Abstract
Variable-speed pumped storage hydropower (VSPSH) plants modulate power continuously in both generation and pumping, a match for the net-load ramps of rising wind and solar. Their flexibility is bounded by hydraulics rather than by a power rating, so the deliverable power range shifts with net head and excludes small outputs entirely. This paper addresses bidding and dispatch for such a plant across a two-settlement market with a hierarchical reinforcement-learning formulation. Its two layers are circularly dependent: a real-time (RT) bid is defined only against a cleared day-ahead (DA) commitment, and the DA reward only against an RT dispatch policy. Our proposed feasibility-constrained domain randomization breaks the cycle by training the RT layer on generated deliverable DA schedules before any bidding policy exists; the DA layer then optimizes against that frozen RT behavior, and the two alternate. Learning a policy at once profitable and deliverable is obstructed by the nonconvex operating region: penalizing infeasibility competes against the revenue the offer earns, discouraging an undeliverable offer without preventing one. We therefore pursue safety through action-space modification rather than through the reward, combining action masking of the bid space, projection of each commitment before settlement, and replacement by a fail-safe controller. Over 48 out-of-sample days it earns $3,313/day more than an equivalent penalty formulation while holding undeliverable commitment at a median of zero, which the penalty formulation does not, and no ablation improves on it without giving up deliverability or the storage target.
Introduction
Deep decarbonization is displacing dispatchable thermal generation with variable wind and solar, and the resulting net-load ramps and price volatility place a premium on bulk energy storage. Pumped storage hydropower (PSH) remains the largest installed storage class worldwide, and in restructured systems its economics are increasingly set by wholesale market arbitrage rather than by regulated capacity payments [1, 2]. Conventional fixed-speed PSH serves that role poorly. Its synchronous machine is mechanically locked to grid frequency, so generation is confined to a narrow band around rated power and pumping is effectively an on/off decision. Variable-speed pumped storage hydropower (VSPSH) removes the restriction by decoupling rotor speed from grid frequency through a doubly-fed induction machine or a full converter, permitting continuous modulation of power in both generation and pump modes and improving part-load efficiency [3, 4, 5, 6].
That gain comes with a harder decision problem, because VSPSH flexibility is bounded by hydraulics rather than by a power rating. The converter’s slip range bounds speed re-centering electrically, while cavitation, reverse-flow and vibration limits bound it hydraulically, and both tighten away from the design head [3, 4, 5]. The feasible set is therefore head-dependent and nonconvex: a generation branch, a pump branch, and an idle point, with both branches contracting at the head extremes and excluding small outputs entirely. A commitment deliverable at mid-reservoir may be unrealizable at the same MW level once the head has moved, and the head is itself a consequence of earlier dispatch, so feasibility is path-dependent.
Power-system scheduling has long recognized head-dependence. The canonical mixed-integer linear programming (MILP) treatment of short-term hydro unit commitment with a head-dependent reservoir is [7], extended in [8] to reservoirs with multiple vibration zones, bands of output that must be permanently avoided and whose position moves with net head. For PSH more broadly, existing formulations schedule price-taking variable-speed plants for energy and reserve, co-optimize mixed fixed- and variable-speed fleets under water-head effects, embed variable-speed units in hydro-wind-solar portfolios, build risk- and profit-based bidding strategies, and map head-dependent capability into multi-segment ISO bid formats [6, 9, 10, 11, 12, 13, 14]. These formulations are almost exclusively day-ahead. The five-minute real-time market, where continuous modulation is most valuable and where state of charge (SoC) actually evolves, is represented as a balancing residual rather than as a second decision layer with its own policy.
What a VSPSH plant may bid is set by tariff. Federal Energy Regulatory Commission (FERC) Order No. 841 requires every U.S. regional transmission organization or independent system operator (RTO/ISO) to adopt a storage participation model in which a resource submits a discharge offer and a charge bid, each as price–quantity pairs cleared against the locational marginal price (LMP) [15]. We adopt exactly this action space, so bidding both price and quantity is the mechanism the tariffs provide rather than a modeling convenience, though self-bidding is permitted rather than universal [16]. Settlement falls on the cleared quantity, and PJM does not account for state of charge when dispatching a storage resource, leaving it to the participant’s own bidding parameters and offer prices [17]. The clearing carries no model of the head trajectory that the plant’s own earlier dispatch determines. A participant can protect itself by bidding only what it could deliver at the worst head it might reach, but the turbine branch contracts to 70% of rated power there, so a bound safe at every head forfeits much of what variable speed is installed to provide. Deliverability therefore falls to the participant rather than to the mechanism.
Classical bidding methods formulate stochastic or robust programs over price-scenario trees [18, 19], and the arbitrage value of storage policies has been studied since [20]. The closest analogue is [21], which finds a price–quantity bid earns substantially more across the two settlements than a quantity-only bid. Its asset is a battery with convex, SoC-independent power limits, so it does not address what happens when a cleared quantity cannot be delivered.
Reinforcement learning (RL) offers a complementary route, since it learns a policy against a simulator without requiring a tractable analytic model and amortizes the online decision to a single forward pass. Existing RL work on storage either learns real-time or day-ahead dispatch policies under price uncertainty [22, 23, 24], couples arbitrage to a battery degradation model [25], learns genuine bid objects such as high-dimensional monotone bid curves or temporally aware multi-market bids [26, 27], or coordinates timescales and risk preferences through multi-agent and hierarchical designs [28, 29]. A hierarchy across the two settlements is harder to train than the layer count suggests, because the layers define each other: a real-time (RT) bid is meaningful only against a cleared day-ahead (DA) commitment, and the DA reward is unknown until the RT policy that will execute the commitment is fixed. Prior designs sidestep this by letting a single planner set both timescales, or by training each layer against a fixed heuristic for the other, and all of it assumes battery-like feasibility. For hydro, RL has targeted reservoir operation rather than bidding [30], and for VSPSH the learning literature sits at the device layer [31]. The VSPSH bidding literature is optimization-based and day-ahead-centric, while the VSPSH learning literature is control-theoretic and market-free. This paper occupies the gap between them.
