betaFeedback

WorksComputer Science

Tight Worst-Case Completion-Time Bounds for Dominant Resource Fairness

Abstract

Dominant Resource Fairness (DRF) is an influential policy for sharing multiple resources among jobs with heterogeneous demands. It combines sharing incentive, strategy-proofness, envy-freeness, and Pareto efficiency, making it particularly attractive for shared computing systems. DRF has been implemented in major resource-management frameworks, including Apache Mesos and Hadoop YARN. DRF is also nonclairvoyant: it requires no advance knowledge of job sizes, making it practical when processing requirements are difficult to predict. This motivates understanding its completion-time performance relative to an optimal schedule that knows all job sizes. However, elementary arguments can only give an Ω(D)Ω(\sqrt D) lower bound and an O(D)O(D) upper bound for total completion time, where DD is the number of resource types. In this paper, we close this gap by proving that DRF is Θ(D)Θ(\sqrt D)-competitive. More generally, for every fixed real q≥1q\geq1, we show that DRF is Θ(D1/(q+1))Θ(D^{1/(q+1)})-competitive for the ℓq\ell_q norm of completion times, with larger qq placing greater emphasis on late-finishing jobs. These bounds hold with arbitrary release times. We also give a refined analysis of total completion time for small DD.

Introduction

Shared computing systems must coordinate access to many resources, including CPU, memory, accelerators, storage I/O, and network bandwidth. In multidimensional scheduling, each distinct resource type or separately constrained resource pool corresponds to a distinct dimension, and a job’s demand vector specifies how much of each resource it needs per unit of processing. The number of dimensions need not be limited to a few hardware categories. For example, when jobs transmit data along fixed network routes, each link imposes its own bandwidth constraint and can be represented by a separate dimension. Thus, the dimension DD can grow with the number of separately constrained resources in the system, making it important to understand how scheduling performance scales with DD. Accounting for these demands together avoids the waste that fixed resource bundles can cause when jobs have different bottlenecks, a central motivation of Ghodsi et al. [13].

In their influential paper, Ghodsi et al. [13] introduced Dominant Resource Fairness (DRF), which extends max-min fairness by comparing users through their dominant shares: the largest fraction of any resource allocated to each user. In their allocation model, DRF simultaneously satisfies four properties particularly well suited to a shared system. Sharing incentive ensures that a user does at least as well as with an equal private partition of the resources. Strategy-proofness rules out gains from misreporting resource demands. Envy-freeness means that no user prefers another user’s allocation. Finally, Pareto efficiency means that improving one user’s allocation must hurt another. Together, these properties encourage participation and truthful reporting, ensure fairness between users, and rule out avoidable inefficiency. Among the allocation policies compared in the original paper, DRF is the only one satisfying all four properties [13 Table 2].

DRF has also influenced practical resource management: it has been implemented in the Apache Mesos cluster resource manager [3] and is available as a built-in allocation policy in Hadoop YARN’s Fair Scheduler [2]. Its fractional allocation has a direct progressive-filling implementation: increase dominant shares together, freeze jobs when they encounter a binding constraint, and continue with the remaining jobs [13 PPS15]. We give the formal definition of DRF and its progressive-filling algorithm in § 2. This simple structure makes DRF an attractive policy to understand even when other allocation rules admit stronger optimization guarantees. Our analysis concerns this fractional scheduling model, rather than the placement and indivisibility constraints of a particular cluster implementation.

Fairness of an instantaneous allocation does not, however, determine when jobs finish. A policy can divide resources fairly at every moment and still delay many jobs relative to a schedule that chooses a different allocation over time. This distinction is especially important in the nonclairvoyant setting: the scheduler knows a job’s resource demands but learns its total processing requirement only when the job completes. Here a natural benchmark is the total completion time of an optimal offline schedule that knows all processing requirements in advance.

