC kept choosing the iBGP route from BB (due to shorter AS path). This way, CC will forward traffic from DC2DC_{2} to DC1DC_{1} through the long, indirect path through DD and BB (i.e., the solid red arrows in Figure 2(c)), rather than the short, direct path through AA (the dashed red arrows in Figure 2(c)). Since DC2DC_{2} is load-balancing its traffic towards DC1DC_{1} to CC and DD, there is inconsistency among packets sent to CC and DD (i.e., multi-path inconsistency [14]). To avoid the temporary multi-path inconsistency, the operators revise the plan as follows.

The Revised Plan (Still Incorrect). Operators revised the above plan to perform another step utu_{t} after uAC−u_{AC}^{-} and uAD−u_{AD}^{-} (i.e., uAC−,uAD−,ut,uAC+,uBC−,uBD−,uBD+u_{AC}^{-},u_{AD}^{-},u_{t},u_{AC}^{+},u_{BC}^{-},u_{BD}^{-},u_{BD}^{+}). That is, let BB increase the AS path length of routes advertised to CC by configuring an export policy PrependAsPath. This way, after step uAC+u_{AC}^{+} is executed, CC will prefer eBGP routes from AA over the iBGP routes from BB. However, this revision was ad hoc and it only solves the inconsistency after step uAC+u_{AC}^{+}; the long forwarding path still exists after step uAC−u_{AC}^{-} and before step uAC+u_{AC}^{+}. Plans that fundamentally avoid multi-path inconsistency are shown in § 2.4.

Summary. This real scenario shows that manual planning configuration migrations is difficult and error-prone; even experienced operators struggle to plan quickly and correctly.

Diverse Migration Planning Tasks

Figure 3 shows another configuration migration scenario, where the operators want to add a new route reflector. For simplicity, we only consider switches that change their route reflector. Specifically, this migration involves three types of updates: (1) removing the client sessions from C,D,EC,D,E to the old route reflector AA; (2) adding the client sessions from C,D,EC,D,E to the new route reflector BB; and (3) change the session between BB and AA from Client-to-RR to Peer-to-Peer.

Figure 3. Example configuration migration of adding a new route reflector. Unchanged switches (i.e., persistent clients of AA) are omitted.

To ensure safety, the plan should follow the “insert-before-remove” principle [24] (i.e., uXB+u_{XB}^{+} before uXA−u_{XA}^{-}) for each switch to learn at least one route to the external destination. In addition, it should enforce uCA−u_{CA}^{-} after uDA−u_{DA}^{-} to avoid forwarding loops; after adding the new iBGP sessions to BB and receiving routes from it, CC and DD still choose the route from AA as the best route to reach the external destination due to time-based tie-breaking for equal cost routes. If we apply uCA−u_{CA}^{-} before uDA−u_{DA}^{-}, CC will learn routes only from BB and send the packets to BB through DD, while DD still prefers AA and sends packets to it via CC. This will result in a forwarding loop between CC and DD.

There can be multiple plans satisfying safety properties. In this example, there are a total of (8!/4!/2)=7!(8!/4!/2)=7! safe plans. Instead of picking a random one from all safe plans, operators often have operational preferences over them.

For one case, they may want to apply updates switch by switch, and therefore prefer a sequential plan such as (uDB+,uDA−,uCB+,uCA−,uEB+,uEA−)(u_{DB}^{+},u_{DA}^{-},u_{CB}^{+},u_{CA}^{-},u_{EB}^{+},u_{EA}^{-}). Moreover, operators may have some soft constraints that one update should better take place before another, and want to find a plan that is optimal (satisfying as many constraints as possible), or good enough (satisfying ≥3\geq3 soft constraints).

In another case, operators may want the migration process to be finished in shorter time, and therefore prefer a parallel plan, e.g., ([uCB+,uDB+,uEB+],[uDA−,uEA−],[uCA−])( [u_{CB}^{+},u_{DB}^{+},u_{EB}^{+}], [u_{DA}^{-},u_{EA}^{-}], [u_{CA}^{-}] ). Besides being faster, a parallel plan is more flexible: they do not force a total order on independent updates, so that operators can flexibly pick the order of them.

Summary. On top of safety, operators can have various operational intents, and an automated planer should be versatile enough to support those diverse needs. We summarize three different planning intents:

  • Sequential Planning: find a safe sequential migration plan as soon as possible2;

  • Optimal Planning: find a safe sequential migration plan that satisfies as much operational preference as possible;

  • Parallel Planning: find a parallel plan that minimizes the number of plan steps, thus enabling fast migration, which is a must for large-scale network.

Limitations of Existing Work

Existing network migration planners excel at finding any safe sequential plans, but fall short for diverse planning tasks, due to their close bounding of specific search algorithms. Snowcap [43] offers a flexible preference definition language to enable the finding of optimal plans. However, Snowcap adopts a counter-example guided DFS search strategy, which works well for sequential plans but does not scale well when finding optimal plans. The reason is finding optimal plans (as well as parallel plans) require exploring a huge number of states, but the DFS search strategy has a complexity proportional to the number of visited states (see § 7.5). As reported in its paper, the number of states explored to find a local-optimal plan is quadric to the number of updates. Cursor [9] and SafeMigration [10] use dedicated search algorithms to find sequential plans, therefore are not amenable to efficiently support optimal and (or) parallel planning.

The research area of automated planning acknowledges the above issues. Different planning tasks require different search strategies. For sequential plans, the A* algorithm can find optimal plans [19, 23], while weighted A* can offer better scalability if non-optimal but “good enough” plans are acceptable [18, 37]. Further, for parallel planning, satisfiability (SAT) or satisfiability modulo theory (SMT) based methods are a prominent approach, as they compactly encode concurrent action choices and avoid explicit enumeration of parallel action subsets [26, 27, 38]. Therefore, we should instead develop a framework that can be easily customized for different situations with different requirements.

Smoothie Preview

As shown in Figure 1, SMOOTHIE is a configuration migration planning framework which decouples the plan searching and the problem modeling. Specifically, SMOOTHIE firstly symbolically simulates the control plane to obtain a migration problem, specified with a standard language (i.e., PDDL), such that the problem be solved by any off-the-shelf planners supporting that description language. We tested SMOOTHIE on the iBGP to eBGP migration shown in § 2.1. We got a sequential plan (uBC−,uAC−,uAD−,uAC+,uBD−,uBD+)(u^{-}_{BC},u^{-}_{AC},u^{-}_{AD},u^{+}_{AC},u^{-}_{BD},u^{+}_{BD}); and a parallel plan ([uAD−,uBC−],uAC−,uAC+,uBD−,uBD+)([u^{-}_{AD},u^{-}_{BC}],u^{-}_{AC},u^{+}_{AC},u^{-}_{BD},u^{+}_{BD}).

Both plans are safe. SMOOTHIE avoids the multi-path inconsistency by removing uAD−u^{-}_{AD} (resp. uBC−u^{-}_{BC}) before adding uAC+u^{+}_{AC} (resp. uBD+u^{+}_{BD}). Such a principle is more obvious in the parallel plan, as it removes uAD−u^{-}_{AD} and uBC−u^{-}_{BC}, which are the root cause for longer forwarding paths, at the very beginning.

When we showed SMOOTHIE’s plans to the operators, they were surprised how we found them automatically. They also pointed out that our plan would reduce the number of equivalent paths, making DC2DC_2 aware of the route changes during the reconfiguration. However, they still valued our plan much since the number of paths is not as important as the multi-path consistency property. In fact, even after adding a preference to avoid path reduction, SMOOTHIE still returned the same plans, since the added preference is conflicting with the multi-path consistency property.

Automated Planning for Configuration Migration

Preliminaries to Automated Planning

Automated planning aims to find a valid sequence of actions, called a plan, that transitions a system from an initial state to a set of goal states. In this paper, we restrict ourselves to the classical planning problems where the state space are discrete and finite, actions are deterministic, and the system changes only through the execution of actions.

Problem definition (Adapted from [38]). An automated planning problem is defined as a 4-tuple (V,sI,SG,A)(V,s_I,S_G,A), where VV is a set of Boolean state variables and each state ss is a valuation of VV, i.e., an assignment s:V→{0,1}s:V\to\{0,1\}; sIs_I and SGS_G are the initial state and the set of goal states, respectively; and AA is the set of actions which define how a system transitions. Each action a∈Aa\in A is a pair ⟨p,e⟩\langle p,e\rangle, where pp and ee are predicates over VV, called precondition and effect of the action, respectively. That is, an action a=⟨p,e⟩a=\langle p,e\rangle is executable at a state ss if ss satisfies pp, i.e., s⊨ps\models p, and there is a unique successor state s′=exec⟨p,e⟩(s)s'=exec_{\langle p,e\rangle}(s), where s′⊨es'\models e and s′(v)=s(v)s'(v)=s(v) for all vv not occurring in ee. This means that the effects are true in the successor state, and all state variables not affected by the action retain their values.