Placing a learned bidding policy in that gap exposes a problem the battery-centric literature does not encounter. A battery’s feasible set is a convex interval, so clipping an infeasible request returns the nearest feasible power; the VSPSH region contains an idle gap, so a sub-minimum commitment is rewritten to zero and the plant is settled on a quantity it never delivered. A penalty on that shortfall competes with the settlement it is meant to discourage, so a learned policy can appear to satisfy the constraint while systematically violating it. Deliverability is not the only constraint the mechanism must carry. Storage has to reach its contracted end-of-day level, which the day-ahead plan can only project and which the real-time layer is free to undo as it trades. We therefore enforce both through safety through action-space modification, which surveys of safe reinforcement learning for power systems and of provably safe reinforcement learning both separate from penalty terms on exactly this ground [32, 33]. This paper contributes the following.
A hierarchical bidding formulation for VSPSH (see Sec. III-B) that casts the two settlements as coupled Markov decision processes (MDPs), an hourly DA bidding layer and a five-minute RT dispatch layer, each acting through the price–quantity bid the storage participation models accept and each constrained by the head-dependent operating region.
Feasibility-constrained domain randomization (see Sec. III-C), a constructive generator that produces deliverable day-ahead schedules across seven behavior classes. It supplies the RT layer’s training distribution before any DA bidding layer exists, resolving the circularity without joint optimization over both layers. The layers then refine by anchored alternation, each best-responding to the other while the RT layer’s training distribution grows by adding its partner’s rollouts to the synthetic classes.
Safe scheduling and operation through action-space modification for both constraints, instantiating three mechanisms, namely action masking of the bid space onto the operating region, action projection of each commitment before settlement (see Sec. III-E), and action replacement by a fail-safe restoration controller (see Sec. III-F).
A numerical study comparing the proposed method against alternative configurations of each component (see Secs. IV-E, IV-F).
Sec. II reviews market mechanics and the VSPSH operating region, Sec. III develops the plant model and the feasibility mechanisms, Sec. IV reports the numerical study, and Sec. V concludes. Every parameter value needed to reproduce the results, together with the per-class benchmark and the derivations omitted here for length, is given in the appendix of the preprint [34].
Background
Two-Settlement Electricity Markets
Most U.S. wholesale electricity markets (e.g., PJM, NYISO) operate a two-settlement structure consisting of a day-ahead (DA) market and a real-time (RT) market [16, 18]. This section fixes the settlement notation used throughout.
The day-ahead market clears once per day for the 24 hours of the following operating day. Generators submit hourly supply offers for specifying a quantity in MW and a marginal price in $/MWh. Loads (and net buyers such as pump-mode storage) submit corresponding demand bids. The independent system operator (ISO) clears the market via a security-constrained unit commitment, producing an hourly day-ahead locational marginal price (DA-LMP), . A bid is accepted when it is in-the-money relative to the clearing LMP; the cleared quantity is settled financially at the LMP the following day. Forward financial settlement occurs on the cleared DA quantity at , regardless of physical delivery.
The real-time market clears every 5–15 minutes (5 min in PJM) based on the security-constrained economic dispatch. Each interval produces a real-time locational marginal price (RT-LMP), . The market participant’s physical dispatch may differ from its DA commitment for the enclosing hour; the per-interval RT settlement is the deviation priced at . Execution with at every interval, in which the unit simply delivers its cleared schedule, is called zero-deviation and serves throughout as the reference against which the real-time layer is measured. Total daily revenue is then
where h and is the operating-region penalty of Sec. III-D. We model no start-up cost and no ramping cost, so is the only term that is not a market settlement, and under the mechanisms of Sec. III-E it is zero throughout Sec. IV; reported revenue is therefore market cash.
By offering to generate above, or pump below, its cleared position, a participant exploits RT-LMP movements away from the DA-LMP at the cost of physical exposure. We call these upward (UP) and downward (DN) deviation bids. How much to commit day-ahead and how much to leave to real time is itself a decision, and for storage it is coupled across the day by the state of charge.
Variable-Speed Pumped Storage Hydropower
A PSH plant uses a reversible turbine-pump unit to cycle water between two reservoirs at different elevations. In generation mode the upper reservoir feeds the turbine; in pump mode electrical energy lifts water back to the upper reservoir [1]. The two modes convert between hydraulic power and electrical power in opposite directions, and lose energy in both,
where is the flow through the unit, the net hydraulic head between the reservoirs, the unit’s efficiency, and and the fluid density and gravity. Generating delivers less electrical power than the water carries, while pumping consumes more than it stores. The efficiency is jointly maximized at a single best efficiency point ; we approximate the surrounding hill chart with a quadratic
where, here and throughout the paper,
denotes the projection of a scalar onto the interval . We write for the corresponding projection onto the nonconvex operating region introduced below, which Sec. III-E makes precise.
In addition to what was described in Sec. I, Eq. (2) adds a second reason for the head-dependent operating region. Because is linear in and the flow is bounded by the waterway and runner capacity, a given maximum flow yields less power as the reservoir drains. Peak generation therefore falls at low head for an energetic reason, separately from the slip and cavitation limits that shape the region elsewhere.
We characterize the boundary of this region by four piecewise-linear functions of the normalized head fraction , namely the turbine-branch limits , and the pump-branch limits , . The feasible operating region is then
None of the mechanisms developed in this paper depends on the particular breakpoints. They require only the qualitative structure described next, so the numerical values used in our experiments, which describe a 100 MW-class unit, are deferred to the preprint.
Figure 1 renders the region. Three features matter for bidding. First, the region is nonconvex: the unit cannot sustain small power magnitudes in either direction, so any request whose magnitude falls below the relevant branch minimum can only be met by idling. Second, both branches contract at the head extremes, so a commitment that is feasible at moderate storage, with head near , may be infeasible at the same MW level when storage is nearly full or nearly empty. Third, the attainable turbine maximum at low storage falls well below the nameplate rating, so aggressive day-end commitments near nameplate are physically unrealizable on days that drain the reservoir.

Figure 1. The feasible operating region of Eq. (5). Solid curves are , dashed curves .
Why VSPSH Bidding is Hard
Three structural features distinguish VSPSH bidding from conventional storage arbitrage:
(i) Head-dependent feasibility: Battery models abstract feasibility into an SoC band and a constant power limit. A VSPSH plant has both, plus the nonconvex operating region of Figure 1, and a commitment outside it cannot be followed in real time (Sec. III-D).
(ii) Hierarchical price exposure: The DA agent commits an hourly schedule under a DA-LMP forecast; the RT agent then dispatches at 5-min resolution under the cleared and a noisy forecast. The layers share one storage state and cannot be optimized independently.