For Proportional Fairness (PF), a classical allocation rule from communication networks [18], this connection between allocation and scheduling is well understood. Im, Kulkarni, and Munagala [14] proved that PF is O(1)O(1)-competitive4 for total weighted completion time under general polyhedral packing constraints, which include multidimensional scheduling. PF chooses rates by maximizing a weighted sum of their logarithms. DRF instead has the direct progressive-filling description above, without requiring a general nonlinear optimization routine. The performance guarantee for PF does not transfer to DRF: indeed, Im et al. [14] already observed that DRF need not be O(1)O(1)-competitive.

Elementary arguments give two bounds that leave a substantial gap. With DD resource types, a simple instance gives an Ω(D)\Omega(\sqrt{D}) lower bound for total completion time; we reproduce the construction in Proposition 1. On the other hand, a straightforward comparison gives an O(D)O(D) upper bound; see Theorem 4. Thus some dependence on the number of resources is unavoidable for DRF, but its correct magnitude is not determined by these bounds. This raises the question:

What is the asymptotically tight competitive ratio of DRF for job completion times as a function of the number of resources?

Our Results

We resolve this question by proving that DRF is Θ(D)\Theta(\sqrt{D})-competitive for total completion time. More generally, we give an asymptotically tight analysis for every ℓq\ell_q norm of the completion-time vector. The guarantees hold with arbitrary release times. The algorithm knows demand vectors and caps but not job sizes or future arrivals. For a completion-time vector C=(Cj)j=1nC = (C_j)_{j=1}^{n} and a real q≥1q \ge1, the objective is

∥C∥q=(∑j=1nCjq)1/q.\lVert C\rVert_q = \left(\sum_{j=1}^{n} C_j^q\right)^{1/q}.

When q=1q = 1, this is total completion time, equivalently average completion time up to the factor nn. Larger qq penalizes large completion times more strongly, while the limit as q→∞q \to\infty is the maximum completion time. These objectives let us examine whether an allocation policy’s aggregate performance comes at the expense of particularly late-finishing jobs.

Tight dependence on the dimension and norm. For every integer D≥1D \ge1 and real q≥1q \ge1, the competitive ratio of DRF is in

Θ(min⁡{qD1/(q+1),D}).\Theta\left(\min\left\{qD^{1/(q+1)},D\right\}\right).

Theorem 2 and Corollary 2 establish this bound for zero and arbitrary release times, respectively. The hidden constants are independent of both DD and qq. In particular, for each fixed qq, the dependence on the dimension is Θ(D1/(q+1))\Theta(D^{1/(q+1)}). The allocation rule itself does not depend on qq. These are tight bounds for DRF, not lower bounds for every nonclairvoyant algorithm: PF’s dimension-independent constant-factor guarantee for total completion time illustrates the distinction.

Sharper bounds for total completion time. We analyze the case q=1q = 1 separately to obtain a simpler proof and better constants. When all jobs are released at time zero, DRF is (4D+1)(4\sqrt{D} + 1)-competitive, while its competitive ratio is at least 1+D1 + \sqrt{D} (Theorem 1 and Proposition 1). For two and three resources, a more detailed analysis improves the upper bounds to 2+32 + \sqrt{3} and 2+72 + \sqrt{7}, respectively (Theorems 5 and 6). These low-dimensional guarantees are relevant when jobs compete for only a small number of resource types.

Arbitrary release times. We first analyze instances in which all jobs are available at time zero. A black-box reduction then extends the bounds to arbitrary release times at a cost of at most two (Theorem 8). The reduction applies to any positive allocation rule that depends only on the active set and does not decrease a remaining job’s rate when other jobs are removed. DRF itself is not monotone in this sense, but its simplified variant one-shot DRF is, and DRF completes every job no later than this variant (Lemma 1). In particular, the total-completion-time guarantee becomes 8D+28\sqrt{D} + 2, with improvements to 4+234 + 2\sqrt{3} and 4+274 + 2\sqrt{7} for two and three resources (Corollary 1).