The Language. Planning Domain Definition Language (PDDL) [2] is a widely adopted language for describing automated planning problems. PDDL divides the model of the planning problem into two major parts: a domain description that defines common elements shared by all problems in a domain, and a problem description that defines the specific planning problem. Listing 1 shows an example PDDL snippet, where the domain block (Lines 1–8) defines predicates (symbolic, boolean-valued functions that describe properties of objects), actions, etc., and the problem block (Lines 10–14) defines objects, the initial state, and the goal states.

Planners. Over decades, many automated planners have emerged. Most planners [13, 16, 22, 47, 48] are designed to find a sequential plan. Some of them [22] excel in finding any valid plan as quickly as possible. Others [16, 47] are good at finding a cost-optimal plan, i.e., a plan with the minimal cost, or a non-optimal but “good enough” plan (e.g., cost ≤10\leq10). A few planners are designed to find parallel plans, but most of them conclude a set of actions can be parallelized as long as at least one total order of them is valid (known as ∃\exists-step parallelism), instead of requiring any order of them to be valid (known as ∀\forall-step parallelism).

(define (domain config-migration)
  (:requirements :strips :typing)
  (:types bit)
  (:predicates (applied ?u - bit))
  (:action apply-update
    :parameters (?u - bit)
    :precondition (and (not (applied ?u)) safe)
    :effect (applied ?u)))

(define (problem instance)
  (:domain config-migration)
  (:objects u1 .. un)
  (:init (not (applied u1)) .. (not (applied un)))
  (:goal (and (applied u1) .. (applied un))))

Listing 1: An example PDDL file for configuration migration. Each uiu_i in Line 12 represents a configuration update; the only action is to apply a given update (i.e., apply-update in Line 5); and safe in Line 7 is a placeholder of the formula representing all safe intermediate states where some updates are applied (i.e., (applied uiu_i)) while others are not (i.e., (not (applied $u_i))).

Automated CMP

We find that the configuration migration planning can be formulated as an automated planning problem, and such a formulation bring a lot of benefits.

Problem Definition. A configuration migration problem with nn updates {u1,…,un}\{u_1,\ldots,u_n\} can be formulated as an automated planning problem (V,sI,SG,A)(V,s_I,S_G,A).

  • V={b1,…,bn}V = \{b_1,\ldots,b_n\} is a set of Boolean variables, where bib_i indicates whether update uiu_i has been applied or not, corresponding to Line 4 in Listing 1.

  • sI=⋀1≤i≤n¬bis_I = \bigwedge_{1\leq i\leq n}\neg b_i is the initial state where no updates are applied, corresponding to Line 13 in Listing 1.

  • SG={⋀1≤i≤nbi}S_G = \{\bigwedge_{1\leq i\leq n} b_i\} is the set of a single goal state where all updates have been applied, corresponding to Line 14 in Listing 1.

  • AA is a set of actions, where an action ⟨pi,ei⟩∈A\langle p_i,e_i\rangle\in A represents the application of update uiu_i: pi=¬bi∧safep_i = \neg b_i \land safe (the current state is safe and uiu_i has not been applied yet; ei=bie_i = b_i (uiu_i is applied after the action. The corresponding semantics are encoded in Lines 5–8 in Listing 1.

Benefits. By modeling the migration planning problem as an automated planning problem with PDDL, we decouple the process of finding a migration plan into two phases: (1) the domain-specific problem modeling phase, which identifies all safety constraints regarding network semantics with a verifier, and (2) the domain-independent plan searching phase, which enables easy plugin of existing AI planners that are optimized for diverse planning objectives (i.e., sequential, optimal, and parallel planning). Moreover, for optimal planning, since PDDL provides a rich set of features, it is also easy to support more kinds of soft constraints. Such as using “temporal constraints” to specify application durations of updates, and call dedicated planners [5, 12, 16, 50] to make plans.

Challenges and Our Approach

Challenge 1: How to identify all safe states in a large space. The specification of safe field in Listing 1 (Line 7) is critical. To meet the need of diverse planning tasks, the safe field should cover all safe states. Specifically, covering all safe states guarantees the completeness of finding a safe plan if one indeed exists, and sufficient information to find optimal plans and shortest parallel plans. Using concrete simulation (e.g., Batfish [14]) is clearly unscalable, when the migration consists of nn updates, we have to run 2n2^n rounds of simulation. Making the simulation incremental (as used by Snowcap [43]) may speed up a single round of simulation, but does not fundamentally solve the problem, since the total time is proportional to the number of simulations (see § 7.5).

Our Approach: Symbolic Simulation. Fortunately, there exists equivalences among all possible intermediate states. For example, when a network migrates from iBGP full mesh to route reflection [8], most iBGP peer sessions in the full mesh carry no route exchange, and the states before and after their removals are equivalent. We can exploit such equivalence for scalable identification of safe states using symbolic simulation [29, 54, 59]. Specifically, we can symbolize the updates as symbolic configuration components, and walk through all states within a single symbolic simulation. Symbolic simulation also enable a shortcut: if it verifies that all or no states satisfy the safety requirements, we can quickly identify that all or no plans are safe (see § 5.1).

Challenge 2: How to find ∀\forall-step parallel plans. We find none of existing planners [7, 25, 27, 38, 39, 40] are suitable for finding parallel configuration migration plans, where a subset of updates can be executed in arbitrary order. Some planners support ∃\exists-step semantics for parallel plans, i.e., they conclude a set of actions can be parallelized when there exists one safe order for these actions. Taking the migration in Figure 3 for example, they will parallelize uCA,uDA,uEAu_{CA},u_{DA},u_{EA} since there exists a safe order (e.g., [uDA,uCA,uEA][u_{DA},u_{CA},u_{EA}]), even though other orderings (e.g., [uCA,uDA,uEA][u_{CA},u_{DA},u_{EA}]) are unsafe. Such ∃\exists-step parallel planners do not meet our needs since we require all orders of updates in the subset should be safe, i.e., ∀\forall-step parallel plans. Other planners can find ∀\forall-step parallel plans; but prior to plan searching, they identify mutually exclusive actions if their preconditions and effects contain overlapping objects [6]. Such a pure syntactical analysis will falsely conclude that all updates cannot be parallelized, while actually they are semantically independent and can be parallelized [1].

Our Approach: ∀\forall-step Parallel Planner Identifying Semantical Independency. Instead of using pure syntactic pre-processing, we semantically encode the ∀\forall-step parallelism with SMT constraints. In particular, we use the bit-vector logic and represent states, e.g., 0000 for the initial state, and 0110 represents the 2nd and 3rd updates have been applied. If all intermediate states, e.g., 0100 and 0010, are safe, then we conclude the 2nd and 3rd updates can be parallel. The above semantics can be easily encoded with bit-vector operations (i.e., bvand). Details are provided in § 6.

Symbolic Simulation

This section introduces the symbolic simulation of SMOOTHIE. The overall process is similar to SRE [59], while we generalize its way to initialize and transfer symbolic routes.

Configuration Symbolization

SMOOTHIE first computes the differences (diff) of the initial and final configurations, to get a set of updates V={u1,…,un}V = \{u_1,\ldots,u_n\}. Each update uiu_i is either ⟨+,ci⟩\langle+,c_i\rangle, ⟨−,ci⟩\langle-,c_i\rangle, or ⟨ci,ci′⟩\langle c_i,c_i'\rangle, indicating configuration component cic_i is inserted (+), removed (-), or modified to ci′c_i', from the initial configuration to the final configuration. For example, the following snippet shows the configuration diff of CC in Figure 3, and the corresponding two updates: (1) uCA=⟨−,iBGPCA⟩u_{CA} = \langle-,iBGP_{CA}\rangle for removing the session between CC and AA; and (2) uCB=⟨+,iBGPCB⟩u_{CB} = \langle+,iBGP_{CB}\rangle for inserting the session between CC and BB.