(iii) Storage as a coupling variable: Each commitment changes the achievable head trajectory, and with it the operating region of every later hour. The DA agent must reason about that trajectory; the RT agent must exploit price deviations within the one it inherits.
Methods
Plant Physical Model
The unit we model is rated 100 MW in both generation and pumping. Its usable reservoir spans to over a surface, so the geometric head is affine in storage and sweeps m across the usable band. That is roughly 490 MWh of usable energy, or a 4.9-hour plant at rated power, and the 50% head swing is what makes the operating region move with the state of charge. We model the plant at a 5-minute resolution. The reservoir storage volume evolves under
where is the flow through the unit (positive = generation, negative = pumping), is the natural inflow, and are usable-storage bounds. We model the inflow as stochastic, redrawn each interval about a constant mean; the agents’ forecasts use that mean, while the plant realizes the draw. The head is recovered geometrically from and projected onto . Throughout the rest of the paper we work with the normalized state of charge
so that every storage quantity quoted later, including the end-of-day target and the safety band, is a fraction of usable storage. Power is additionally rate-limited: the dispatch may move by at most 50 MW per five-minute step, so the unit moves from idle to either rating in two steps and reverses from rated pumping to rated generation in four.
Given a commanded power, Eq. (2) is solved for the flow by fixed-point iteration, since itself depends on . The hill chart is centred at m and with , so over the reachable operating region ranges from 0.79 to 0.90 with a mean of 0.85. Because multiplies the generating power and divides the pumping power, the round-trip efficiency runs from 0.72 to 0.81 at rated power depending on head, and falls to 0.63 at part load. The instantaneous power is constrained to . An infeasible request is rewritten: becomes either 0 (when is below the minimum) or in the matching branch (when exceeds the maximum). This rewriting matches the behavior of a real plant operator who cannot dispatch at a setpoint outside the unit’s operating region, and is the source of the cleared-vs-executed gap we discuss in Sec. III-D. A hard rail keeps storage inside of the usable range. When already sits below the lower rail the unit may not generate, and above the upper rail it may not pump; the offending request is replaced by idle rather than reduced in magnitude. No penalty term is attached to the replacement, so the only cost of reaching a rail is the settlement the idled intervals do not earn. The agent is warned before that happens by the shaping term of Eq. (10), which charges a quadratic penalty on the tighter band .
Hierarchical Bidding Formulation
We decompose the joint bidding problem into a hierarchy of two coupled MDPs: a day-ahead bidding layer that submits hourly price–quantity offers, and a real-time dispatch layer that operates the unit at five-minute resolution against the cleared schedule. We refer to the trained policies as the DA and RT agents when discussing training, and as the bidding and dispatch layers when discussing operation. Figure 2 gives an overview of the resulting training framework.
Figure 2. Sequential co-training framework. Feasibility-constrained domain randomization supplies diverse, deliverable DA scenarios to the real-time (RT) agent; the RT policy is then frozen and the day-ahead (DA) agent trains against it. Anchored alternation then refreshes the RT training distribution by adding DA rollouts to the synthetic classes.
(i) The dependency cycle: The RT agent’s action depends on the DA commitment for the current hour; the DA agent’s reward depends on the RT agent’s execution policy. Write for the day’s vector of hourly DA commitments, for the day-ahead bidding policy that produces them, and for the real-time execution policy. Joint optimization would require either an alternating fixed-point iteration or a single agent acting over the joint policy space , which is prohibitively high-dimensional. We instead adopt a sequential training recipe: first train the RT agent against a wide programmatic distribution of plausible commitments, then train the DA agent against the frozen RT policy.
(ii) Robustness first, then synergy: At round one no learned DA agent exists, and an RT action is defined only relative to a commitment, so the RT agent must train against some distribution of schedules. Any single DA policy would shape its dispatch reflexes around that policy’s idiosyncrasies, so we use a deliberately broad, DA-agnostic distribution of feasible schedules (Sec. III-C). The result is an executor that reacts well to whatever schedule it is handed, and a frozen RT that is a stable environment for the DA agent to explore against. Once a DA agent exists, its own rollouts become the most relevant distribution the RT will face, so we iterate: round two retrains the RT agent on the original seven classes plus an eighth drawn from DA rollouts, then retrains the DA agent against the updated RT. Round one buys robustness, round two synergy; Sec. IV-E measures the alternation and finds the round-2 gain positive.
We keep the seven synthetic classes in round two, against the intuition that the dispatch layer will only ever execute schedules from its own bidding layer. Training a round-2 dispatch policy exclusively on day-ahead rollouts refutes that intuition: the specialized policy is worse overall and, decisively, no better on day-ahead rollouts themselves (Sec. IV-B). The synthetic classes act as a regularizer rather than as insurance bought at the target distribution’s expense.
Real-time dispatch MDP
1) Real-time dispatch MDP: The RT agent operates the unit over five-minute steps. At step the state collects head, storage, the past four power dispatches, the next-12-step RT-LMP forecast, the remaining hours of DA commitments and DA-LMPs, a storage-deficit feature, four clock features giving the hours remaining, hour of day, minute within the hour and day of week, and the average energy cost of the storage currently held. The agents reported in Sec. IV act on a reduced view of this vector, with all but eight components zeroed. Head, storage, the near real-time forecast, the current DA-LMP, the storage deficit and the hours remaining survive, while the far forecast horizons and the later DA commitments are suppressed. We chose the reduced view after comparing four otherwise identical RT agents against a zero-deviation executor on the same price days. The action encodes (quantity, price) pairs for an upward deviation offer and a downward deviation bid. Quantities are decoded by linear maps; prices are decoded as signed offsets from the hour’s day-ahead price, which is the natural reference point for a deviation bid,
with . The absolute values are not cosmetic. An upward offer clears when and a downward bid clears when , so the two are well posed only when . Under the unconstrained parameterization the opposite ordering is reachable, and there both orders clear on the same interval. Settlement is on the net deviation at the real-time LMP, so the two legs cancel and the interval produces no dispatch and no cash. Half of the raw price plane therefore encodes pairs of orders whose net effect is nil, and within it many distinct actions map to the same outcome, so the settlement reward cannot distinguish them. An executor trained without the constraint confirms this. Its median quotes invert to , both orders clear simultaneously on 28% of discretionary intervals, and it sells into only 26% of the intervals where the real-time price exceeds the day-ahead price by more than $3/MWh, against 36% for a fixed sensible quote. Forcing makes the inverted half unreachable rather than merely unattractive. The pair then clears against to produce a deviation that combines with the DA commitment to set the dispatch
with MW. The cap is a modeling choice rather than a tariff rule. Real time settles the full deviation between metered output and the cleared day-ahead position, and no ISO bounds its magnitude directly, so stands in for the self-imposed limit a risk-managed participant would place on its physical exposure.