Overview of the Analysis

For intuition, scale each resource’s supply to one and first consider jobs with binary demand vectors in these units. Each job therefore uses a nonempty subset of resources and needs one unit of each to run at unit rate. Assume also that all jobs are released at time zero and that rate caps do not restrict processing. We refer to § 2 for the full definitions of DRF and one-shot DRF.

In this special case, DRF initially increases every unfinished job’s rate equally until some resource becomes fully utilized. It freezes the rates of jobs using that resource and continues increasing the rates of the other jobs, repeating until no rate can be increased. One-shot DRF stops at the first such bottleneck. At time tt, let m(t)m(t) be the number of jobs unfinished under one-shot DRF, and let c(t)c(t) be the maximum number of these jobs that demand any one resource. One-shot DRF gives every unfinished job rate 1/c(t)1/c(t). We analyze this simpler rule: a coupling shows that full DRF completes every job no later, so the resulting upper bounds also hold for full DRF (Lemma 1).

The elementary bounds. Since c(t)≤m(t)c(t) \le m(t), every unfinished job receives at least rate 1/m(t)1/m(t). This is the rate these m(t)m(t) jobs would each receive if they shared a single unit-speed machine equally, ignoring their heterogeneous resource requirements. Such equal sharing is Round Robin. Since one-shot DRF also gives all unfinished jobs the same rate, and their total rate m(t)/c(t)m(t)/c(t) is at least one, every job completes under one-shot DRF no later than under this single-machine policy. In contrast, every feasible schedule has aggregate processing rate at most DD, because each job uses at least one unit-capacity resource. Round Robin’s constant competitive ratio thus gives the elementary O(D)O(D) upper bound (Theorem 4). For the Ω(D)\Omega(\sqrt{D}) lower bound, take one unit-size job per resource and Θ(D)\Theta(\sqrt{D}) unit-size jobs that each require every resource. All resources become tight together, so DRF gives every job rate Θ(1/D)\Theta(1/\sqrt{D}) and incurs total completion time Θ(D3/2)\Theta(D^{3/2}). A better scheduler can first complete the single-resource jobs in parallel and then process the remaining jobs sequentially, for total completion time O(D)O(D) (Proposition 1).

The key distinction: concentrated demand or rapid progress. The improvement comes from distinguishing between (i) times when some resource is demanded by a large fraction of unfinished jobs and (ii) times when no resource is so heavily shared. In case (i), one-shot DRF is slowed by a bottleneck that also constrains OPT. Importantly, all jobs still unfinished at time tt have received the same amount of processing, so each of their processing requirements is at least this amount. In particular, each of the c(t)c(t) jobs using the bottleneck requires at least this much processing on that resource even in OPT. In case (ii), c(t)c(t) is small relative to m(t)m(t), and one-shot DRF makes rapid aggregate progress at rate m(t)/c(t)m(t)/c(t). OPT’s aggregate rate, meanwhile, cannot exceed DD.

Cauchy–Schwarz for total completion time. We make this distinction quantitative by weighting the instantaneous completion-time cost m(t)m(t) in two complementary ways. Motivated by case (i), we weight m(t)m(t) by the fraction c(t)/m(t)c(t)/m(t) of unfinished jobs that demand the bottleneck resource, obtaining c(t)c(t). As noted above, each bottleneck job requires at least the common amount of processing already received by the unfinished jobs. Using these lower bounds on processing requirements and the nestedness of the unfinished sets, we bound ∫0∞c(t) dt\int_{0}^{\infty} c(t)\,\mathrm{d}t by O(1)OPTO(1)\mathrm{OPT} (Lemma 5). Motivated by case (ii), we instead weight m(t)m(t) by one-shot DRF’s aggregate processing rate m(t)/c(t)m(t)/c(t), obtaining m(t)2/c(t)m(t)^2/c(t). Comparing this rate with OPT’s aggregate capacity DD, we bound ∫{t:c(t)>0}m(t)2/c(t) dt\int_{\{t:c(t)>0\}} m(t)^2/c(t)\,\mathrm{d}t by O(D)⋅OPTO(D)\cdot\mathrm{OPT} (Lemma 4). Since the two weights are reciprocals, Cauchy–Schwarz combines the bounds:

ALG=∫0∞m(t) dt≤(∫{t:c(t)>0}m(t)2c(t) dt)1/2(∫0∞c(t) dt)1/2=O(D)⋅OPT.\mathrm{ALG}=\int_{0}^{\infty}m(t)\,\mathrm{d}t\leq\left(\int_{\{t:c(t)>0\}}\frac{m(t)^2}{c(t)}\,\mathrm{d}t\right)^{1/2}\left(\int_{0}^{\infty}c(t)\,\mathrm{d}t\right)^{1/2}=O(\sqrt{D})\cdot\mathrm{OPT}.

For two and three resources, we obtain smaller constants by treating each resource as a separate unit-speed machine. On each machine, a job’s processing requirement is the work it needs from that resource. We split each job’s completion cost among the machines using nonnegative weights that sum to one for that job, avoiding double counting. The sum of the optimal weighted completion costs on these machines then gives a lower bound on OPT. Unlike the aggregate-capacity bound motivated by case (ii), which uses only the total capacity DD, this bound accounts for which jobs compete for each resource (Section B).

LP dual fitting for general norms. For the ℓq\ell_q objective, the analogous identity is ∑jCjq=∫0∞qtq−1m(t) dt\sum_j C_j^q=\int_{0}^{\infty}qt^{q-1}m(t)\,\mathrm{d}t. We use a continuous-time linear programming relaxation of this objective and construct dual solutions from the one-shot DRF schedule. By weak duality, each feasible dual solution gives a lower bound on the optimal sum of qqth powers of completion times. Fix a threshold B∈[1,D]B \in[1,D] and call a time heavy if c(t)≥m(t)/Bc(t) \ge m(t)/B, and light otherwise. If heavy times contribute more to the objective, we partition time into intervals, starting a new interval whenever c(t)c(t) drops below half its value at the start of the current interval. For each interval, we choose a resource with the most unfinished jobs just before the interval ends and use it to construct the dual prices. If light times contribute more, we assign the same price to all resources and exploit the high aggregate processing rate. These two constructions yield competitive bounds O(qB1/q)O(qB^{1/q}) and O(qD/B)O(qD/B), respectively. Choosing B=Dq/(q+1)B = D^{q/(q+1)} balances them and gives O(qD1/(q+1))O(qD^{1/(q+1)}). The elementary processor-sharing comparison also gives an O(D)O(D) bound for every qq. The matching lower bounds extend the construction for total completion time described above to the ℓq\ell_q objective (Theorem 7).

General demands, rate caps, and release times. For nonbinary demands, we replace the number of jobs using a resource by the sum of their demands per unit of processing. For example, a job whose demand on a resource is 0.2 contributes 0.2 to this sum rather than one.

A job may also have a maximum useful resource allocation: once it receives all the resources it requests, it runs at its maximum processing rate, and giving it more resources does not make it faster. We represent this maximum rate by uju_j, the job’s rate cap. A job of size pjp_j therefore needs at least pj/ujp_j/u_j time even in OPT. We separate this unavoidable delay from congestion. In the remaining analysis, a cap-limited job counts fractionally, according to its actual rate relative to the common rate. On each resource, we sum the jobs’ demands multiplied by these fractions. These weighted sums replace the binary job counts in the arguments above; they are not the resource’s current utilization or the amount of work remaining on it.