Then, SMOOTHIE makes the updates and the corresponding configuration components symbolic. For each update uiu_i, we use a boolean variable bib_i to represent whether it is applied (bi=Trueb_i = \mathrm{True}) or not (bi=Falseb_i = \mathrm{False}). Therefore, the existence of configuration component cic_i is symbolic: it exists if the update is an insertion that has been applied, or the update is removal or modification, but the update has not been applied. Figure 4(a) shows the symbolic configuration components for the example in Figure 3. We can see that the iBGP session between CC and AA exists if bCAb_{CA} equals False (the update of removal has not been applied).

Figure 4. Symbolic simulation of SMOOTHIE.

router bgp 64550
- neighbor 192.168.1.0 remote-as 64550
+ neighbor 192.168.2.0 remote-as 64550

Symbolic Route Computation

Symbolic route computation (SRC) propagates symbolic routes and generates symbolic RIBs. For each protocol, the simulation begins with switches initializing routes declared in the configurations (i.e., initialize). Then, switches iteratively exchange routes with their neighbors (i.e., transfer), and select the best routes from all received routes (i.e., merge). The simulation terminates until a fix-point is reached, i.e., the RIBs of switches do not change.

We follow SRE to define a symbolic route as a 2-tuple R=⟨route,cond⟩R = \langle route,cond\rangle, where routeroute is a concrete route for a specific protocol (e.g., OSPF or BGP) specifying the prefix, next hop, and other protocol-specific attributes (e.g., AS Path); and condcond encodes the condition of states where routeroute becomes the best route. Each symbolic RIB consists of all possible routes that can materialize (i.e., become the best route) in certain states.

Initializing Symbolic Routes is to import all routes declared in the symbolic configuration. Different from SRE, where symbolic routes are always initialized with cond=Truecond = True, in SMOOTHIE, the condition of an initialized symbolic route depends on whether the declaration command is symbolic or not. If not, we set cond=Truecond = True; otherwise, we set cond=bucond = b_u or cond=¬bucond = \neg b_u, depending on whether the update uu inserts or removes the declaration command.

Transferring Symbolic Routes refers to transform a symbolic route when it traverses from one switch pp to another switch qq, denoted as a function f^pq\widehat{f}_{pq}. Such transformation includes both route modification and condition refinement, with the route modification determined by protocol semantics and user-defined rules in configurations.

Since configurations are symbolic, we encode the symbolic transformation f^pq\widehat{f}_{pq} as a collection of conditional route modifications, i.e.,

f^pq:={(fpq1,c1),…,(fpqm,cm)}(1)\widehat{f}_{pq} := \{(f_{pq}^{1},c_1),\ldots,(f_{pq}^{m},c_m)\} \tag*{(1)}

where {fpqi}i=1m\{f_{pq}^{i}\}_{i=1}^{m} is the set of all concrete transfer functions that will appear during the migration, and each cic_i is the encoding of all states where fpqif_{pq}^{i} exists, satisfying ⋁i∈[1,m]ci=True\bigvee_{i \in[1,m]} c_i = \mathrm{True}. Correspondingly, applying f^pq\widehat{f}_{pq} on a symbolic route ⟨r,c⟩\langle r,c\rangle is defined as:

f^pq(⟨r,c⟩):={⟨fpq1(r),c∧c1⟩,…,⟨fpqm(r),c∧cm⟩}(2)\widehat{f}_{pq}(\langle r,c\rangle) := \{ \langle f_{pq}^{1}(r),c \land c_1\rangle,\ldots,\langle f_{pq}^{m}(r),c \land c_m\rangle\} \tag*{(2)}

This encoding generalizes SRE’s link-failure model, in which each link either applies a fixed transfer function or drops all routes, depending on its up/down state.

SMOOTHIE currently considers symbolic OSPF link cost, BGP session, and routing policy. Specifically, if there is an update u=⟨w,w′⟩u = \langle w,w'\rangle that changes the OSPF link cost between p,qp,q from ww to w′w', we have

f^pq={(fpqw,¬bu),(fpqw′,bu)}(3)\widehat{f}_{pq} = \{(f_{pq}^{w},\neg b_u),(f_{pq}^{w'},b_u)\} \tag*{(3)}

where fpqwf_{pq}^{w} (resp. fpqw′f_{pq}^{w'}) increases the route cost by ww (resp. w′w'); if there is an update u=⟨+,sessionpq⟩u = \langle+,session_{pq}\rangle that inserts a BGP session between pp and qq, we have

f^pq={(fpq,bu),(f∞,¬bu)}≡{(fpq,bu)},(4)\widehat{f}_{pq} = \{(f_{pq},b_u),(f_{\infty},\neg b_u)\} \equiv\{(f_{pq},b_u)\}, \tag*{(4)}

where f∞f_{\infty} denies all routes. It encodes the fact that the route propagation from pp to qq happens only after the session between them has established. For example, in Figure 4(b), CC will receive a route for 128/1 from EE after EE and CC both become clients of BB (i.e., bEBbCBb_{EB}b_{CB}). We handle the removal of BGP sessions, and the modification and insertion/removal of a route policy similarly.

Merging Symbolic Routes happens when a switch learns multiple routes for the same prefix. This step is the same as SRE: we rank these symbolic routes according to their priorities and update their conditions by negating the conditions of all higher-priority symbolic routes. For example, in Figure 4(b), CC receives two routes from AA and EE, where the route from AA has higher priority due to lower IGP cost. Then, the condition of the route from EE is updated to bEBbCB∧¬(¬bCA)=bEBbCBbCAb_{EB}b_{CB} \land\neg(\neg b_{CA}) = b_{EB}b_{CB}b_{CA}, meaning that only after uEB+,uCB+,uCA−u^{+}_{EB},u^{+}_{CB},u^{-}_{CA} are applied, it will become the best route.

Symbolic Packet Forwarding

Symbolic Packet and PEC. Let 2IP2^{IP} and 2V2^{V} be the universe set of all packet headers and configuration states, respectively. A symbolic packet is a 3-tuple Pkt=⟨H,L,status⟩Pkt = \langle H,L,status\rangle, where H⊆2IP×2VH \subseteq2^{IP} \times2^{V} is a set of header-state pairs (called symbolic header), LL is the forwarding path, and the forwarding status is either FLY, ARRIVE, LOOP, or DROP. Essentially, a symbolic packet represents a set of concrete packets, which, under specific states, will traverse nodes in LL, and have a certain status at the last hop in LL. Each symbolic packet not FLYing is a packet equivalence class (PEC).

Symbolic packet forwarding (SPF) propagates symbolic packets throughout the network to compute a set of PECs for each switch, in the same way as SRE [59]. Figure 4(b) shows the process for the example in Figure 3. When the symbolic packet reaches node CC, a loop is detected, whose condition is bEBbCBbCA¬bDAb_{EB}b_{CB}b_{CA}\neg b_{DA}.

PDDL Generation

The snippet in Listing 1 is a template for all configuration migrations. To generate PDDL for a specific migration scenario, we only need to fill in the scenario-specific safety and preference constraints in the domain file. It’s worth mentioning that, while we focus on showing how to encode common constraints below, users are free to manipulate the generated PDDL file.

Encoding Safety Constraints

Safety constraints are a set of conditions on update states (whether each update is applied or not), under which a network satisfies a set of properties. We term such conditions as update conditions. For instance, to maintain the reachability property that all switches should reach the external prefix during the migration in §2, plans should let the network traverse only update state satisfying the condition:

(¬bCA∨bCB)∧(¬bDA∨bDB)∧¬(bEBbCBbCA¬bDA)(5)(\neg b_{CA} \lor b_{CB}) \land(\neg b_{DA} \lor b_{DB}) \land\neg(b_{EB}b_{CB}b_{CA}\neg b_{DA}) \tag*{(5)}

where the first and second clauses represent states where CC and DD learn at least one route for the external prefix, respectively; and the third clause encodes the states without forwarding loop. Other switches, i.e., A,B,EA,B,E will always learn the external prefix, thus relative variables (e.g., bABb_{AB}) do not show up in Equation (5).

In the following, we show how to compute update conditions for different properties. We denote properties as Prop⁡(sw,p,c)\operatorname{Prop}(sw,p,c), where swsw is the source switch, pp is the destination address, and cc represents constraints on route attributes or packet forwarding paths.