The per-step reward is the unshaped settlement cash flow
where is a quadratic operating-region penalty, zero inside . The penalty is evaluated on the requested power, before the operating region is applied, so it is a backstop rather than the enforcement mechanism. In the proposed system the action mask of Sec. III-E makes every request feasible and the term is identically zero; it becomes active only in the ablations that remove the mask, where it is the sole remaining defence. A storage-shaping term may optionally be added during training. We use a safety-only shaping
with , , . The penalty is zero everywhere inside ; inside the safe range the gradient comes purely from settlement. This contrasts with prior trajectory-shaping designs that anchor the SoC to a per-episode reference path; trajectory shaping is appropriate when training on a single schedule shape but misfires on a diverse mix because the same “deviate upward when above target” reflex contradicts itself across schedule types.
Day-ahead bidding MDP
2) Day-ahead bidding MDP: The DA agent operates a 24-step sequential MDP. At step it commits one hour of dispatch via an action encoding a (quantity, price) bid. The bid clears against via a uniform-pricing rule [18]: an in-the-money bid produces , an out-of-the-money bid produces . The price component is parameterized as a delta from the DA forecast, , so the neutral action clears with 50% probability and the agent need not learn the absolute price scale from scratch.
The DA state collects the projected SoC, a one-hot encoding of the current hour, the day’s 24 DA-LMP forecasts, the commitments cleared in hours already decided, and the fraction of the day remaining, with a day-of-week indicator. The sequential decomposition is a training device: a participant submits all 24 offers before any of them clears, so a deployable policy must form them from forecast information alone. Every number we report is measured that way, with each hour’s commitment assumed cleared against the forecast rather than the realized price. The DA per-hour reward is
plus, at , the total RT settlement and a terminal-SoC penalty. The terminal penalty uses three coefficients. and weight the squared terminal error above and below target, so the formulation can charge a shortfall more heavily than an overshoot, and weights a linear hinge applied in both directions, so that any terminal error carries a non-zero gradient. Let denote the required end-of-day state of charge (we use ) and the terminal SoC the DA plan projects under zero-deviation execution. Writing , the penalty is
a quadratic well with a linear hinge. We set throughout, so the well reported here is symmetric and the hinge alone supplies the gradient at target. The penalty is paired with terminal-hour balancing, which overrides the hour-23 commitment with whatever magnitude lands exactly under zero-deviation physics. Balancing carries the constraint whenever that correction is itself deliverable, and the penalty shapes hours 0–22 so that it usually is. Here is the MW distance the storage-safety filter removes from the requested commitment, and is the distance the operating-region filter rewrites, summed over the twelve five-minute substeps of the hour; both are accumulated by simulating one hour of zero-deviation dispatch under the same physics the RT environment executes (Sec. III-D). The two feasibility penalties are training-only signals, and backstops in the same sense, since the projection of Sec. III-E drives to approximately zero before they act; the eval metric reports the unshaped settlement (Eq. (1)).
A 20%-probability adversarial DA-LMP perturbation is applied during training: when triggered, the realized is sampled from the convex hull of the forecast and the agent’s bid price, producing a perturbed clearing that punishes lazy bids placed far from the forecast. This is not a market-design assumption but a training device, designed to make the policy robust to the DA-LMP versus forecast gap.
Both agents are trained with Soft Actor-Critic [35]; network sizes and optimizer settings are listed in the preprint. To make best-checkpoint selection and final performance reproducible rather than seed-dependent, we normalize rewards online and clip gradients, and we evaluate on a fixed held-out seed band, detailed in Sec. IV-A.
Generating Deliverable Day-Ahead Schedules
The RT agent must train against a distribution of plausible DA commitments. We construct this distribution programmatically from eight schedule classes, each a stochastic generator parameterized by the LMP forecast and the operating-region constants. Four react to price: price-follow activates the most and least expensive forecast hours, balanced pumps in the cheapest and generates in the most expensive, peak-shave uses symmetric blocks in each direction sized by the round-trip energy balance, and mixed-arbitrage takes that structure with independent magnitudes. Three sample shape without reference to price, namely random, feasible-arbitrage, and a flat all-idle day. The eighth draws from a cache of 2,000 schedules produced by a previously trained DA agent, built with the operating-region projection active so that the cached schedules are exactly the deliverable commitments the RT agent will face.
Each schedule is constructed to be deliverable rather than drawn and tested afterwards. Given a class’s intended shape, we forward-simulate storage hour by hour and commit, at each hour, the largest magnitude in the intended direction whose end-of-hour SoC remains inside . Because a constant-sign commitment moves SoC monotonically within the hour, bounding the end-of-hour value bounds the whole hour. The last two hours are set to whatever balances SoC back to , likewise projected onto the operating region. This yields a deliverable schedule on essentially every draw; the flat class alone remains all-idle, a deliberate no-position day.
A final step then overrides hour 23 of every accepted schedule with the magnitude that lands SoC exactly at under zero-deviation physics, so that every training schedule ends at the same storage state and the agent cannot learn that an arbitrary ending is acceptable.
Deliverability of Cleared Commitments
The DA and RT layers are settled on different quantities. The market settles the commitment the DA agent submits, but the plant can only execute a point of , and the two need not coincide. A sub-minimum commitment () clears at and produces a DA settlement, yet is executed as 0 MW; the resulting is repurchased at . Since , the net cash effect is small and the commitment can even be profitable, so nothing in the settlement itself discourages it.
This follows from the operating region meeting a settlement rule that pays on the submitted quantity. The gap can be priced, or it can be prevented. Pricing it means adding an operating-region rewrite-distance penalty
to the DA per-hour reward (Eq. (11)). Eliminating it means projecting onto the operating region before settlement (Sec. III-E). Eq. (13) places the responsibility on the learned weights; we place it on the mechanism instead, and Sec. IV-C measures the difference.