Finally, consider arbitrary release times. Removing other active jobs reduces competition for resources, so one-shot DRF can only increase a remaining job’s rate. Equivalently, if we include not-yet-released jobs when computing the allocation at a given time, the rates assigned to already active jobs cannot increase. We use this fact to construct a virtual instance in which all jobs are released at time zero, choosing their sizes so that the algorithm has the same completion times as in the original instance. Each job’s virtual size is at most its original size plus the processing it receives before its original release time. Combining a schedule for this extra early processing with an optimal schedule for the original instance costs at most a factor of two (Theorem 8).

Other Related Work

The product-maximization principle underlying PF dates back to Nash [22]. Kelly, Maulloo, and Tan [18] developed PF for bandwidth sharing in communication networks. The closest worst-case results concern PF in nonclairvoyant scheduling under general packing constraints. As discussed above, Im, Kulkarni, and Munagala [14] proved a dimension-independent constant competitive ratio for total weighted completion time in this model. Jäger, Lindermayr, and Megow [16] improved the bound to 27, and to 4 when removing jobs cannot decrease the remaining jobs’ PF rates. This monotonicity holds, for example, in related-machine and restricted-assignment scheduling. In these two models, they also obtain a tight factor of 2 for unweighted completion time with simultaneous arrivals. These results do not transfer to DRF, whose completion-time guarantees necessarily depend on the number of resources.

Subsequent work on DRF studies weighted entitlements and indivisible resources [PPS15], and incentives under changing demands when allocations account for past service [12]. Unlike DRF, PF is not strategy-proof in general. Cole, Gkatzelis, and Goel [10] construct a truthful mechanism that guarantees each user at least a 1/e1/e fraction of its PF utility for fixed-proportion valuations. The mechanism withholds resources and thus gives up Pareto efficiency. These works concern allocation and strategic behavior rather than completion-time guarantees.

On a single unit-speed machine, processor sharing, or fractional Round Robin (RR), is tightly 2-competitive for total completion time when all jobs arrive together [20, 21]. For ℓq\ell_q norms of completion times, Moseley and Vardi [20] prove a tight (q+1)1/q(q+1)^{1/q} bound with simultaneous arrivals and integer q≥1q \ge1, and a factor of 4 with arbitrary release times and real q≥1q \ge1. With arbitrary releases, RR’s ratio for total completion time can exceed 2: Jäger, Lindermayr, and Megow [16] give a lower bound of 2.19. With a single resource and nonbinding rate caps, DRF reduces to RR. Our work determines how these guarantees degrade with the number of resources when jobs have heterogeneous resource demands.

A separate literature studies flow time, Cj−rjC_j-r_j, often with speed augmentation, which gives the online algorithm faster resources than its offline benchmark. See [4, 17] for single-machine results and [8] for identical parallel machines. Further results address unrelated machines [1, 15] and parallel jobs with general speedup curves [11]. The gradient-descent framework of Chen, Im, and Petety [9] gives further results across several scheduling models. These guarantees concern a different objective and benchmark from our same-capacity completion-time bounds. For broader background on online scheduling and resource augmentation, see the survey by Pruhs, Sgall, and Torng [PST04].

Fair sharing has also been studied extensively under stochastic workloads. Bonald and Massoulié [5] analyze the stability and throughput of fair bandwidth-sharing policies, while Bonald et al. [6] compare max-min fairness, PF, and balanced fairness in processor-sharing networks. Massoulié [19] establishes PF stability under more general service and routing models. Closer to our setting, Bonald and Roberts [7] compare DRF and PF under dynamic multiresource workloads, studying throughput and delay. Such analyses address stability and steady-state performance under probabilistic assumptions. Our competitive analysis instead compares DRF with a clairvoyant optimum on every finite instance, without distributional assumptions on arrivals or job sizes.

Our analysis also connects to LP-based dual fitting. Anand, Garg, and Kumar [1] apply this technique to weighted flow time with resource augmentation. The PF analyses of Im, Kulkarni, and Munagala [14] and Jäger, Lindermayr, and Megow [16] use the optimality conditions of PF’s instantaneous allocation program to guide the construction of dual lower bounds. For general ℓq\ell_q norms, our dual variables instead exploit DRF’s bottleneck structure.