Routing (Control Plane) Property. A routing property Prop⁡(sw,p,c)\operatorname{Prop}(sw,p,c) specifies that swsw should learn a route for prefix pp and the route attributes should satisfy a constraint cc. Specifically, we denote Prop⁡(sw,p,True)\operatorname{Prop}(sw,p,\mathrm{True}) as CpReach⁡(sw,p)\operatorname{CpReach}(sw,p). The update condition for a routing property is computed as ⋁R∈RR.cond\bigvee_{R\in\mathcal{R}} R.cond, where

R={R∣R∈sw.RIB∧R.route.prefix=p∧R.route⊨c}.(6)\mathcal{R} = \{R \mid R \in sw.RIB \land R.route.prefix = p \land R.route \models c\}. \tag*{(6)}

Forwarding (Data Plane) Property. A forwarding property Prop⁡(sw,p,c)\operatorname{Prop}(sw,p,c) specifies that a packet sent from swsw to destination pp should traverse specific paths and/or have a specific final status encoded in cc. Specifically, we refer to Prop⁡(sw,p,status=ARRIVE)\operatorname{Prop}(sw,p,status = \mathrm{ARRIVE}) as DpReach⁡(sw,p)\operatorname{DpReach}(sw,p); and the

(define (domain config-migration)
  (:predicates (applied ?u - bit) (violated))

  (:action apply-update
    :parameters (?u - bit)
    :precondition (and (not (applied ?u)) safe
      (not (violated)))
    :effect (and (applied ?u)
      (when (and (= ?u ui) (applied uj))
        (violated))))

  (:action pay-penalty
    :parameters ()
    :precondition (violated)
    :effect (and (not (violated))
      (increase (total-cost) 100))))

(define (problem instance)
  (:metric minimize (total-cost)))

Listing 2: Encode preference in PDDL. safe in Line 6 is a placeholder.

negation of Prop⁡(sw,p,status=LOOP⁡)\operatorname{Prop}(sw,p,status=\operatorname{LOOP}) as LoopFree⁡(sw,p)\operatorname{LoopFree}(sw,p). The update condition for a forwarding property is computed as ⋁pec∈ECond⁡(pec.H∧p)\bigvee_{pec\in\mathcal{E}}\operatorname{Cond}(pec.H\land p), where

E={pec∣pec∈sw.PECs⁡∧pec.L⊨c∧pec.status⊨c}.(7)\mathcal{E}=\{pec\mid pec\in sw.\operatorname{PECs}\land pec.L\models c\land pec.status\models c\}. \tag*{(7)}

and (pec.H∧p)(pec.H\land p) is a Boolean formula that consists of both IP address variables and update variables, Cond⁡()\operatorname{Cond}() is to extract the condition from that formula. For example, Cond⁡(p1)=True⁡\operatorname{Cond}(p_1)=\operatorname{True}, Cond⁡(p1b1¬b2)=b1¬b2\operatorname{Cond}(p_1b_1\neg b_2)=b_1\neg b_2.

Multi-path Consistency specifies that all packets from swsw to pp, if forwarded through multiple paths, have the same final status. We first check DpReach⁡(sw,p)\operatorname{DpReach}(sw,p) and Prop⁡(sw,p,status∈{LOOP⁡,DROP⁡})\operatorname{Prop}(sw,p,status\in\{\operatorname{LOOP},\operatorname{DROP}\}), to get the condition when the destination is reached (cond1cond_1) or isolated (cond2cond_2), respectively. Then, we compute the update condition as cond1∧¬cond2cond_1\land\neg cond_2.

More generally, we can also check the condition when all reachable paths have the same length, as required in the example in §2.1; or even the condition when all reachable paths should traverse the firewall.

Since safety constraints should always be satisfied during updates, in PDDL we encode them into the precondition field of the apply-update action (e.g., Line 7 of Listing 1). This will block further expansion of a plan and force backtracing, when an unsafe state is visited.

It is worth mentioning that if the Boolean constraint for safe states is True or False, we can directly identify that any or none plan is safe, respectively, without generating PDDL and calling the planners. Even if the Boolean constraint is not True or False, it will consists of much fewer update variables than the total number of updates when most updates have no impact on safety (see §7). Accordingly, we call planners to plan only the updates that impact safety.

Encoding Preferences

Preference constraints are soft constraints. Their violation does not impact migration safety, but plans that satisfy more soft constraints are preferred. Therefore, when a soft constraint is violated, instead of blocking a plan to expand, we increase the “cost” of the plan. This way, the plan with the minimal cost is the plan that satisfies the most soft constraints.

Currently, we support encoding precedence preferences, i.e., preferring plans where one update uiu_i is applied before another update uju_j. Inspired by [35, 55], we use conditional-effect to encode it in PDDL, as shown in Listing 2 (identical lines of Listing 1 omitted for brevity). In detail, we first define a predicate violated to flag preference violation (Line 2), and then define conditional effect (Lines 9 - 10), which encodes that the preference is violated if the current update is uiu_i, and uju_j is already applied. If violated, the plan is blocked from expanding (Line 7) unless the penalty for preference violation is paid (Lines 12 - 16). Finally, we inform the planner to find the plan with the minimal cost (Line 19). If there are multiple such preferences, we encode their disjunction in Line 9.

Optimizations

For configuration migration, a common safety requirement is to maintain global (all switches’) reachability to specific destinations. However, we found that a direct computation of global reachability conditions using Equation (8) leads to a huge safe constraints, making plan searching untractable.

To reduce the size of constraints, we introduce an optimization termed safety constraint simplification. This optimization converts the global reachability property for a prefix pp into an equivalent one, i.e., control plane reachability plus data plane loop freedom. Formally, instead of computing:

⋀n1∈NDpReach⁡(n1)(8)\bigwedge_{n_1\in\mathcal{N}}\operatorname{DpReach}(n_1) \tag*{(8)}

where N\mathcal{N} is the set of all switches, we compute:

(⋀n1∈NCpReach⁡(n1))∧(⋀n1∈Loops⁡LoopFree⁡(n1))(9)\left(\bigwedge_{n_1\in\mathcal{N}}\operatorname{CpReach}(n_1)\right)\land\left(\bigwedge_{n_1\in\mathcal{L}_{\operatorname{oops}}}\operatorname{LoopFree}(n_1)\right) \tag*{(9)}

If no data plane packet filtering or rewriting configuration (e.g., ACL, NAT) exists, these two formulas are equivalent since the DP reachability of n1n_1, i.e., DpReach⁡(n1)\operatorname{DpReach}(n_1), depends recursively on the DP reachability of its next-hops:

DpReach⁡(n1)↔⋁(n1,n2)∈E(CpReach⁡(n1,n2)∧DpReach⁡(n2)∧¬DpReach⁡(n2,n1))(10)\operatorname{DpReach}(n_1)\leftrightarrow\bigvee_{(n_1,n_2)\in E}\left(\operatorname{CpReach}(n_1,n_2)\land\operatorname{DpReach}(n_2)\land\neg\operatorname{DpReach}(n_2,n_1)\right) \tag*{(10)}

where EE is the link set of the network, CpReach⁡(n1,n2)\operatorname{CpReach}(n_1,n_2) represents n1n_1 selects n2n_2 as its next-hop, and DpReach⁡(n1,n2)\operatorname{DpReach}(n_1,n_2) represents n2n_2’s data plane reachability via forwarding paths that traverses n1n_1. Specifically, the negation of DpReach⁡(n1,n2)\operatorname{DpReach}(n_1,n_2) prevents forwarding loops, which is a detailed counterpart of the loop freedom encoding in Equation (9).

While equivalent, Equation (8) usually results in more complicated formulas than Equation (9), which will impede planners like FastDownward. Using Equation (9) directly frees SMOOTHIE from minimizing the formulas.

Plan Searching

After obtaining the PDDL, we can invoke off-the-shelf planners based on operators’ intent. Specifically, we can use FastDownward [21] to find a sequential plan as soon as possible; if some soft constraints are appointed, we can use planners like ENHSP [41] to find the sequential plan that satisfies the most soft constraints. Since no existing planners can find ∀\forall-step parallel plan for our problem, we customize our own planner based on SMT.

Customized SMT-based Planner. Suppose there are nn updates, our planner finds the shortest plan by checking whether there exists a kk-step plan for an increasing kk (1≤k≤n1 \le k \le n). For each kk, we convert the problem of searching a kk-step plan into a set of SMT constraints:

I(s0)∧trans⁡(s0,s1)∧⋯∧trans⁡(sk−1,sk)∧G(sk),(11)I(s_0) \land\operatorname{trans}(s_0,s_1) \land\cdots\land\operatorname{trans}(s_{k-1},s_k) \land G(s_k), \tag*{(11)}

where sis_i represents the state after ii steps, I(s0)I(s_0) and G(sk)G(s_k) constraints s0s_0 and sks_k to be the initial and goal state, respectively; trans⁡(si,si+1)\operatorname{trans}(s_i,s_{i+1}) (i∈[0,k−1]i \in[0,k-1]) constraints the transition between states.