Operating-Region Projection
We project every DA commitment onto the operating region before it is settled. Let be the storage-feasible commitment requested at hour and the head at the hour’s start. The projection first maps the magnitude onto the correct branch of , so that a request below the branch minimum is sent to 0 and a request above the branch maximum is sent to . It then, because the head drifts within the hour as storage moves, shrinks the magnitude by bisection until a one-hour zero-deviation simulation rewrites no more than a small tolerance (we use 5 MW-substeps/hour) of the commitment. The settled commitment is , so the DA agent is paid only for power it can physically deliver, and the distance of Eq. (13) is driven to approximately zero for every seed by the mechanism rather than by the learned weights. Two details preserve the rest of the design. First, the projection is applied after the storage-safety projection so it can only reduce magnitude and never pushes storage toward a rail. The projection has a companion that acts one step earlier. Rather than letting the agent name any quantity and repairing it afterwards, the action mask maps the quantity component of the action onto the feasible set itself, allocating the action range across the pump branch, the idle gap and the generation branch in proportion to their widths at the current head [33]. The agent therefore cannot express an undeliverable commitment, and the projection is left to catch only what the mask cannot anticipate, chiefly the drift of head within the hour. The DA and RT layers each carry their own mask, one acting on the hourly commitment and the other on the five-minute dispatch. Second, in the configuration reported here it is skipped on the terminal-balancing hour , whose commitment is computed to land SoC exactly at target, so projecting it would perturb that balance. The projection subsumes the penalty, which we nonetheless keep switched on so that it still charges for whatever the projection leaves behind. In the taxonomy of provably safe reinforcement learning [33] this is an action projection, and terminal restoration (Sec. III-F) is an action replacement driven by a fail-safe controller; retaining a penalty alongside such a mechanism rather than in place of it is what that study recommends.
Terminal State-of-Charge Restoration
The DA agent’s terminal-hour balancing pins the projected (zero-deviation) end-of-day SoC to , but the RT agent’s deviations move the actual storage away from that plan. We close the residual gap by enforcing the target directly rather than by a reward term, which would over-constrain the executor and, because the DA reward carries the realized RT settlement, teach the planner to under-commit generation. The RT action is overridden by a deterministic closed-loop dispatch: at each remaining interval we compute the flow required to close the residual gap, invert the plant physics (Eq. (2)) to the corresponding MW setpoint, and project it onto the operating region. The override bypasses the deviation cap, but the resulting deviation is settled at the realized RT-LMP, so its cost or benefit is a true market settlement rather than a tuned penalty, and it reaches earlier actions through the standard Bellman backup.
Two details make the mechanism work. First, the controller drives storage to a fixed target rather than to whatever level the day-ahead plan projects, and that matters because the projection is unreliable: the hour-23 override lands it on target only when the required correction is itself deliverable, leaving with only 44 of the 144 agent-days inside a percentage point and a worst day at 0.519 where the plan has filled the reservoir. Inheriting those projections would mean inheriting their errors. That is more than twenty times looser than the realized error, so the day-ahead layer alone does not settle the end-of-day constraint, and an inherited target would pass the residual straight through. Second, engagement is adaptive. Adaptive restoration always runs over the final intervals and engages earlier, up to intervals before the end, whenever closing the residual gap would require more than a fraction of the maximum feasible per-interval storage change at the current head. A fixed window would instead have to be wide enough for the worst day, seizing real-time authority on every day to protect against a rare one.
The margin trades lead time against real-time authority. We use throughout: a smaller margin would fire the trigger on nearly every step and leave the controller in charge all day, while the remaining tenth absorbs the contraction of per-interval capability as head moves.
Over the 144 agent-days of Table I the realized end-of-day SoC is 0.2496±0.0023, a twenty-sixfold reduction in standard deviation against the projected spread, with 142 landing within half a percentage point of target and the three exceptions missing by 0.6, 1.0 and 2.2 percentage points. Engaging at the last responsible moment spreads the unwind over as many intervals as the gap requires, rather than a single final hour.
Synthetic Price Model
We use synthetic, PJM-inspired LMPs for both training and evaluation. The DA-LMP is piecewise constant per hour, with weekday/weekend and peak/off-peak premia over a flat base, Student’s -noise for fat tails, and Bernoulli-triggered log-normal spikes and dips; the DA forecast adds Gaussian noise. The RT-LMP is the DA-LMP plus a mean-reverting Ornstein-Uhlenbeck process at a fixed volatility . The spikes and the real-time deviation stand in for the net-load ramps and forecast errors that wind and solar variability introduce, the dominant source of short-horizon price movement at high renewable penetration. The process is discretized at the 5-minute step and reset to zero at every hour boundary. That reset is consequential rather than incidental: it makes hours independent draws, so the real-time layer faces no intra-hour round trip and no predictable inter-hour unwind, which is why the margin measured in Sec. IV-F is small. The RT-LMP forecast the agent observes carries noise growing with horizon. Parameter values, the forecast noise schedule and the statistics behind the reset claim are given in the preprint [34].
Numerical Results
Experimental Setup
The plant is the 100 MW unit of Sec. III-A, with the operating-region curves of Sec. III-B. Episodes span 24 hours; the DA agent commits 24 hourly steps and then executes the frozen RT agent on the cleared schedule. Each configuration is trained with three independent DA seeds and scored on the same 48 out-of-sample price days, giving 144 agent-days. During training, periodic evaluation on a fixed held-out seed band drives best-checkpoint selection. That evaluation uses 120 price days at each checkpoint, and checkpoints are taken every 200 day-ahead episodes and every 100 real-time episodes, giving 10 and 15 respectively. The budget matters. Daily net revenue has a standard deviation of $4,659 across days within a single agent, so a checkpoint scored on 30 days carries a standard error of $851, larger than most of the effects the ablations are meant to resolve, and taking the maximum over many such readings selects the luckiest reading rather than the best policy. Widening the evaluation to 120 days halves that standard error, to $425. Unless stated otherwise, final numbers are reported as the mean over an out-of-sample set of 48 evaluation price days, drawn from a seed band disjoint from the selection band and from a generator stream independent of the one producing training days, and paired-system results are further averaged over independent training seeds to report reproducibility. All numbers come from evaluation, not the training reward. The seed bands are disjoint, so training, checkpoint selection, and out-of-sample evaluation never share a price day.