Organization of the Paper

§ 2 defines the model and the two DRF variants. § 3 establishes the tight asymptotic bound for total completion time, and Section B in the appendix sharpens the upper bounds for two and three resources. Section 4 gives the upper and lower bounds for general ℓq\ell_q norms. Proofs omitted from the main body are also collected in the appendix. Finally, Section D in the appendix proves the black-box reduction and states the resulting guarantees for arbitrary release times.

Model and Algorithms

Multidimensional Scheduling

We consider nn jobs sharing DD divisible resources, such as CPU, memory, or network bandwidth, each of unit capacity. Job jj has a processing requirement pj>0p_j > 0, a release time rj≥0r_j \ge0, a rate cap uj>0u_j > 0, and a demand vector

aj=(aj1,…,ajD)∈[0,1]D with ∥aj∥∞=1.a_j = (a_{j1}, \ldots, a_{jD}) \in[0,1]^D \text{ with } \lVert a_j \rVert_\infty= 1.

The entry ajda_{jd} is the amount of resource dd that job jj uses per unit of processing rate. The resource that job jj demands most is its dominant resource, and we normalize aja_j so that this entry equals one. Unless stated otherwise, all jobs are released at time zero. We extend our results to arbitrary release times in Section D.

A schedule specifies a rate vector x(t)∈R≥0nx(t) \in\mathbb{R}_{\geq0}^n at every time t≥0t \geq0. We set xj(t)=0x_j(t) = 0 before job jj is released. Running job jj at rate xj(t)x_j(t) consumes ajdxj(t)a_{jd}x_j(t) units of resource dd. A schedule is feasible if it satisfies the following three constraints.

  • Rate caps. 0≤xj(t)≤uj0 \leq x_j(t) \leq u_j for every job jj and time tt.

  • Resource capacities. ∑j=1najdxj(t)≤1\sum_{j=1}^{n} a_{jd}x_j(t) \leq1 for every resource dd and time tt.

  • Job completion. Every job jj has a finite completion time CjC_j, which is the time at which it has received its full processing requirement, that is, ∫rjCjxj(s) ds=pj\int_{r_j}^{C_j} x_j(s)\,\mathrm{d}s = p_j.

We call a single vector x∈R≥0nx \in\mathbb{R}_{\geq0}^n a feasible rate vector if it satisfies the rate caps and resource capacities.