We represent states with bit-vectors of length nn, with the iith position represents whether the iith update has been applied. sjs_j is said to be a successor of sis_i, denoted as si≺sjs_i \prec s_j, if all updates that have been applied in state sis_i, have also been applied in state sjs_j, i.e.,

si≺sj:=(bvand⁡(si,sj)=si)∧(si≠sj).(12)s_i \prec s_j := (\operatorname{bvand}(s_i,s_j) = s_i) \land(s_i \ne s_j). \tag*{(12)}

Then, a state s′s' is said to be an intermediate state of sis_i and sjs_j if and only if si≺s′≺sjs_i \prec s' \prec s_j.

Under ∀\forall-step parallelism semantics, the updates corresponding to bits that change from 0 in sis_i to 1 in si+1s_{i+1} must be safely executable in any order. Equivalently, every intermediate state between sis_i and sjs_j must be safe:

parallel⁡(si,si+1):=∀si≺s≺si+1safe⁡(s),(13)\operatorname{parallel}(s_i,s_{i+1}) := \forall_{s_i \prec s \prec s_{i+1}} \operatorname{safe}(s), \tag*{(13)}

Finally, the trans⁡\operatorname{trans} constraints is encoded as:

trans⁡(si,sj):=(si≺sj)∧parallel⁡(si,sj).(14)\operatorname{trans}(s_i,s_j) := (s_i \prec s_j) \land\operatorname{parallel}(s_i,s_j). \tag*{(14)}

Evaluation

Our evaluation aims to answer the following questions: (Q1) Can SMOOTHIE find high quality plans? (Q2) How SMOOTHIE perform on different planning tasks? (Q3) How SMOOTHIE compares to state-of-the-art planners? (Q4) Can symbolic simulation scale?

Implementation and Setup. We implemented a prototype of SMOOTHIE with around 25k lines of Java code. For the symbolic simulator of SMOOTHIE, we use BDD, specifically the JDD library [49], to encode Boolean formulas and operations. For the planning backend, we use FastDownward [21], ENHSP [41], and our parallel planner (§6) with Z3 [34] to find sequential and parallel plans, respectively. All evaluations are executed on a Linux server with two 16-core Intel Xeon CPUs @ 2.90GHz and 256G RAM.

Migration Scenarios

We use 87 topologies from Topology Zoo [28]. The topologies have 5–82 switches (avg. 33), and 4–96 edges (avg. 39). For each topology, we configure (i) OSPF with uniform link cost; (ii) iBGP route reflection, where the switch with the maximum edge degree is the route reflector; and (iii) all external switches to announce the same prefix.

We consider 5 synthetic migration scenarios. Except RRx2, all of them are from Snowcap [43]. The first three of the five scenarios are inspired by real-world migrations, while the last two are mainly for benchmarking. For all scenarios, we consider global reachability (§5) as the safety requirement, i.e., every internal switch can reach the external prefix.

(1) RRx2 adds a new route reflector. We randomly partition the network into two regions that are balanced in the number of switches using METIS [33]. For the region that does not contain the original reflector RR1RR_1, we select a new reflector RR2RR_2. For each switch other than RR2RR_2 in the second region, we delete its session to RR1RR_1, and add a new session to RR2RR_2. Thus, there are O(n)O(n) updates for a network with nn switches.

(2) FM2RR transforms from iBGP full mesh into route reflection. For a topology with nn switches, there are O(n2)O(n^2) updates, with removing O(n2)O(n^2) iBGP sessions from the full mesh, and adding O(n)O(n) reflector-client sessions.

(3) NetAcq merges two networks, a newly acquired network and an existing network, into a single one. During the migration, we adjust the OSPF cost of one network to the same value with the other, and configure the route reflectors of the two networks to set up an iBGP peer-to-peer session. The number of updates is also proportional to the number of edges in the topology. Only 62 topologies are eligible for this scenario since it requires one external switch for each network.

(4) IGPx2 doubles the OSPF cost for each link in the network. There are mm updates for a topology with mm edges.

(5) LPx2 doubles the local preference for each external neighbor of the network. If the network has pp external neighbors, then there will be pp updates.

For all following figures using “Instance ID” as xtics, the topologies are sorted by increasing number of updates.

Plan Qualities

We show qualities of the plans found by SMOOTHIE.

Overall Statistics. As shown in Table 1, for 42 (2) FM2RR (RRx2) instances, and all instances of the other three scenarios, symbolic simulation concludes that all intermediate states satisfy the global reachability, i.e., all plans are safe, and there is no need to call a planner. In the following, we show details about the instances that really need to call a planner.

RRx2FM2RRNetAcqIGPx2LPx2
#total8287628787
#all-safe242628787

Table 1. Statistics for the five migration scenarios. #total means the total number of instances; #all-safe means the number of instances that symbolic simulation result indicates all intermediate states are safe.

Sequential Plans. Figure 5 shows the number of updates and sequential steps for each instance that needs planning. For FM2RR, the sequential plans have up to 2 magnitudes fewer steps than updates. This is because most updates are removing iBGP peer sessions that have no impact on safety: the end switches of such sessions only receive iBGP routes from the border switches that peer with external neighbors, or from the route reflector; therefore, they do not exchange routes with each other upon such sessions. On the contrary, for most RRx2 instances, the number of steps is roughly the same as the number of updates, since most updates will impact safety. Moreover, except for 5 timeouts, ENHSP successfully finds the optimal plan for all other instances.

Figure 5. Number of updates and sequential plan steps for FM2RR and RRx2 instances.

Parallel Plans. Figure 6 shows the number of updates and parallel plan steps for each instance. For all non-timeout instances, the shortest parallel plan contains only ≤3\le3 steps! Compressing hundreds or thousands of updates into O(10)O(10)-step parallel plans enables fast migration, which is a big win for highly automated production networks [36]. However, chances are certain migrations may be too complicated for the parallel planner to find the shortest parallel plan, as indicated by the timeouts. When that happens, we can trade off the plan length and try again, or fall back on using the more scalable sequential planners.

Number of updates and parallel plan steps for FM2RR and RRx2 instances

Figure 6. Number of updates and parallel plan steps for FM2RR and RRx2 instances.

Example. Figure 7 illustrates applying FM2RR on GtsPoland, whose shortest parallel plan has three steps. In the initial full mesh state, packets to the external prefix flows alone n2→n3→n4→n5n_2 \to n_3 \to n_4 \to n_5. During the migration to the route reflection state, removing the iBGP session between n4n_4 and n5n_5 (i.e., u45u_{45}) before removing the one between n3n_3 and n5n_5 (i.e., u35u_{35}) will cause forwarding loop between n3n_3 and n4n_4, as shown in Figure 7(b). Therefore, a safe plan should apply u35u_{35} before u45u_{45}. Similarly, u25u_{25} (resp. u57u_{57}) should be applied before u35u_{35} (resp. u58u_{58}); For this instance, Snowcap outputs a sequential plan (…,u25,…,u35,…,u57,…,u45,…,u58,…)(\ldots,u_{25},\ldots,u_{35},\ldots,u_{57},\ldots,u_{45},\ldots,u_{58},\ldots). Even though safe, it is too concrete to reveal the fact that “updates other than u25,u35,u45,u57,u58u_{25},u_{35},u_{45},u_{57},u_{58} do no impact safety, and can be randomly ordered”. In contrast, SMOOTHIE outputs a sequential plan (u25,u35,u57,u45,u58)(u_{25},u_{35},u_{57},u_{45},u_{58}), or a parallel plan (u25),(u35,u57),(u45,u58)(u_{25}), (u_{35},u_{57}), (u_{45},u_{58}), indicating that the order of all other updates does not matter.

The initial and unsafe states when applying FM2RR on GtsPoland

Figure 7. The initial and unsafe states when applying FM2RR on GtsPoland, with Node 1 as the route reflector. Irrelevant nodes, iBGP sessions, and traffic are removed for simplicity.

Performance on Different Tasks

This section evaluates how SMOOTHIE performs on different planning tasks, when equipped with different planners.

Sequential Planning. Figure 8(a) shows the results for finding sequential plans using all three planners. In general, FastDownward is extremely scalable, finishes in less than one second for all instances; ENHSP is also scalable, completing within 100 seconds in most instances; while the SMT planner has the worst scalability, taking around 1000 seconds, or even runs out of time, on some complex instances.

Figure 8. The searching time when using different planners for three types of planning tasks.