Three configuration choices matter for reproducibility rather than for performance. Best-checkpoint selection runs on a fixed held-out seed band of deterministic price days, so the selection metric is comparable across checkpoints; selecting on randomly drawn days instead selects on evaluation noise. Rewards are normalized online and policy and critic gradients are clipped, without which DA training occasionally diverges at the reward scales that settlement cash flows produce [35]. Finally, every reported number is a 48-day out-of-sample mean averaged over independent training seeds, and comparisons are paired on identical price days.
RT Controller: Schedule Diversity Drives Generalization
The RT agent’s training distribution is a design variable in its own right. An agent’s training-time evaluation curve is computed on its own schedule distribution, so it cannot compare agents trained on different mixes; we therefore score every RT policy on a common per-class benchmark of 30 episodes per class under the deployment configuration.
Concentrating round-2 training on the DA agent’s own rollouts is intuitively appealing, since the executor will only ever be handed such schedules, but it does not pay. The proposed policy, trained on the seven synthetic classes plus a cache of 2,000 DA rollouts, earns $260/day more than an otherwise identical policy trained exclusively on that cache, and more on every one of the seven classes in which the executor has discretion, which a sign test resolves at . The decisive comparison is the DA-rollout class itself, where the specialized policy trails by $261/day. The synthetic classes therefore act as a regularizer that improves performance on the target distribution rather than as insurance bought at that distribution’s expense, a caution against narrowing an executor’s training distribution onto its deployment distribution once the latter is available.
From Penalty to Projection
The rewrite-distance penalty (Eq. (13)) at -substep does push the median rewrite distance down, but it does not eliminate it reliably: because a sub-minimum commitment is often profitable at settlement (Sec. III-D), the soft penalty and the settlement gradient pull against each other, and the surviving rewrite distance varies strongly with the training seed. On the 48-day out-of-sample set a penalty-trained DA retains a median of 74 MW-substeps under the present recipe (Table I, row Y), with some seeds clipping heavily and others not at all. The operating-region projection of Sec. III-E removes this variance. Every commitment is snapped onto the operating region before settlement, so the median rewrite distance falls to 0 MW-substep. It does so while increasing revenue by $3,313/day, rather than trading revenue for feasibility (Table II). Feasibility thus becomes a property the mechanism enforces rather than an outcome the policy may or may not learn.
| Variable | Setting | Net ($/day) | SoC | op-rewr | ||
| Proposed method () | — | — | 0.250 | 0 |
| DA feasibility | ||||
| Op-region | penalty only | −3,313 | 0.250 | 74 |
| DA action mask | removed | −747 | 0.250 | 0 |
| RT layer | ||||
| RT action mask | removed | −697 | 0.250 | 0 |
| RT policy | zero-deviation | −172 | 0.250 | 0 |
| Pipeline | ||||
| Alternation | one round only | −1,160 | 0.250 | 0 |
Table II. Single-feature ablations, columns as in Table I and Net relative to row .
Hierarchical System Performance
Table I reports the proposed paired system against a penalty-based configuration and a zero-deviation ablation, all evaluated on the same 48 out-of-sample price days. In that table DA, RT and Net are settlement components in $/day, SoC is the mean actual end-of-day SoC against a target of 0.25 with the standard deviation pooled over all 144 agent-days, and op-rewr is the median operating-region rewriting in MW-substeps/day. Net is market cash, DA + RT, with no penalty wedge: the operating-region term is zero for every arm that enforces feasibility structurally, so the reported revenue is settlement the plant actually earned. Row P is averaged over three independent training seeds, with the standard deviation on Net. Every row is a complete pipeline retrained end to end with the named change applied at each stage it touches,
| DA | RT | Net | SoC | op-rewr | |
| P (proposed) | +7,486 | +97 | +7,583 | 0.24960.0023 | 0 |
| P (P, zero-dev) | +7,486 | −74 | +7,412 | 0.24950.0025 | 0 |
| Y (penalty only) | +3,521 | +749 | +4,270 | 0.25000.0006 | 74 |
| F (foresight) | +11,261 | +1,073 | +12,334 | 0.24880.0024 |
Table 1. PAIRED SYSTEM AVERAGE DAILY MARKET CASH.
rather than a single stage swapped at the end; agents are training-process dependent, so reusing an upstream agent from a different configuration would leave most of the mechanism in place. The rows are:
P proposed: projection-trained DA + constructive-schedule, terminal-restoration RT. Mean over three independent seeds.
P Proposed DA + zero-deviation RT: replaces the learned RT at evaluation time with an executor that follows the DA schedule and performs terminal restoration only.
Y Feasibility by penalty: the operating-region penalty in place of both the action mask and the projection, retrained end to end. This is the configuration the battery literature would adopt, and it is the comparison the projection has to beat.
F Perfect foresight: the best deliverable plan for the same plant on the same days with the entire price path known in advance. Not a policy; a reference point. Its SoC spread is across days rather than seeds.
The proposed method earns more and is feasible. Against configuration Y it gains $3,313/day. Because each arm retrains its own agents, the unit of replication is the agent rather than the evaluation day. The 48 days are not independent samples of a configuration change, since all of them are produced by the same three agents. The mechanism is visible in the components. Day-ahead settlement falls from $7,486 to $3,521 while undeliverable commitment rises from 0 to 74 MW-substeps/day, and the penalty arm’s apparently healthy real-time settlement of +$749 is not skill but the executor buying back power the plant could not deliver. Row F asks what the same plant could have earned on these days with the whole price path known in advance. We co-optimise the 24 hourly commitments and the 288 dispatches by trust-region successive mixed-integer programming, subject to the operating region, the deviation cap, the ramp limit, the storage band and the same terminal target, and require every commitment to be one the plant then follows. Each solution is replayed through the simulator and settled on the dispatch actually executed, so it is an achievable plan rather than an artifact of the linearization: rewriting and undelivered commitment are both zero and terminal SoC lands at 0.2488. The proposed system captures 61.5% of this benchmark, a median of 67.0% across days, and never exceeds it on any day. Successive programming converges to a local optimum, so the true optimum is at least as large and the capture ratio at most as high. More than four fifths of the shortfall is day-ahead settlement: with foresight the benchmark commits far more aggressively than the learned planner dares.
Enforcing feasibility in the mechanism is therefore worth roughly 53% of day-ahead revenue in this setting, and the penalty formulation does not approach it. Its spread across training seeds is also three times the proposed method’s ($1,146 against $367), which is the reproducibility cost of leaving feasibility to the reward. The proposed system also lands end-of-day SoC at 0.2496 ± 0.0023, within half a percentage point of target on 142 of 144 agent-days, and it emits a median of 0 MW-substep/day of operating-region rewriting versus 74.
