Assessing Data Center Hosting Capacity Considering Electromagnetic Transient Dynamics

Abstract

Hosting capacity is commonly assessed with steady-state optimization, which leaves the dynamic response of the data center and the grid at the resulting operating point untested. This paper assesses candidate data center capacities by coupling a unit commitment (UC) model with electromagnetic transient (EMT) simulation. During the capacity search, the UC model determines the economic dispatch for each tested data center capacity, and the resulting operating points are tested for settling with the generators committed online by the UC model and after a selected synchronous generator outage. Three nested capacities are obtained: the optimization-based steady-state capacity, the dynamic pre-outage capacity, and the post-outage dynamic capacity, each bounded by the previous one. On a test system with a detailed data center model, both dynamic capacities fall well below the optimization capacity, and the ranking of connection locations changes with the assessment stage and with the outage. In the most severe outage case at each candidate bus, the capacity is about 30% below the steady-state capacity. Thus, the dynamic response of the data center and the grid should be part of the hosting capacity assessment, and the comparison of connection locations should be made on the post-outage dynamic capacity.

Paper details

vlnc:W_mxb2ecqk
Version
v1 · latest
Published
Fresh — added to the Hub within the last 30 days
Added
License
CC-BY-NC-SA-4.0
Usage

views · 0

downloads · 0

A view counts once per browser per day, a download each time the PDF is requested.

  • Engineering

Not recorded for this paper

View statement
Looking for related papers…