Optimal Planning. Figure 8(b) shows the results for appointing a random precedence preference and uses ENHSP to find the optimal plan, which is the only planner that supports such planning tasks. Compared to sequential planning, ENHSP is slightly slower for optimal planning; but it still completes the search on most instances within 100 seconds.

Parallel Planning. Figure 8(c) shows the results for finding parallel plans using our SMT-based planner, the only planner that supports parallel planning. Our planner can find the shortest parallel plan in less than 1 minute, except for running out of time on 7 FM2RR instances. Interestingly, for around 45% of all instances, our planner is more efficient to find parallel plans than sequential plans. This is mainly because finding sequential plans requires unrolling trans in Equation (11) nn times (where nn is the number of updates), making the resulting SMT constraint too large to be solved efficiently.

In sum, the results show that different planners excel on different planning tasks, no single planning strategy suites all operational requirements. This indicates a decoupled planning framework is necessary for support diverse planning tasks.

Comparison with SOTA

This section compares SMOOTHIE with Snowcap [42], the state-of-the-art configuration migration planner. We compare their time to find any sequential plan.

As shown in Figure 9, Snowcap is extremely fast. It takes less than 0.1s for all instances, while SMOOTHIE uses O(10)O(10)s for FM2RR and LPx2, and O(103)O(10^{3})s for NetAcq. These results are expected for two reasons. Firstly, the open-source implementation of Snowcap is overly simple, with no or limited support for many protocol features including longest-prefix matching, ECMP, route aggregation, etc. Also, it restricts eBGP sessions to be established with external peers. As a result, Snowcap finishes a round of simulation in

Figure 9. End-to-end time to find any safe sequential plan using Snowcap (native), Snowcap (Batfish), SMOOTHIE, and SMOOTHIE (grouped).

sub-milliseconds, order-or-magnitude faster than Batfish and SMOOTHIE (seconds).

Second, the synthetic migration scenarios are so simple that for most cases Snowcap can find a safe plan without backtracking. On the contrary, SMOOTHIE targets at supporting diverse planning tasks, so it is necessary to explore all intermediate states with symbolic simulation. The cost pays off when finding optimal or parallel plans but can be an overkill for sequential plans.

To validate the above hypotheses, we modified Batfish to support incremental simulation for a limited set of configuration changes (IGP link weight change, remove or addition of BGP sessions, routing policy modifications), and replay the search traces of Snowcap using the modified Batfish. As shown in Figure 9, using Batfish as the simulator, Snowcap’s planning time significantly increases, and slower than SMOOTHIE for most of the cases. Results for RRx2 and IGPx2 are similar and shown in Appendix § 11. This confirms our previous hypothesis why Snowcap is so fast.

For SMOOTHIE, NetAcq is substantially harder than FM2RR and LPx2. In detail, its widespread OSPF weight modifications limit equivalence among intermediate states, and the number of route computed by SMOOTHIE grows exponentially with the number of updates. For instances exceeding 100 seconds, we randomly partition the updates into three groups and simulate each separately, and label them as SMOOTHIE (grouped). Grouping substantially reduces run-time: in some instances, even two-group partition reduces simulation time from O(103)O(10^{3}) to O(10)O(10) seconds.

Scalability of Symbolic Simulation

This section studies how well symbolic simulation scales to a large space of intermediate states, compared to incremental simulation as adopted in [43].

We use a metric called compression ratio, defined as (Tinit×Nstates)/Ttotal(T_{init} \times N_{states})/T_{total}, where TinitT_{init} is the time to simulate the initial configuration, NstatesN_{states} is the number of states explored, and TtotalT_{total} is the total simulation time. The compression ratio reflects how effectively a simulator can exploit equivalence in the state space. For incremental simulation, NstatesN_{states} counts the states visited during the DFS traversal and backtracking; while for symbolic simulation, Nstates=2NupdatesN_{\mathrm{states}} = 2^{N_{\mathrm{updates}}}, since all intermediate states are simulated symbolically in a single execution. When grouping is applied, NstatesN_{\mathrm{states}} is the sum of the states explored across all groups.

Figure 10 shows the results. The compression ratio of incremental simulation, either Snowcap (native) or (Batfish), is generally under 10. This indicates that incremental simulation exploits only a limited number equivalent states, and the total simulation time is proportional to the number of states explored. In contrast, SMOOTHIE achieves higher compression ratio on larger state spaces, given that the instances are sorted by increasing number of updates. Moreover, SMOOTHIE achieves higher compression ratio on FM2RR than on NetAcq and LPx2, since the state space of FM2RR is larger while having greater equivalence. The dramatic drops of compression ratios in Figure 10(b) are caused by grouping. Similar results for RRx2 and IGPx2 are shown in Appendix § 11.

Figure 10. Compression ratio to full simulation of all explored states using incremental simulation (Snowcap (native) and Batfish) and symbolic simulation (SMOOTHIE).

Related Work

Many prior works have studied network migrations in different contexts. We summarize them here and outline their relationship to our work.

Configuration Migration in the traditional networks (non-SDN) coarsely has two main branches of research. Some works, e.g., [3, 24], require routers to run both the initial and final configurations in parallel. Coexisting configurations result in coexisting data planes. This way, they gradually instruct switches to forward traffic according to the final data plane in an order that avoids forwarding loops [52, 53]. Despite being useful, the overhead and device support needed by control and data plane duplication on switches impede their deployment.

Other research [9, 10, 11, 15, 43] directly finds a progressive deployment plan for configuration updates, ensuring that the network maintains correct routing and/or forwarding behaviors after each step. Compared to the above research, it does not require special support from routers. However, as mentioned earlier, unlike SMOOTHIE, these works are limited in their support for diverse operational intents.

Physical Infrastructure Migration refers to adding, removing, or swapping switches and links. This requires maintaining bandwidth headroom to ensure the network can handle traffic demands. SOTA tools [60, 61] automate the physical transitions using different searching strategies on top of different traffic models. We’ll investigate whether SMOOTHIE can capture the safety constraints and diverse intents of physical infrastructure migration in the future.

Discussion

Use temporary updates to expand the envelope of safe plans. Sometimes, no safe plan exists if we are limited to updates that results from the difference between the initial and final configurations. Consider a variant of the example in § 2.1: suppose instead of receiving DC1DC1’s BGP routes from routers CC and DD, DC2DC2 is configured with two equal-cost default static routes (i.e., 0.0.0.0/00.0.0.0/0) towards CC and DD. Regardless of what migration plan we take, DC2DC2 will always distribute its traffic towards DC1DC1 to CC and DD evenly. In such cases, we have to temporarily remove the static routes to meet the forwarding requirements. Temporary removal of static routes is already supported by SMOOTHIE, but we need to add support for a broader range of temporary updates and automatically determine which ones are needed to devise a safe plan.

Support for convergence behavior. Our symbolic simulation models the converged state of the network after applying updates, rather than transient behavior during convergence. Complementary techniques, such as Chameleon [44] for BGP and [15] for IGP, decompose individual updates into smaller steps to preserve specified safety properties during convergence. To make a plan that ensures safety both during and after re-convergence, we can first use SMOOTHIE to order all updates, then use [44] and [15] to manage the safe execution of each update. Like other control plane analysis tools [4, 14, 59], if the network converges nondeterministically [17], SMOOTHIE will consider safety for only one of them.

Use LLM for configuration migration planning. While planning directly from raw configurations requires an agentic system, our decoupled framework readily accommodates an LLM as a backend planner. Preliminary experiments with ChatGPT-5.6 Sol using PDDL inputs show high first-attempt accuracy for sequential planning, but optimal and parallel planning often require more attempts and provide no guarantee of finding an optimal or shortest plan. Much of this success reflects the simplicity of the synthetic cases, where the model’s stated “insert-before-remove” strategy often suffices. Experiments with natural-language migration descriptions and planning objectives further show that precomputed safety information improves accuracy and reduces time and token usage. These preliminary results suggest that further research is needed to assess the practical value and reliability of LLMs for configuration migration planning.

Conclusion

SMOOTHIE is a versatile configuration migration planner that supports diverse network designs and operational preferences and can also find safe parallel plans. It achieves that by decoupling how safety constraints and preferences are encoded and how a viable plan is searched. Our experiments demonstrate that SMOOTHIE performs well, finding sequential plans for most cases within 1 hour while compressing large migrations into no more than 3 parallel steps.

Additional Evaluation Results

Figure 11 and Figure 12 show the additional results on RRx2 and IGPx2 for evaluations introduced in § 7.4 and § 7.5, respectively.