The learned RT agent is a modest contributor beside a day-ahead layer that supplies most of the revenue; replacing it with a zero-deviation executor on the same plan () costs $172/day. The RT settlement column does not measure arbitrage skill on its own, since it also collects involuntary operating-region rewrites and the restoration dispatch, which is why records a nonzero value despite submitting no discretionary bids. Sec. IV-F isolates it.
Figure 3 shows the method on a representative high-arbitrage day: bids clustered around the forecast, a charge–discharge commitment profile, five-minute dispatch tracking it with small upward and downward corrections against the real-time spread, and storage returned to target by restoration.

Figure 3. Panel 1: DA bids vs. realized DA-LMP; filled markers indicate accepted bids. Panel 2: hourly DA commitments (bars) and 5-min RT dispatch (line). Panel 3: SoC trajectory with the 5%/95% safety rails. Panel 4: per-hour DA and RT settlement breakdown with cumulative total.
Sensitivity to Each Design Choice
A combined result cannot attribute credit, so we ablate each mechanism individually. Every arm branches from the same upstream artifacts as the proposed method, changes exactly one variable, trains three independent DA seeds, and is scored on the same 48 out-of-sample days (Table II).
The feasibility mechanism dominates. Replacing the projection and the action mask by a penalty costs an order of magnitude more than any other change and is negative on every training seed. Removing the day-ahead mask costs $747 and is negative on every seed as well. The remaining two arms, the real-time mask and the alternation round, average −$697 and −$1,160 but are not consistently signed across seeds, so we report the averages without reading a direction into them.
A change made to the dispatch layer is partly hidden in system revenue, because each arm’s bidding layer is retrained against its own dispatch layer and absorbs the difference by committing a schedule that needs less correction. The per-class benchmark of Sec. IV-B instead scores every dispatch policy against the same fixed schedule distribution, and there the day-ahead-specialized policy trails the proposed mix on every class in which the executor has discretion. We therefore score dispatch-side changes on the benchmark and reserve system revenue for bidding-side and pipeline-level changes.
Marginal Value of the Real-Time Layer
Is a learned dispatch layer needed at all, given a well-trained bidding layer and the restoration controller of Sec. III-F? We run, on identical price days and against the same day-ahead plan, the trained dispatch policy and a zero-deviation policy, so the comparison is storage-neutral. Both arms share the same day-ahead agents, so the day is a valid unit of replication and we pair over the 48 days.
Day-paired over 48 days and three DA seeds, the learned executor is worth +$167/day (), ahead on 40 of 48 days and 2.2% of market cash. The gain is real trading rather than restoration accounting. It earns +$389/day in discretionary deviations and pays $296/day to unwind them, against −$156 and +$82 for the zero-deviation executor, whose settlement is involuntary rewriting and restoration rather than discretionary trading (Table I).
Conclusions
Variable-speed pumped storage modulates power continuously in both directions, a capability of growing value as wind and solar displace dispatchable generation, but it can do so only inside a head-dependent nonconvex operating region, and it must bid into two settlements whose decisions define each other. We cast this as a hierarchical RL problem and break the circular dependence between the layers by training the dispatch layer against a constructive generator of deliverable schedules before any bidding policy exists. Feasibility is then enforced in the mechanism rather than in the reward: action masking and projection hold every commitment inside the operating region, and an adaptive fail-safe controller returns storage to its contracted end-of-day level at market prices.
References
References
- [1]V. Koritarov, T. D. Veselka, J. Gasper, B. M. Bethke, A. Botterud, J. Wang, M. Mahalik, and Z. Zhou, “Modeling and analysis of value of advanced pumped storage hydropower in the united states,” Argonne National Laboratory, Tech. Rep. ANL/DIS-14/7, 2014.DOI
- [2]J. I. Pérez-Díaz, M. Chazarra, J. García-González, G. Cavazzini, and A. Stoppato, “Trends and challenges in the operation of pumped-storage hydropower plants,” Renewable and Sustainable Energy Reviews, vol. 44, pp. 767–784, 2015.
- [3]K. R. Vasudevan, V. K. Ramachandaramurthy, G. Venugopal, J. B. Ekanayake, and S. K. Tiong, “Variable speed pumped hydro storage: A review of converters, controls and energy management strategies,” Renewable and Sustainable Energy Reviews, vol. 135, p. 101156, 2021.DOI
- [4]M. Alizadeh Bidgoli, W. Yang, and A. Ahmadian, “DFIM versus synchronous machine for variable speed pumped storage hydropower plants: A comparative evaluation of technical performance,” Renewable Energy, vol. 159, pp. 72–86, 2020.
- [5]I. Iliev, C. Trivedi, and O. G. Dahlhaug, “Variable-speed operation of Francis turbines: A review of the perspectives and challenges,” Renewable and Sustainable Energy Reviews, vol. 103, pp. 109–121, 2019.
- [6]D.-K. Jukić, A. Kugi, and W. Kemmetmüller, “Optimal dynamic operation of pumped storage power plants with variable and fixed speed generators,” Control Engineering Practice, vol. 138, p. 105601, 2023.DOI
- [7]A. Borghetti, C. D’Ambrosio, A. Lodi, and S. Martello, “An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir,” IEEE Transactions on Power Systems, vol. 23, no. 3, pp. 1115–1124, 2008.DOI
- [8]C. Cheng, J. Wang, and X. Wu, “Hydro unit commitment with a head-sensitive reservoir and multiple vibration zones using MILP,” IEEE Transactions on Power Systems, vol. 31, no. 6, pp. 4842–4852, 2016.DOI
- [9]M. Chazarra, J. I. Pérez-Díaz, and J. García-González, “Optimal joint energy and secondary regulation reserve hourly scheduling of variable speed pumped storage hydropower plants,” IEEE Transactions on Power Systems, vol. 33, no. 1, pp. 103–115, 2018.DOI
- [10]M. Cao, Z. Hu, and J. Cai, “Optimal scheduling of pumped storage hydropower plants with multi-type of units in day-ahead electricity market considering water head effects,” Frontiers in Energy Research, vol. 11, 2023.DOI
- [11]D.-K. Jukić, A. Kugi, and W. Kemmetmüller, “Optimal operation of pumped storage power plants with fixed- and variable-speed generators in multiple electricity markets considering overload operation,” Journal of Energy Storage, vol. 88, p. 111601, 2024.DOI
- [12]H. Wang, S. Liao, C. Cheng, B. Liu, Z. Fang, and H. Wu, “Short-term scheduling strategies for hydro-wind-solar-storage considering variable-speed unit of pumped storage,” Applied Energy, vol. 377, p. 124336, 2025.DOI
- [13]M.-W. Tian, S.-R. Yan, X.-X. Tian, S. Nojavan, and K. Jermsittiparsert, “Risk and profit-based bidding and offering strategies for pumped hydro storage in the energy market,” Journal of Cleaner Production, vol. 256, p. 120715, 2020.DOI
- [14]K.-b. Kwon, S. Park, and D. Kim, “Stochastic multi-segment scheduling of variable-speed pumped storage hydropower for energy and ancillary services provision,” arXiv:2607.15460, 2026, [Online]. Available: https://arxiv.org/abs/2607.15460.
