Who Gets the Grid Capacity? Allocating Dynamic Access Among Multiple Virtual Power Plants

Abstract

Virtual power plants (VPPs) trade in the same wholesale market and share distribution lines and transformers, and uncoordinated, profit-maximizing VPPs can push a shared transformer past its thermal limit or drive a feeder voltage out of band. The utility, which only observes the front-of-the-meter net injection at each bus, must keep the network safe from that net injection alone. We allocate a 24-hour active and reactive operating envelope to each VPP by a Benders decomposition: the utility sets a trial envelope, each VPP solves its private convex portfolio problem, and the returned value and dual gradient become supporting cuts that rebuild its value function while its schedule, state, and cost stay private. The envelope carries the transformer's thermal state across hours, bounds a joint conditional value-at-risk over forecast uncertainty, and is re-optimized each hour with the current hour committed. On a reduced IEEE-13 feeder with real load and prices, an active-power-only implementation lowers the transformer's peak-temperature CVaR from 254 to 97,∘^\circC at a 28% value give-up and holds the transformer below its limit where nameplate access breaches it.

Paper details

vlnc:W_pdx4m959
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC-BY-NC-SA-4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…