Figure 11. End-to-end time to find any safe sequential plan for RRx2 and IGPx2 instances using Snowcap, Batfish, and SMOOTHIE. For instances where SMOOTHIE does not finish in 100 seconds, we randomly divide all updates into 3 groups and separately simulate each group. Such instances are tagged as SMOOTHIE (grouped).

Figure 12. Compression ratio (Tinit×Nstates/TtotalT_{init} \times N_{states}/T_{total}) of incremental simulation (Snowcap and Batfish) and symbolic simulation (SMOOTHIE) for RRx2 and IGPx2 instances, compared to full simulation of all considered intermediate states.

References

  1. [1]Mohammad Abdulaziz and Friedrich Kurz. Formally verified sat-based ai planning. In Proceedings of the AAAI Conference on Artificial Intelligence, volume 37, pages 14665–14673, 2023.arxiv.org/abs/2010.14648
  2. [2]Constructions Aeronautiques, Adele Howe, Craig Knoblock, ISI Drew McDermott, Ashwin Ram, Manuela Veloso, Daniel Weld, David Wilkins Sri, Anthony Barrett, Dave Christianson, et al. Pddl—the planning domain definition language. Technical Report, Tech. Rep., 1998.
  3. [3]Richard Alimi, Ye Wang, and Y. Richard Yang. Shadow configuration as a network management primitive. In Proceedings of the ACM SIGCOMM 2008 Conference on Data Communication, SIGCOMM ’08, page 111–122, New York, NY, USA, 2008. Association for Computing Machinery.
  4. [4]Ryan Beckett, Aarti Gupta, Ratul Mahajan, and David Walker. A general approach to network configuration verification. In Proceedings of the Conference of the ACM Special Interest Group on Data Communication, SIGCOMM ’17, page 155–168, New York, NY, USA, 2017. Association for Computing Machinery.
  5. [5]Arthur Bit-Monnot. Experimenting with lifted plan-space planning as scheduling: Aries in the 2023 ipc. In 2023 International Planning Competition at the 33rd International Conference on Automated Planning and Scheduling, 2023.
  6. [6]Avrim L Blum and Merrick L Furst. Fast planning through planning graph analysis. Artificial intelligence, 90(1-2):281–300, 1997.
  7. [7]Michael Cashmore, Daniele Magazzeni, and Parisa Zehtabi. Planning for hybrid systems via satisfiability modulo theories. Journal of Artificial Intelligence Research, 67:235–283, 2020.DOI
  8. [8]Enke Chen, Tony J. Bates, and Ravi Chandra. BGP Route Reflection: An Alternative to Full Mesh Internal BGP (IBGP). RFC 4456, April 2006.DOI
  9. [9]Zibin Chen and Lixin Gao. Cursor: Configuration update synthesis using order rules. In IEEE INFOCOM 2023 - IEEE Conference on Computer Communications, pages 1–10, 2023.DOI
  10. [10]Zibin Chen, Lixin Gao, and Ying Zhang. Safemigration: Safe large-scale migration planning via symbolic execution. In Proceedings of the 2nd Workshop on Formal Methods Aided Network Operation, pages 37–42, 2025.DOI
  11. [11]Francois Clad, Stefano Vissicchio, Pascal Mérindol, Pierre Francois, and Jean-Jacques Pansiot. Computing minimal update sequences for graceful router-wide reconfigurations. IEEE/ACM Transactions on Networking, 23(5):1373–1386, 2014.DOI
  12. [12]Amanda Coles, Andrew Coles, Maria Fox, and Derek Long. Forward-chaining partial-order planning. In Proceedings of the International Conference on Automated Planning and Scheduling, volume 20, pages 42–49, 2010.DOI
  13. [13]Stefan Edelkamp and Malte Helmert. Mips: The model-checking integrated planning system. AI magazine, 22(3):67–67, 2001.
  14. [14]Ari Fogel, Stanley Fung, Luis Pedrosa, Meg Walraed-Sullivan, Ramesh Govindan, Ratul Mahajan, and Todd Millstein. A general approach to network configuration analysis. In 12th USENIX Symposium on Networked Systems Design and Implementation (NSDI 15), pages 469–483. USENIX Association, 2015.
  15. [15]Pierre Francois, Mike Shand, and Olivier Bonaventure. Disruption free topology reconfiguration in ospf networks. In IEEE INFOCOM 2007-26th IEEE International Conference on Computer Communications, pages 89–97. IEEE, 2007.
  16. [16]Alfonso Gerevini, Ivan Serina, et al. Lpg: A planner based on local search for planning graphs with action costs. In Aips, volume 2, page 281–290, 2002.
  17. [17]Tim A. Griffin and Geoff Huston. BGP Wedgies. RFC 4264, November 2005.DOI
  18. [18]Eric A Hansen and Rong Zhou. Anytime heuristic search. Journal of Artificial Intelligence Research, 28:267–297, 2007.DOI
  19. [19]Peter E Hart, Nils J Nilsson, and Bertram Raphael. A formal basis for the heuristic determination of minimum cost paths. IEEE transactions on Systems Science and Cybernetics, 4(2):100–107, 1968.DOI
  20. [20]Patrik Haslum, Nir Lipovetzky, Daniele Magazzeni, Christian Muise, Ronald Brachman, Francesca Rossi, and Peter Stone. An introduction to the planning domain definition language, volume 13. Springer, 2019.DOI
  21. [21]Malte Helmert. Fast Downward. https://www.fast-downward.org/latest/.
  22. [22]Malte Helmert. The fast downward planning system. Journal of Artificial Intelligence Research, 26:191–246, 2006.
  23. [23]Malte Helmert and Carmel Domshlak. Landmarks, critical paths and abstractions: what’s the difference anyway? In Proceedings of the international conference on automated planning and scheduling, volume 19, pages 162–169, 2009.
  24. [24]Gonzalo Gomez Herrero and Jan Antón Bernal Van der Ven. Network Mergers and Migrations: Junos Design and Implementation. John Wiley & Sons, 2011.DOI
  25. [25]Daniel Höller and Gregor Behnke. Encoding lifted classical planning in propositional logic. In Proceedings of the International Conference on Automated Planning and Scheduling, volume 32, pages 134–144, 2022.DOI
  26. [26]Henry Kautz and Bart Selman. Pushing the envelope: Planning, propositional logic, and stochastic search. In Proceedings of the national conference on artificial intelligence, pages 1194–1201, 1996.
  27. [27]Henry A Kautz, Bart Selman, et al. Planning as satisfiability. In ECAI, volume 92, pages 359–363, 1992.
  28. [28]Simon Knight, Hung X Nguyen, Nickolas Falkner, Rhys Bowden, and Matthew Roughan. The internet topology zoo. IEEE Journal on Selected Areas in Communications, 29(9):1765–1775, 2011.
  29. [29]Ruihan Li, Yifei Yuan, Fangdan Ye, Mengqi Liu, Ruizhen Yang, Yang Yu, Tianchen Guo, Qing Ma, Xianlong Zeng, Chenren Xu, Dennis Cai, and Ennan Zhai. A general and efficient approach to verifying traffic load properties under arbitrary failures. In Proceedings of the ACM SIGCOMM 2024 Conference, ACM SIGCOMM ’24, page 228–243, New York, NY, USA, 2024. Association for Computing Machinery.DOI
  30. [30]Yikai Lin, Mohab Gawish, Shih-Hao Tseng, Lixin Gao, Cen Zhao, John Tracey, Sunyi Shao, Hyojeong Kim, and Ying Zhang. Centralium: A hybrid route-planning framework for large-scale data center network migrations. In Proceedings of the ACM SIGCOMM 2025 Conference, pages 395–408, 2025.DOI
  31. [31]Hongqiang Harry Liu, Xin Wu, Wei Zhou, Weiguo Chen, Tao Wang, Hui Xu, Lei Zhou, Qing Ma, and Ming Zhang. Automatic life cycle management of network configurations. In Proceedings of the Afternoon Workshop on Self-Driving Networks, SelfDN 2018, page 29–35, New York, NY, USA, 2018. Association for Computing Machinery.DOI
  32. [32]Thomas McCluskey and Mauro Vallati. Embedding automated planning within urban traffic management operations. In Proceedings of the International Conference on Automated Planning and Scheduling, volume 27, pages 391–399, 2017.DOI