- [15]Federal Energy Regulatory Commission, “Electric storage participation in markets operated by regional transmission organizations and independent system operators,” Order No. 841, 162 FERC ¶61,127, 2018.
- [16]PJM Interconnection, “PJM Manual 11: Energy & ancillary services market operations,” https://www.pjm.com/-/media/documents/manuals/m11.ashx, 2023.
- [17]——, “Enhancing PJM’s energy storage resource model for anticipated battery growth,” jun 2026, position paper, Market Implementation Committee, Jun. 3, 2026.
- [18]A. J. Conejo, M. Carrión, and J. M. Morales, Decision Making Under Uncertainty in Electricity Markets, ser. International Series in Operations Research & Management Science. Springer, 2010, vol. 153.
- [19]N. P. Padhy, “Unit commitment—a bibliographical survey,” IEEE Transactions on Power Systems, vol. 19, no. 2, pp. 1196–1205, 2004.DOI
- [20]R. Sioshansi, P. Denholm, T. Jenkin, and J. Weiss, “Estimating the value of electricity storage in PJM: Arbitrage and some welfare effects,” Energy Economics, vol. 31, no. 2, pp. 269–277, 2009.DOI
- [21]D. Krishnamurthy, C. Uckun, Z. Zhou, P. R. Thimmapuram, and A. Botterud, “Energy storage arbitrage under day-ahead and real-time price uncertainty,” IEEE Transactions on Power Systems, vol. 33, no. 1, pp. 84–93, 2018.DOI
- [22]H. Xu, X. Li, X. Zhang, and J. Zhang, “Arbitrage of energy storage in electricity markets with deep reinforcement learning,” arXiv:1904.12232, 2019, [Online]. Available: https://arxiv.org/abs/1904.12232.
- [23]H. Wang and B. Zhang, “Energy storage arbitrage in real-time markets via reinforcement learning,” in 2018 IEEE Power & Energy Society General Meeting (PESGM), 2018, pp. 1–5.DOI
- [24]T. Zonjee and S. Shariat Torbaghan, “Energy storage arbitrage in day-ahead electricity market using deep reinforcement learning,” in 2023 IEEE Belgrade PowerTech, 2023, pp. 1–7.DOI
- [25]J. Cao, D. Harrold, Z. Fan, T. Morstyn, D. Healey, and K. Li, “Deep reinforcement learning-based energy storage arbitrage with accurate lithium-ion battery degradation model,” IEEE Transactions on Smart Grid, vol. 11, no. 5, pp. 4513–4521, 2020.DOI
- [26]J. Liu, H. Guo, Q. Tang, E. Lu, Q. Cai, and Q. Chen, “High-dimensional bid learning for energy storage bidding in energy markets,” arXiv:2311.02551, 2023, 15th International Conference on Applied Energy (ICAE2023). [Online]. Available: https://arxiv.org/abs/2311.02551.
- [27]J. Li, C. Wang, Y. Zhang, and H. Wang, “Temporal-aware deep reinforcement learning for energy storage bidding in energy and contingency reserve markets,” IEEE Transactions on Energy Markets, Policy and Regulation, vol. 2, no. 3, pp. 392–406, 2024.arxiv.org/abs/2402.19110
- [28]T. Ochoa, E. Gil, A. Angulo, and C. Valle, “Multi-agent deep reinforcement learning for efficient multi-timescale bidding of a hybrid power plant in day-ahead and real-time markets,” Applied Energy, vol. 317, p. 119067, 2022.DOI
- [29]J. Chen, X. Zhang, and G. Wang, “MARS-DA: A hierarchical reinforcement learning framework for risk-aware multi-agent bidding in power grids,” arXiv:2605.03142, 2026, [Online]. Available: https://arxiv.org/abs/2605.03142.
- [30]W. Xu, F. Meng, W. Guo, X. Li, and G. Fu, “Deep reinforcement learning for optimal hydropower reservoir operation,” Journal of Water Resources Planning and Management, vol. 147, no. 8, 2021.
- [31]K.-b. Kwon, S. Park, and D. Kim, “Degradation-aware pumping control of variable-speed pumped storage via residual reinforcement learning,” arXiv:2607.06911, 2026, [Online]. Available: https://arxiv.org/abs/2607.06911.
- [32]T. Su, T. Wu, J. Zhao, A. Scaglione, and L. Xie, “A review of safe reinforcement learning methods for modern power systems,” Proceedings of the IEEE, 2025, also available as arXiv:2407.00304. [Online]. Available: https://arxiv.org/abs/2407.00304.
- [33]H. Krasowski, J. Thumm, M. Müller, L. Schäfer, X. Wang, and M. Althoff, “Provably safe reinforcement learning: Conceptual analysis, survey, and benchmarking,” Transactions on Machine Learning Research, 2023, [Online]. Available: https://arxiv.org/abs/2205.06750.
- [34]S. Park, K.-b. Kwon, and D. Kim, “Scheduling and operation of variable-speed pumped storage via hierarchical reinforcement learning,” 2026, extended version with appendix.arxiv.org/abs/2611.28310
- [35]T. Haanoja, A. Zhou, P. Abbeel, and S. Levine, “Soft actor-critic: Off-policy maximum entropy deep reinforcement learning with a stochastic actor,” in International Conference on Machine Learning (ICML), 2018, pp. 1861–1870.