References

  1. [1]S. Anand, Naveen Garg, and Amit Kumar. Resource augmentation for weighted flow-time explained by dual fitting. In: SODA. 2012, pp. 1228–1241.DOI
  2. [2]Apache Software Foundation. Apache Hadoop 3.5.0: Hadoop: Fair Scheduler. Accessed: 2026-09-30. URL: https://hadoop.apache.org/docs/r3.5.0/hadoop-yarn/hadoop-yarn-site/FairScheduler.html (visited on 09/30/2026).
  3. [3]Apache Software Foundation. Apache Mesos: Roles. Accessed: 2026-09-30. Documentation of the weighted dominant resource fairness allocator. URL: https://mesos.apache.org/documentation/latest/roles/ (visited on 09/30/2026).
  4. [4]Nikhil Bansal and Kirk Pruhs. Server Scheduling to Balance Priorities, Fairness, and Average Quality of Service. In: SIAM J. Comput. 39.7 (2010), pp. 3311–3335.DOI
  5. [5]Thomas Bonald and Laurent Massoulié. Impact of fairness on Internet performance. In: SIGMETRICS/Performance. 2001, pp. 82–91.
  6. [6]Thomas Bonald, Laurent Massoulié, Alexandre Proutière, and Jorma T. Virtamo. A queueing analysis of max-min fairness, proportional fairness and balanced fairness. In: Queueing Syst. Theory Appl. 53.1-2 (2006), pp. 65–84.DOI
  7. [7]Thomas Bonald and James W. Roberts. Multi-Resource Fairness: Objectives, Algorithms and Performance. In: SIGMETRICS. 2015, pp. 31–42.arxiv.org/abs/1410.0782
  8. [8]Chandra Chekuri, Ashish Goel, Sanjeev Khanna, and Amit Kumar. Multi-processor scheduling to minimize flow time with epsilon resource augmentation. In: STOC. 2004, pp. 363–372.
  9. [9]Qingyun Chen, Sungjin Im, and Aditya Petety. Online Scheduling via Gradient Descent for Weighted Flow Time Minimization. In: SODA. 2025, pp. 3802–3841.arxiv.org/abs/2409.03020
  10. [10]Richard Cole, Vasilis Gkatzelis, and Gagan Goel. Mechanism design for fair division: allocating divisible items without payments. In: EC. 2013, pp. 251–268.
  11. [11]Jeff Edmonds and Kirk Pruhs. Scalably scheduling processes with arbitrary speedup curves. In: ACM Trans. Algorithms 8.3 (2012), 28:1–28:10.
  12. [12]Giannis Fikioris, Rachit Agarwal, and Éva Tardos. Incentives in Dominant Resource Fair Allocation Under Dynamic Demands. In: SAGT. 2024, pp. 108–125.arxiv.org/abs/2109.12401
  13. [13]Ali Ghodsi, Matei Zaharia, Benjamin Hindman, Andy Konwinski, Scott Shenker, and Ion Stoica. Dominant Resource Fairness: Fair Allocation of Multiple Resource Types. In: NSDI. 2011.DOI
  14. [14]Sungjin Im, Janardhan Kulkarni, and Kamesh Munagala. Competitive Algorithms from Competitive Equilibria: Non-Clairvoyant Scheduling under Polyhedral Constraints. In: J. ACM 65.1 (2018), 3:1–3:33.
  15. [15]Sungjin Im, Janardhan Kulkarni, Kamesh Munagala, and Kirk Pruhs. SelfishMigrate: A Scalable Algorithm for Non-clairvoyantly Scheduling Heterogeneous Processors. In: FOCS. 2014, pp. 531–540.arxiv.org/abs/1404.1943
  16. [16]Sven Jäger, Alexander Lindermayr, and Nicole Megow. The Power of Proportional Fairness for Nonclairvoyant Polytope Scheduling. In: SIAM J. Comput. 55.2 (2026), pp. 247–279.DOI
  17. [17]Bala Kalyanasundaram and Kirk Pruhs. Speed is as powerful as clairvoyance. In: J. ACM 47.4 (2000), pp. 617–643.DOI
  18. [18]Frank P. Kelly, A. K. Maulloo, and David Kim Hong Tan. Rate control for communication networks: shadow prices, proportional fairness and stability. In: J. Oper. Res. Soc. 49.3 (1998), pp. 237–252.
  19. [19]Laurent Massoulié. Structural Properties of Proportional Fairness: Stability and Insensitivity. In: The Annals of Applied Probability 17.3 (2007), pp. 809–839.DOI
  20. [20]Benjamin Moseley and Shai Vardi. The efficiency-fairness balance of Round Robin scheduling. In: Oper. Res. Lett. 50.1 (2022), pp. 20–27.DOI
  21. [21]Rajeev Motwani, Steven J. Phillips, and Eric Torng. Non-Clairvoyant Scheduling. In: Theor. Comput. Sci. 130.1 (1994), pp. 17–47.
  22. [22]John F. Nash Jr. The Bargaining Problem. In: Econometrica 18.2 (1950), pp. 155–162.

Paper details

vlnc:W_x34wh3m5
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC BY 4.0
Usage

views · 9

downloads · 1

A view counts once per browser per day, a download each time the PDF is requested.

  • Computer Science

Not recorded for this paper

View statement
Looking for related papers…
Contents