  33. [33]Metis. http://glaros.dtc.umn.edu/gkhome/views/metis.
  34. [34]Microsoft Research. Z3 Theorem Prover. https://github.com/Z3Prover/z3.
  35. [35]Francesco Percassi and Alfonso E Gerevini. On compiling away pddl3 soft trajectory constraints without using automata. In Proceedings of the International Conference on Automated Planning and Scheduling, volume 29, pages 320–328, 2019.DOI
  36. [36]Sivaramakrishnan Ramanathan, Ying Zhang, Mohab Gawish, Yogesh Mundada, Zhaodong Wang, Sangki Yun, Eric Lippert, Walid Taha, Minlan Yu, and Jelena Mirkovic. Practical intent-driven routing configuration synthesis. In 20th USENIX Symposium on Networked Systems Design and Implementation (NSDI 23), pages 629–644, 2023.
  37. [37]Silvia Richter and Matthias Westphal. The lama planner: Guiding cost-based anytime planning with landmarks. Journal of Artificial Intelligence Research, 39:127–177, 2010.DOI
  38. [38]Jussi Rintanen. Planning as satisfiability: Heuristics. Artificial intelligence, 193:45–86, 2012.DOI
  39. [39]Jussi Rintanen. Madagascar: Scalable planning with sat. Proceedings of the 8th International Planning Competition (IPC-2014), 21:1–5, 2014.
  40. [40]Jussi Rintanen, Keijo Heljanko, and Ilkka Niemelä. Planning as satisfiability: parallel plans and algorithms for plan search. Artificial Intelligence, 170(12-13):1031–1080, 2006.DOI
  41. [41]Enrico Scala. ENHSP: Expressive Numeric Heuristic Search Planner. https://sites.google.com/view/enhsp/.
  42. [42]Tibor Schneider. Snowcap Prototype. https://github.com/nsg-ethz/snowcap.
  43. [43]Tibor Schneider, Rüdiger Birkner, and Laurent Vanbever. Snowcap: Synthesizing network-wide configuration updates. In Proceedings of the 2021 ACM SIGCOMM Conference, pages 33 – 49, New York, NY, 2021-08. Association for Computing Machinery. ACM SIGCOMM 2021 Conference; Conference Location: Online; Conference Date: August 23-27, 2021.DOI
  44. [44]Tibor Schneider, Roland Schmid, Stefano Vissicchio, and Laurent Vanbever. Taming the transient while reconfiguring bgp. In ACM SIGCOMM ’23: Proceedings of the ACM SIGCOMM 2023 Conference, pages 77 – 93, New York, NY, 2023-09. Association for Computing [45] Irfansha Shaik and Jaco Van De Pol. Optimal layout synthesis for quantum circuits as classical planning. In 2023 IEEE/ACM International Conference on Computer Aided Design (ICCAD), pages 1–9. IEEE, 2023.
  45. [46]Arjun Singh, Joon Ong, Amit Agarwal, Glen Anderson, Ashby Armistead, Roy Bannon, Seb Boving, Gaurav Desai, Bob Felderman, Paulie Germano, et al. Jupiter rising: A decade of clos topologies and centralized control in google’s datacenter network. ACM SIGCOMM computer communication review, 45(4):183–197, 2015.
  46. [47]David Speck, Robert Mattmüller, and Bernhard Nebel. Symbolic top-k planning. In Vincent Conitzer and Fei Sha, editors, Proceedings of the Thirty-Fourth AAAI Conference on Artificial Intelligence (AAAI 2020), pages 9967–9974. AAAI Press, 2020.
  47. [48]Alvaro Torralba, Vidal Alcázar, Daniel Borrajo, Peter Kissmann, and Stefan Edelkamp. Symba*: A symbolic bidirectional a* planner. In International Planning Competition, pages 105–108, 2014.
  48. [49]Arash Vahidi. JDD, a pure Java BDD and Z-BDD library. https://bitbucket.org/vahidi/jdd/.
  49. [50]Alessandro Valentini, Andrea Micheli, and Alessandro Cimatti. Temporal planning with intermediate conditions and effects. In Proceedings of the AAAI Conference on Artificial Intelligence, volume 34, pages 9975–9982, 2020.arxiv.org/abs/1909.11581
  50. [51]Mauro Vallati, Daniele Magazzeni, Bart De Schutter, Lukás Chrpa, and Thomas McCluskey. Efficient macroscopic urban traffic models for reducing congestion: A pdpl+ planning approach. In Proceedings of the AAAI conference on artificial intelligence, volume 30, 2016.DOI
  51. [52]Laurent Vanbever, Stefano Vissicchio, Cristel Pelsser, Pierre Francois, and Olivier Bonaventure. Seamless network-wide igp migrations. In Proceedings of the ACM SIGCOMM 2011 Conference, pages 314–325, New York, NY, USA, 2011. Association for Computing Machinery.
  52. [53]Stefano Vissicchio, Laurent Vanbever, Cristel Pelsser, Luca Cittadini, Pierre Francois, and Olivier Bonaventure. Improving network agility with seamless bgp reconfigurations. IEEE/ACM Transactions on Networking, 21(3):990–1002, 2012.DOI
  53. [54]Dan Wang, Peng Zhang, and Aaron Gember-Jacobson. Expresso: Comprehensively reasoning about external routes using symbolic simulation. In Proceedings of the ACM SIGCOMM 2024 Conference, ACM SIGCOMM ’24, page 197–212, New York, NY, USA, 2024. Association for Computing Machinery.DOI
  54. [55]Benedict Wright, Robert Mattmüller, and Bernhard Nebel. Compiling away soft trajectory constraints in planning. In KR, pages 474–483, 2018.
  55. [56]Xieyang Xu, Yifei Yuan, Zachary Kincaid, Arvind Krishnamurthy, Ratul Mahajan, David Walker, and Ennan Zhai. Relational network verification. In Proceedings of the ACM SIGCOMM 2024 Conference, ACM SIGCOMM ’24, page 213–227, New York, NY, USA, 2024. Association for Computing Machinery.arxiv.org/abs/2403.17277
  56. [57]Fangdan Ye, Da Yu, Ennan Zhai, Hongqiang Harry Liu, Bingchuan Tian, Qiaobo Ye, Chunsheng Wang, Xin Wu, Tianchen Guo, Cheng Jin, Duncheng She, Qing Ma, Biao Cheng, Hui Xu, Ming Zhang, Zhiliang Wang, and Rodrigo Fonseca. Accuracy, scalability, coverage: A practical configuration verifier on a global wan. In Proceedings of the Annual Conference of the ACM Special Interest Group on Data Communication on the Applications, Technologies, Architectures, and Protocols for Computer Communication, SIGCOMM ’20, page 599–614, New York, NY, USA, 2020. Association for Computing Machinery.
  57. [58]Yifei Yuan, Fangdan Ye, Yifan Li, Jingkai Zhang, Mengqi Liu, Yuyang Sang, Ruizhen Yang, Duncheng She, Zhiqing Ye, Tianchen Guo, Xiaobo Zhu, Xinji Tang, Li Jia, Zhongyu Guan, Linpeng Su, Ci Wang, Ruiyang Feng, Shuo Wu, Zhonghui Xie, Cheng Jin, Peng Zhang, Qing Ma, Xianlong Zeng, Dennis Cai, and Ennan Zhai. New evolution of hoyan: Enhancing scalability, usability, and accuracy for alibaba’s global wan verification. In Proceedings of the ACM SIGCOMM 2025 Conference, SIGCOMM ’25, page 809–825, New York, NY, USA, 2025. Association for Computing Machinery.DOI
  58. [59]Peng Zhang, Dan Wang, and Aaron Gember-Jacobson. Symbolic router execution. In Proceedings of the ACM SIGCOMM 2022 Conference, SIGCOMM ’22, page 336–349, New York, NY, USA, 2022. Association for Computing Machinery.DOI
  59. [60]Yihao Zhao, Xiaoxiang Zhang, Hang Zhu, Ying Zhang, Zhaodong Wang, Yuandong Tian, Alex Nikulkov, Joao Ferreira, Xuanzhe Liu, and Xin Jin. Klotski: Efficient and safe network migration of large production datacenters. In Proceedings of the ACM SIGCOMM 2023 Conference, ACM SIGCOMM ’23, page 783–797, New York, NY, USA, 2023. Association for Computing Machinery.DOI
  60. [61]Hang Zhu, Varun Gupta, Satyajeet Singh Ahuja, Yuandong Tian, Ying Zhang, and Xin Jin. Network planning with deep reinforcement learning. In Proceedings of the 2021 ACM SIGCOMM 2021 Conference, SIGCOMM ’21, page 258–271, New York, NY, USA, 2021. Association for Computing Machinery.

Paper details

vlnc:W_pawx8fr8
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC BY 4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Computer Science

Not recorded for this paper

View statement
Looking for related papers…
Contents