Capacity Credit of Data-Centre Flexibility: The Role of Workload Scheduling and Usable Battery Energy

Abstract

Data centres that offer the same reduction in grid demand can make different contributions to supply adequacy. We estimate the effective load-carrying capability of workload scheduling and on-site batteries by matching expected unserved energy across paired simulations. Longer task deadlines increase capacity credit by giving operators more choice over when to defer and recover work. A fixed evening commitment shifts more work than deadline-based scheduling but delivers a smaller reduction in expected unserved energy. Protected backup reserves leave uninterruptible power supplies with limited capacity credit, while longer discharge durations raise the credit of dedicated batteries at the same response rating. These findings suggest assessing recovery deadlines and dispatchable energy alongside offered demand reductions.

Paper details

vlnc:W_yxuzavp4
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
arXiv nonexclusive license
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…